X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28809

Well Details

Well ID: 34-119-28809
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Licking Township
Operator Name: DERRICK PETROLEUM INC
Well Pad ID:
Farm/Lease Name: WESTBROOK
License Status: Producing
License Date: 2018-08-30
Spud Date: 2018-10-09
Spud Drilling Contractor: H & D DRILLING
Final Drill Date: 2018-11-01
Well Total Depth: 3010.00 ft
Configuration: Vertical
Latitude: 40.090000
Longitude: -82.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-08-30 Proposed Formations:CLINTON, Issued Date:8/30/2018, Expired Date:8/29/2020 12:00:00 PM, Drilling unit acres:66.13, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-11-01
Completion Report Received 2019-02-04
Record Last Modified 2019-02-05
Construction Permit Expires 2020-08-29

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-11-13 H2O 0 61000 Gal 20000 Producers Service Corporation The inspection is conducted as a stimulation inspection. H &D Drilling has rig over the well. Producers well services are stimulating(fracking) the well. The 4 ½ inch casing was loaded. There was 300 gallons of 15 % hydrochloric acid for break down. Then pressure tested the lines and pumps at 1482 psi. They initially broke well down at 1047 psi. The average treating pressure was at 700 psi at 20 barrels per min. They started bringing the 20/40 sand in at a ¼ of a lb. per barrel. They ended wi

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 DERRICK PETROLEUM INC 0.00 0.00 34

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 DERRICK PETROLEUM INC Brine 330 34

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0576972135 2018-10-16 Drill / Deepen / Reopen No Violations The inspection is conducted under drilling operations. H & D Drilling was over well bailing out the water inside the 7-inch diameter casing from the surface job. 10-12-18 was the date the surface was cemented in-place. I did not witness the job. The open hole was 10 inches and was at the depth of 360 feet. The 7-
0809887948 2018-11-13 Completion Testing No Violations

-minute shut in pressure was at 746 psi. Producers ran a total of 40 gallon of friction reducer, 9 gallon of clay stabilizer, 36 gallons of pro flow and 18 gallons of bio clear. The total sand was 20,000 lbs. and the total water was 61,000 gallons.

1539621919 2018-10-05 Drill / Deepen / Reopen No Violations The inspection was conducted under a new well drilling permit. H & D Drilling is moving rig components in and the mast is up on drilling rig. The pit is lined and in place. The rig has not spudded and will notify on the day of spudding.
1540478804 2018-10-24 Drill / Deepen / Reopen No Violations The inspection is conducted under a drilling inspection. H & D drilling is at a depth of 2300 foot. They are currently in the middle of the Big Lime formation. They are down to a joint every 1 1/2hr. Derrick Petroleum has hauled in large stone to the lease road and was building up the road.
576972135 2018-10-16 0:00 DD No Violations 1.20
809887948 2018-11-13 0:00 CT No Violations 4.00

For data sources see[8]

References