34-119-28778

Well Details

Well ID: 34-119-28778
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Madison Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: CONSOL CR
License Status: Producing
License Date: 2013-01-28
Spud Date: 2013-04-25
Spud Drilling Contractor: PEP DRLG
Final Drill Date: 2013-05-05
Well Total Depth: 6248.00 ft
Configuration: Vertical
Latitude: 40.090000
Longitude: -81.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-01-28 Proposed Formations:QUEENSTON THRU TREMPEALEAU, Issued Date:1/28/2013, Expired Date:1/28/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-05-05
Completion Report Received 2013-11-13
Construction Permit Expires 2015-01-28
Change of Owner 2017-05-01 Operator changed from 7578, ENERVEST OPERATING LLC, to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2017-05-01

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-11-15 6015 6062 52
6015 6062 52
6015 6062 52

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-07-01 ACID 15 924 Gal 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ENERVEST OPERATING LLC 19366.00 4.00 172
2014 ENERVEST OPERATING LLC 20166.00 2.00 365
2015 ENERVEST OPERATING LLC 12580.00 55.00 365
2016 ENERVEST OPERATING LLC 11787.00 0.00 366
2017 M & R INVESTMENTS OHIO LLC 8491.00 0.00 365
2018 M & R INVESTMENTS OHIO LLC 9894.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ENERVEST OPERATING LLC Brine 0 172
2014 ENERVEST OPERATING LLC Brine 63 365
2015 ENERVEST OPERATING LLC Brine 9 365
2016 ENERVEST OPERATING LLC Brine 0 366
2017 ENERVEST OPERATING LLC Brine 0 193
2018 M & R INVESTMENTS OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-153061778 2017-1-30 0:00: PW No Violations 1.00
-1732995576 2013-5-8 0:00:0 DD No Violations
-376960145 2013-9-20 0:00: PL No Violations 0.50
-443341618 2013-5-6 0:00:0 DD No Violations 1.00
-470682707 2013-4-17 0:00: DD No Violations 2.00
0153061778 2017-01-30 Production Wells No Violations

-210 barrel steel tank and a 1200 gallon poly tank. The earthen impoundment and identification are sufficient. The lease road is in good order with no substantial erosion. The production records are current with the Division of Oil and Gas.

0247346665 2013-04-29 Drill / Deepen / Reopen No Violations Pep drilling has drilled a 11open hole to depth of 1244. The casing was 23lb /ft and ran to depth of 1225 was at ground level. Pep ran 3 centrilizers one at bottom, one at middle , one at top. Universal well services cemented 325 sacks of regular cement 3% CACL AND 1/4 lb per sack of celloflake back to surface. There was 10 barrel of cement slurry returns.
0376960145 2013-09-20 Preliminary Restoration No Violations Preliminary Restoration passed on 9-20-13 by Patrick Shreve.
0443341618 2013-05-06 Drill / Deepen / Reopen No Violations Rig has drilled well to total depth 6248. Rig had went fluid thru the Gull River and kept weight of fluid to about 9.2lb per gallon. The rig is waiting on a side wall core truck to show up.
0470682707 2013-04-17 Drill / Deepen / Reopen No Violations Jake Glascock and I stopped by to see progress on site construction at well head. Energy services are constructing site.
0608113584 2013-06-27 Completion Testing No Violations I stopped by site and Chipco was getting ready for perforating on 6-28-13. The acidizing job will be on 7-1-13.
0858412846 2013-04-27 Drill / Deepen / Reopen No Violations Pep drilling rig 10 is running 11.7532lb/ft casing in to depth of 672in an 14.75open hole to depth of 694. Os Power tongs service on location for turning casing in and Universal well services in for Cementing well. They ran 370 sacks of class A cement at 3% CACL in and had 36 barrel of returns back of cement slurry.
0938458244 2013-09-20 Production Wells No Violations Well is producing well with a gas pluger lift system (Rabbit well). There is a 4.5x2.375well head. A tubing valve Rabbit catcher 2motor valve and 2choke valve. There is a 210 barrel steel tank and 2100 gal plastic tank with dike and identification in place.
1264988769 2013-05-02 Drill / Deepen / Reopen No Violations On day of inspection Rick Trippel, Mallory Stanton, Teresa McQuade and I stopped in to look at well. Rig was drilling at depth of 4060. 10,00lbs weight on bit. Rig was on PDC Bit. Trevor Shaffer showed up and met the new Geologist.
1366968301 2013-04-26 Drill / Deepen / Reopen No Violations Pep drilling drilled 22open hole to 44. They ran in 44of 1675lb/ft casing. They cut slots on side and landed pipe on bottom. Universal well services broke circulation and circulated cement back to surface.
1367762568 2013-04-28 Drill / Deepen / Reopen No Violations Pressure tested pipe about 300 psi and held for 30 minutes. Test passed.
1368035597 2013-05-07 Drill / Deepen / Reopen No Violations Met with the consultant Bill Kelly on well. The sidewall core truck is running behind. Schlumberger will run side wall cores.
1373888221 2013-07-01 Completion Testing No Violations Producers were in to pressure test pipe to 3605psi and dump 15%acid displace with H2O. Break down was at 1367psi. 72 barrel of Hydrochloric acid. Than displaced down with 26 barrel of water.
1732995576 2013-05-08 Drill / Deepen / Reopen No Violations Pep drilling is running pipe after Schlumberger ran sidewall cores and logged hole. The loggers Total depth was 6252. They ran range 3 pipe of 10.5lb/ft 4.5casing to depth of 6195. Ran 4.5guide shoe at bottom. The flapper insert was at 10 up from the bottom in the nipple joint. The 2 stage tool of DV tool was ran at 5436. Universal is cementing casing in. The 1st stage will have 115 sacks of SRRC blend. The 2nd stage will have 150 sacks of 50/50 poz bringing top of cement up to 4700.
247346665 2013-4-29 0:00: DD No Violations 3.00
608113584 2013-6-27 0:00: CT No Violations 1.00
858412846 2013-4-27 0:00: DD No Violations 6.00
938458244 2013-9-20 0:00: PW No Violations 1.00

For data sources see[9]

References