If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24346 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.85,"lon":-81.45,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000606 | |
Farm/Lease Name: MILEY | |
License Status: Plugged Back | |
License Date: 2011-09-15 | |
Spud Date: 2011-10-11 | |
Spud Drilling Contractor: L WILSON DRLG | |
Final Drill Date: 2011-11-25 | |
Well Total Depth: 7560.00 ft | |
Configuration: Vertical | |
Latitude: 39.850000 | |
Longitude: -81.450000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-09-15 | Proposed Formations:UTICA-BLACK RIVER, Issued Date:9/15/2011, Expired Date:9/14/2013 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2011-11-25 | |
Plugged Back | 2012-02-14 | |
Completion Report Received | 2012-03-20 | |
Change of Owner | 2012-03-21 | Operator changed from 8844, ECLIPSE RESOURCES I LP to 8943, ANTERO RES APPALACHIAN CORP |
Construction Permit Expires | 2013-09-14 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-01-11 | 9218 | 9436 | 60 |
2013-01-11 | 8316 | 8535 | 60 |
2013-01-11 | 10419 | 10638 | 60 |
2013-01-11 | 12522 | 12741 | 60 |
2013-01-11 | 12222 | 12440 | 60 |
2013-01-11 | 12823 | 13091 | 60 |
2013-01-11 | 13424 | 13642 | 60 |
2013-01-11 | 13123 | 13342 | 60 |
2013-01-14 | 11020 | 11239 | 60 |
2013-01-11 | 10720 | 10938 | 60 |
2013-01-11 | 11321 | 11539 | 60 |
2013-01-11 | 8917 | 9136 | 60 |
2013-01-11 | 11921 | 12190 | 60 |
13424 | 13642 | 60 | |
13123 | 13342 | 60 | |
12823 | 13091 | 60 | |
12522 | 12741 | 60 | |
12222 | 12440 | 60 | |
11921 | 12190 | 60 | |
11621 | 11839 | 60 | |
11321 | 11539 | 60 | |
10720 | 10938 | 60 | |
10419 | 10638 | 60 | |
10119 | 10337 | 60 | |
9818 | 10037 | 60 | |
9518 | 9787 | 60 | |
9218 | 9436 | 60 | |
8917 | 9136 | 60 | |
8617 | 8835 | 60 | |
8316 | 8535 | 60 | |
8016 | 8234 | 60 | |
7716 | 7984 | 60 | |
7415 | 7634 | 60 | |
11020 | 11239 | 60 | |
2013-01-11 | 11621 | 11839 | 60 |
7415 | 7634 | 60 | |
2013-01-11 | 9518 | 9787 | 60 |
2013-01-11 | 10119 | 10337 | 60 |
2013-01-11 | 9818 | 10037 | 60 |
2013-01-11 | 7716 | 7984 | 60 |
2013-01-11 | 7415 | 7634 | 60 |
2013-01-11 | 8016 | 8234 | 60 |
2013-01-11 | 8617 | 8835 | 60 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/08/2012 | 06/08/2012 | 7,428 | 9,056,964 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ethoxylated Nonylphenol | 68412-54-4 | 5.00% | 0.00% | ||||
Isopropyl Alcohol | 67-63-0 | 3.00% | 0.00% | |||||
Ammonium Chloride | 12125-02-9 | 5.00% | 0.00% | |||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 13.00% | 0.00% | |||||
Petroleum Distillates | 64742-47-8 | 60.00% | 0.06% | |||||
Cinnamaldehyde | 104-55-2 | 5.00% | 0.00% | |||||
Anionic Copolymer | Proprietary | Proprietary | ||||||
Triethyl Phosphate | 78-40-0 | 3.00% | 0.00% | |||||
Petroleum Distillates | 64742-47-8 | 22.00% | 0.01% | |||||
Water | 7732-18-5 | 30.00% | 0.00% | |||||
Water | 7732-18-5 | 40.00% | 0.02% | |||||
Suspending agent (solid) | 14808-60-7 | 3.00% | 0.00% | |||||
Surfactant | 68439-51-0 | 3.00% | 0.00% | |||||
Water | 7732-18-5 | 20.00% | 0.00% | |||||
Water | 7732-18-5 | 87.50% | 0.10% | |||||
Ethoxylated alcohol blend | Proprietary | 5.00% | 0.00% | |||||
Ethylene Glycol | 107-21-1 | 31.00% | 0.00% | |||||
N,N-Dimethylformamide | 1968-12-02 | 15.00% | 0.00% | |||||
Deionized Water | 7732-18-5 | 28.00% | 0.00% | |||||
SI-1000 | U.S. Well Services, LLC | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 20.00% | 0.01% | ||
AI-300 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | 2-Butoxyethanol | 111-76-2 | 7.00% | 0.00% | ||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100.00% | 10.84% | ||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Guar Gum | 9000-30-0 | 50.00% | 0.01% | ||
