If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-119-28804 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.08,"lon":-82.18,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Muskingum | |
| Municipality: Licking Township | |
| Operator Name: DERRICK PETROLEUM INC | |
| Well Pad ID: | |
| Farm/Lease Name: HILLBILLY MARSH FARM | |
| License Status: Producing | |
| License Date: 2015-05-05 | |
| Spud Date: 2015-08-03 | |
| Spud Drilling Contractor: H & D DRILLING | |
| Final Drill Date: 2015-08-25 | |
| Well Total Depth: 3000.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.080000 | |
| Longitude: -82.180000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-05-05 | Proposed Formations:CLINTON, Issued Date:5/5/2015, Expired Date:5/4/2017 12:00:00 PM, Drilling unit acres:241.79, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2015-08-25 | STATUS BASED ON WELL LOG RECEIVED-ALE |
| Completion Report Received | 2016-04-06 | STATUS BASED ON WELL LOG RECEIVED-ALE |
| Construction Permit Expires | 2017-05-04 | STATUS BASED ON WELL LOG RECEIVED-ALE |
| Record Last Modified | 2017-10-23 | STATUS BASED ON WELL LOG RECEIVED-ALE |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-10-19 | H2O | 0 | 1500 Lbs | 10020 | Buckstin service rig is over well and Reliance well services is fracing well. The 4.5’’casing is ran to 3000’. The frac company was premixing biocide in the 300 barrel tanks upon entering well site. Once the job got started break down pressure was at 1064 psi. Then shut down at 11:59 and swapped pumping unit out due to a hydraulic leak. At approximately 12:38 Frac Company started pumping down hole at 21 barrel per minute. The sand pad was the next segment started then at 12:46 the frac com |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | DERRICK PETROLEUM INC | 0.00 | 725.00 | 288 |
| 2016 | DERRICK PETROLEUM INC | 0.00 | 749.00 | 365 |
| 2017 | DERRICK PETROLEUM INC | 0.00 | 670.00 | 365 |
| 2018 | DERRICK PETROLEUM INC | 0.00 | 584.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | DERRICK PETROLEUM INC | Brine | 289 | 288 |
| 2016 | DERRICK PETROLEUM INC | Brine | 110 | 365 |
| 2017 | DERRICK PETROLEUM INC | Brine | 88 | 365 |
| 2018 | DERRICK PETROLEUM INC | Brine | 108 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1104842663 | 2015-8-13 0:00: | DD | No Violations | 2.00 |
| -1575914131 | 2016-11-7 0:00: | PL | No Violations | 0.50 |
| -1640285540 | 2016-11-7 0:00: | PW | No Violations | 0.50 |
| -176160584 | 2015-8-11 0:00: | CS | No Violations | 3.00 |
| 0176160584 | 2015-08-11 | Casing String Witnessed | No Violations | H&D Drilling drilled a 10open hole to depth of 360. They ran 17lb/ft of 7casing to a depth of 352. There were 3-7centrilizers and 1-7guide shoe. Formation Cemeneting ran 110 sacks of Regular Class A cement at 3%CaCl. Good circulation and 5 barrel of cement returns. No pressure test. |
| 1104842663 | 2015-08-13 | Drill / Deepen / Reopen | No Violations | H&D Drilling rig pressured upon 7casing to 300 psi for 30 minutes. Test passed. |
| 1445863908 | 2015-10-19 | Completion Testing | No Violations | |
| 1575914131 | 2016-11-07 | Preliminary Restoration | No Violations | Preliminary Restoration passed per 1509.072 by Patrick Shreve on 11-7-16. Good vegetation is established and no erosion issues. |
| 1640285540 | 2016-11-07 | Production Wells | No Violations
-100 barrel steel tank batteries that is enclosed within an impoundment. |
For data sources see[8]