X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28804

Well Details

Well ID: 34-119-28804
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Licking Township
Operator Name: DERRICK PETROLEUM INC
Well Pad ID:
Farm/Lease Name: HILLBILLY MARSH FARM
License Status: Producing
License Date: 2015-05-05
Spud Date: 2015-08-03
Spud Drilling Contractor: H & D DRILLING
Final Drill Date: 2015-08-25
Well Total Depth: 3000.00 ft
Configuration: Vertical
Latitude: 40.080000
Longitude: -82.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-05-05 Proposed Formations:CLINTON, Issued Date:5/5/2015, Expired Date:5/4/2017 12:00:00 PM, Drilling unit acres:241.79, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-08-25 STATUS BASED ON WELL LOG RECEIVED-ALE
Completion Report Received 2016-04-06 STATUS BASED ON WELL LOG RECEIVED-ALE
Construction Permit Expires 2017-05-04 STATUS BASED ON WELL LOG RECEIVED-ALE
Record Last Modified 2017-10-23 STATUS BASED ON WELL LOG RECEIVED-ALE

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-10-19 H2O 0 1500 Lbs 10020 Buckstin service rig is over well and Reliance well services is fracing well. The 4.5’’casing is ran to 3000’. The frac company was premixing biocide in the 300 barrel tanks upon entering well site. Once the job got started break down pressure was at 1064 psi. Then shut down at 11:59 and swapped pumping unit out due to a hydraulic leak. At approximately 12:38 Frac Company started pumping down hole at 21 barrel per minute. The sand pad was the next segment started then at 12:46 the frac com

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 DERRICK PETROLEUM INC 0.00 725.00 288
2016 DERRICK PETROLEUM INC 0.00 749.00 365
2017 DERRICK PETROLEUM INC 0.00 670.00 365
2018 DERRICK PETROLEUM INC 0.00 584.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 DERRICK PETROLEUM INC Brine 289 288
2016 DERRICK PETROLEUM INC Brine 110 365
2017 DERRICK PETROLEUM INC Brine 88 365
2018 DERRICK PETROLEUM INC Brine 108 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1104842663 2015-8-13 0:00: DD No Violations 2.00
-1575914131 2016-11-7 0:00: PL No Violations 0.50
-1640285540 2016-11-7 0:00: PW No Violations 0.50
-176160584 2015-8-11 0:00: CS No Violations 3.00
0176160584 2015-08-11 Casing String Witnessed No Violations H&D Drilling drilled a 10open hole to depth of 360. They ran 17lb/ft of 7casing to a depth of 352. There were 3-7centrilizers and 1-7guide shoe. Formation Cemeneting ran 110 sacks of Regular Class A cement at 3%CaCl. Good circulation and 5 barrel of cement returns. No pressure test.
1104842663 2015-08-13 Drill / Deepen / Reopen No Violations H&D Drilling rig pressured upon 7casing to 300 psi for 30 minutes. Test passed.
1445863908 2015-10-19 Completion Testing No Violations
1575914131 2016-11-07 Preliminary Restoration No Violations Preliminary Restoration passed per 1509.072 by Patrick Shreve on 11-7-16. Good vegetation is established and no erosion issues.
1640285540 2016-11-07 Production Wells No Violations

-100 barrel steel tank batteries that is enclosed within an impoundment.

For data sources see[8]

References