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00% | 0.01% | ||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Anionic Polyacrylamide | Proprietary | Proprietary | |||
Water | Carrier/Base Fluid | Water | 7732-18-5 | 100.00% | 88.88% | |||
HCL Acid (12.5%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7641-01-01 | 18.00% | 0.04% | ||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100.00% | 0.01% |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ANTERO RESOURCES CORPORATION | Brine | 0 | 0 |
2013 | ANTERO RESOURCES CORPORATION | Brine | 4615 | 109 |
2014 | ANTERO RESOURCES CORPORATION | Brine | 4176 | 361 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 3173 | 363 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 1406 | 359 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 1470 | 364 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 1761 | 343 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 374 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1004068545 | 2012-4-16 0:00: | DD | No Violations | |
-1385818513 | 2011-12-12 0:00 | DD | No Violations | |
-1558688822 | 2011-12-19 0:00 | DD | No Violations | |
-1626817896 | 2011-11-25 0:00 | DD | No Violations | |
-1727344247 | 2012-5-26 0:00: | DD | No Violations | |
-1806656373 | 2013-12-9 0:00: | PL | No Violations | 0.50 |
-1945670044 | 2017-8-2 0:00:0 | FR | No Violations | 1.00 |
-325042742 | 2013-12-18 0:00 | PL | No Violations | 1.00 |
-423919432 | 2012-5-9 0:00:0 | DD | No Violations | |
-475147044 | 2015-12-2 0:00: | PW | No Violations | 1.00 |
-616145922 | 2012-3-29 0:00: | DD | No Violations | |
-639008991 | 2017-1-27 0:00: | PW | No Violations | 1.00 |
-85226430 | 2011-10-7 0:00: | DD | No Violations | |
0005406111 | 2012-02-13 | Drill / Deepen / Reopen | No Violations | Stopped by site for update they were logging well and once logging completed they will start drill string back in well to prepare to plug well back too drill horizontal. |
0085226430 | 2011-10-07 | Drill / Deepen / Reopen | No Violations | Operator starting pit construction today. |
0099139071 | 2012-04-09 | Drill / Deepen / Reopen | No Violations | Stopped by drill site for update they were@12,445 deep stuck in hole and they backed off drill sting@9450 came out of hole to put down hole tools on they were going back in well when I was on site to attempt to free up bottom hole assembly. |
0185007216 | 2011-12-11 | Drill / Deepen / Reopen | No Violations | Work over rig on site trying to condition hole so they can get logging tool to bottom. |
0325042742 | 2013-12-18 | Preliminary Restoration | No Violations | The preliminary restoration requirements have been met. |
0423919432 | 2012-05-09 | Drill / Deepen / Reopen | No Violations | Stopped by drill site for update they were running Gyro log to determine the direction of hole. |
0439249982 | 2011-10-11 | Drill / Deepen / Reopen | No Violations | HAD Drilling moving top hole rig in on site to set conductor pipe. They set 50 of 24 casing then moved off well |
0475147044 | 2015-12-02 | Production Wells | No Violations | I am accompanied on my inspection today by Inspector Jim Nicholson. Our inspection finds the well is equipped with a plunger lift system. The well could be heard flowing while on site. The tank battery is comprised to eight 400 barrel tanks set in a plastic lined steel containment. |
0616145922 | 2012-03-29 | Drill / Deepen / Reopen | No Violations | Drilling lateral@7100. |
0639008991 | 2017-01-27 | Production Wells | No Violations | The purpose of my inspection is a status check on a producing well. The pad name is Miley Pad and there are a total of two wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, and two gas processing units. The vapor recovery system consists of a compressor and two Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present. |
0761029528 | 2011-09-23 | Drill / Deepen / Reopen | No Violations | Stopped by future drill site to check on progress of site construction, builder was having stone hauled onto pad and put into place site nearly completed, operator stated that rig should be on site by 10/1/2011. |
0850749687 | 2012-04-05 | Drill / Deepen / Reopen | No Violations | Stopped by rig for update they wee drilling lateral section of well@11,714 should be at total depth later this week. |
1004068545 | 2012-04-16 | Drill / Deepen / Reopen | No Violations | Drilling lateral section@11,000 should be at total depth later this week. |
1097768729 | 2012-06-08 | Completion Testing | No Violations | Rigging up frac crew US Well services will perform frac work on site. |
1145888498 | 2013-12-09 | Preliminary Restoration | No Violations | The preliminary restoration requirements have been met. |
1256020178 | 2011-11-14 | Drill / Deepen / Reopen | No Violations | Rig was drilling at @ 7150 and nearing the core point of @ 7200. They plan on coring entire Utica Shale section and Trenton top and then plug well back to prepare to drill horizontal. |
1320494121 | 2011-11-04 | Drill / Deepen / Reopen | No Violations | On site to witness testing of BOP. Stack company personnel tested blind rams at @500 PSI for 15 minutes with no decline in pressure. They also tested annular and choke system for 15 minutes each with no decline in pressures. It was noted that right side of choke system is in need of a choke valve replaced because the handle on valve is broken. The company man stated that one will be in place before drilling into pay zone. |
1332065029 | 2012-03-15 | Drill / Deepen / Reopen | No Violations | Company rep called and wanted to close old air pit told them to solidify it with cement and close, he stated that there will be drilling rig on site to complete well using closed loop pit system next week. |
1332753724 | 2012-03-25 | Plug / Plug Back | No Violations | Company rep Norm Wood from Antero called and stated they wanted to set a additional plug in well, they drilled 200 of original plug set at 6000 and drill bit assembly would not attempt to cut lateral so decision was made to set another 200 plug on top of existing plug so they ran drill string back into well to 6200 and set plug they are currently waiting on cement to harden up so they can attempt to get well bore kicked off. |
1334096216 | 2012-04-10 | Drill / Deepen / Reopen | No Violations | Stopped by drill rig for update they were still trying to get a hold of down hole assembly ,after several attempts the decision was made to come out of hole then go back in hole and sidetrack around bottom hole assembly.
Left a total of 2198 of bottom hole assembly in well bottom hole motor and drill collars and drill pipe with a total value of 550,000 dollars. |
1334999590 | 2012-04-20 | Drill / Deepen / Reopen | No Violations | Stopped by drill site to discuss possible plugging of well if company decides to plug well and skid rig and drill new well. |
1336920917 | 2012-05-10 | Drill / Deepen / Reopen | No Violations | On site to witness squeeze job of 9.625 casing shoe Allied Cementing pumped 200 sacks class A on casing shoe and pressured up to 1900 psi and shut in ,operator will drill cement plug up after they let it set up and then retest Formation Integrity Test if it holds they will resume drilling operations. |
1337108598 | 2012-05-15 | Drill / Deepen / Reopen | No Violations | CUTTING LATERAL@6750 ALL GOING WELL. |
1337724572 | 2012-05-22 | Drill / Deepen / Reopen | No Violations | Stopped by site for update they were drilling lateral at 10,670 according to drilling consultant they should be drilled to total depth within the next couple days. |
1339539349 | 2012-06-11 | Completion Testing | No Violations | Stopped by frac job for update they were reforming stage 10 of 20 stage job.
US Well servicesis frac company on site. |
1385818513 | 2011-12-12 | Drill / Deepen / Reopen | No Violations | My inspection revealed that the owner is trying to stop hole from caving in. The decision was made to cement well bore from 5300 to 4800, let the cement set and then drill through it so they can log the hole. They will then run tubing to bottom to plug well back to drill horizontal leg of the hole. |
1391112470 | 2012-01-11 | Drill / Deepen / Reopen | No Violations | Stopped by service rig for update they are still trying to ream to bottom so they can plug well back and then drill horizontal with Patterson rig to be on location within the next couple weeks. |
1527532550 | 2012-04-13 | Drill / Deepen / Reopen | No Violations | Stopped by drill site to check on status of rig they were drilling@9820 drilling lateral section of well bore. |
1558688822 | 2011-12-19 | Drill / Deepen / Reopen | No Violations | Basic Well Service is still trying to condition wellbore so they can run E-Logs on well then we will plug back well to drill horizontal through Utica Shale. |
1611343744 | 2012-03-21 | Drill / Deepen / Reopen | No Violations | On site to witness testing of BOP stack, well was recently sold to Antero and they have contracted Frontier Drilling to drill lateral section of well and wanted to test BOP while waiting on permit to transfer to Antero testing was performed by Greens testing services they tested annular@2500 psi with no decline and both blind and pipe rams @2500 psi also with no decline and we tested entire choke system@2500 psi also with no decline all test passed as of this date. |
1626817896 | 2011-11-25 | Drill / Deepen / Reopen | No Violations | Drill rig attempting to log well but they hit a bridge at @ 4900 and another one at @ 5050. The decision was made to move drilling rig off location and bring in workover rig to condition hole, log well and then plug back to drill horizontal. |
1727344247 | 2012-05-26 | Drill / Deepen / Reopen | No Violations | Total depth was acchieved@13,700 driller is conditioning well bore and then they will lay down drill string and then run 5.5 production casing and cement it in place. |
1766435533 | 2019-8-29 0:00: | PW | No Violations | 0.50 |
1806656373 | 2013-12-09 | Preliminary Restoration | No Violations | The preliminary restoration requirements have been met. |
185007216 | 2011-12-11 0:00 | DD | No Violations | |
1853232123 | 2015-04-02 | Production Wells | No Violations | I am accompanied Inspector David Ball today. Our inspection finds the well appears capable of production with the production valves open. The tank battery is comprised of eight 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds two production units. The production equipment is shared with another well on the pad. The location is monitored by video surveillance. |
1945670044 | 2017-08-02 | Final Restoration | No Violations | The purpose of my inspection was a status check on a final restoration. During my inspection the location of the plugged well had a graveled and level graded surface with no debris left behind. There were 2 producing wells that remain on the pad. The location has met final restoration requirements. |
1983318834 | 2017-08-02 | Production Wells | No Violations | The pad name is Miley Pad and there are two wells on the pad. The purpose of my inspection was a status check on a production well. During my inspection the well was equipped with a production tree style wellhead and a plunger lift system. The production equipment for this well consists of eight 400 barrel tanks within containment, two gas production units, one compressor, and two Cimarron combustors. The production records are current and the identification is located at the wellhead. |
2015093562 | 2014-02-20 | Production Wells | No Violations | My inspection finds the well is equipped with a Christmas tree style well head. The tank battery is comprised of eight 400 bbl tanks located in a secondary containment. The tank battery is shared by another well on the pad. Identification is proper. |
439249982 | 2011-10-11 0:00 | DD | No Violations | |
5406111 | 2012-2-13 0:00: | DD | No Violations | |
761029528 | 2011-9-23 0:00: | DD | No Violations | |
850749687 | 2012-4-5 0:00:0 | DD | No Violations | |
99139071 | 2012-4-9 0:00:0 | DD | No Violations |
For data sources see[7]