X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24389

Well Details

Well ID: 34-121-24389
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000520
Farm/Lease Name: WAYNE UNIT
License Status: Producing
License Date: 2012-11-09
Spud Date: 2012-12-19
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-01-18
Well Total Depth: 14056.00 ft
Configuration: Horizontal
Latitude: 39.860000
Longitude: -81.420000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-11-09 Proposed Formations:POINT PLEASANT-BLACK RIVER, Issued Date:11/9/2012, Expired Date:11/9/2014 12:00:00 PM, Drilling unit acres:510.719, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-01-18
Correction to Well 2013-04-05 UNIT SIZE CHANGED TO 363.40 ACRES. CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2013-06-26
End of Confidential Data 2014-01-18
Construction Permit Expires 2014-11-09
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-07-05 7982 14001 0
7982 14001 0
7982 14001 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/15/2013 03/15/2013 7,572 8,867,880

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LGC-15 U.S. Well Services, LLC Gelling Agents Guar Gum 9000-30-0 50.00 0.00545
Suspending agent (solid) 14808-60-7 3.00 0.06887
Surfactant 68439-51-0 3.00 0.06887
Petroleum Distillates 64742-47-8 60.00 0.06887
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent Deionized Water 7732-18-5 28.00 0.00271
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00475
WFRA-405 U.S. Well Services, LLC Friction Reducer Ethoxylated alcohol blend Proprietary 5.00 0.00257
Petroleum Distillates 64742-47-8 22.00 0.00910
Anionic Polyacrylamide Proprietary Proprietary
Ammonium Chloride 12125-02-9 5.00 0.00257
Water 7732-18-5 40.00 0.02055
SI-1000 U.S. Well Services, LLC Scale Inhibitor Water 7732-18-5 30.00 0.00335
Ethylene Glycol 107-21-1 20.00 0.00402
Anionic Copolymer Proprietary Proprietary
Water Carrier/Base Fluid Water 7732-18-5 100.00 89.82439
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100.00 9.99042
AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitors Water 7732-18-5 20.00 0.00005
Ethylene Glycol 107-21-1 31.00 0.00009
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13.00 0.00003
2-Butoxyethanol 111-76-2 7.00 0.00002
Cinnamaldehyde 104-55-2 5.00 0.00001
Triethyl Phosphate 78-40-0 3.00 0.00001
Ethoxylated Nonylphenol 68412-54-4 5.00 0.00001
N,N-Dimethylformamide 68-12-2 15.00 0.00003
Isopropyl Alcohol 67-63-0 3.00 0.00001
HCL Acid (12.5-18.0) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 1/1/7641 18.00 0.02396
Water 7732-18-5 87.50 0.05761
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100.00 0.00128

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-03-22 H2O 15 8597 Bbl 363310 US Well Services Inc STAGE 22

60 SHOTS

2013-03-17 H2O 15 8695 Bbl 354300 US Well Services Inc STAGE 7

60 SHOTS

2013-03-18 H2O 15 8853 Bbl 357970 US Well Services Inc STAGE 8

60 SHOTS

2013-03-21 H2O 15 8908 Bbl 366360 US Well Services Inc STAGE 18

60 SHOTS

2013-03-19 H2O 15 8701 Bbl 357150 US Well Services Inc STAGE 11

60 SHOTS

2013-03-21 H2O 15 8716 Bbl 361280 US Well Services Inc STAGE 19

60 SHOTS

2013-03-22 H2O 15 8993 Bbl 258930 US Well Services Inc STAGE 20

60 SHOTS

2013-03-18 H2O 15 8880 Bbl 352770 US Well Services Inc STAGE 10

60 SHOTS

2013-03-20 H2O 15 8726 Bbl 360715 US Well Services Inc STAGE 15

60 SHOTS

2013-03-16 H2O 15 9902 Bbl 407320 US Well Services Inc STAGE 4

60 SHOTS

2013-03-18 H2O 15 9094 Bbl 358850 US Well Services Inc STAGE 9

60 SHOTS

2013-03-22 H2O 15 8492 Bbl 350075 US Well Services Inc STAGE 21

60 SHOTS

2013-03-16 H2O 15 9983 Bbl 400310 US Well Services Inc STAGE 3

60 SHOTS

2013-03-19 H2O 15 8553 Bbl 337220 US Well Services Inc STAGE 14

60 SHOTS

2013-03-22 H2O 15 8581 Bbl 360010 US Well Services Inc STAGE 23

60 SHOTS

2013-03-19 H2O 15 9614 Bbl 344970 US Well Services Inc STAGE 12

60 SHOTS

2013-03-15 H2O 15 10962 Bbl 255860 US Well Services Inc STAGE 1

60 SHOTS

2013-03-19 H2O 15 8814 Bbl 361550 US Well Services Inc STAGE 13

60 SHOTS

2013-03-17 H2O 15 9850 Bbl 402690 US Well Services Inc STAGE 6

60 SHOTS

2013-03-20 H2O 15 8731 Bbl 362270 US Well Services Inc STAGE 16

60 SHOTS

2013-03-17 H2O 15 10849 Bbl 38350 US Well Services Inc STAGE 5

60 SHOTS

2013-03-20 H2O 15 8757 Bbl 361480 US Well Services Inc STAGE 17

60 SHOTS

2013-03-16 H2O 15 9919 Bbl 398280 US Well Services Inc STAGE 2

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ANTERO RESOURCES CORPORATION 353157 34684 116
2014 ANTERO RESOURCES CORPORATION 455756 35563 364
2015 ANTERO RESOURCES CORPORATION 203981 9186 365
2016 ANTERO RESOURCES CORPORATION 134188 5358 359
2017 ANTERO RESOURCES CORPORATION 97233 3135 364
2018 ANTERO RESOURCES CORPORATION 84938 2851 364
2019 ANTERO RESOURCES CORPORATION 21744 488 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ANTERO RESOURCES CORPORATION Brine 7580 116
2014 ANTERO RESOURCES CORPORATION Brine 5475 364
2015 ANTERO RESOURCES CORPORATION Brine 2475 365
2016 ANTERO RESOURCES CORPORATION Brine 1280 359
2017 ANTERO RESOURCES CORPORATION Brine 900 364
2018 ANTERO RESOURCES CORPORATION Brine 738 364
2019 ANTERO RESOURCES CORPORATION Brine 142 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1070824337 2018-6-12 0:00: PW No Violations 0.20
-1171272283 2013-1-9 0:00:0 DD No Violations
-166904568 2019-11-27 0:00 PW No Violations 0.50
-1679741406 2017-11-7 0:00: PW No Violations 0.50
-1805377734 2020-7-7 0:00:0 PW No Violations 0.30
-1926730690 2019-9-13 0:00: PW No Violations 0.50
-2020352502 2015-4-2 0:00:0 PW No Violations 0.10
-2130802777 2016-7-13 0:00: PW No Violations 0.50
-640692361 2017-6-7 0:00:0 PW No Violations 0.10
-871483036 2012-12-24 0:00 DD No Violations
0052956355 2014-03-31 Production Wells No Violations My inspection finds the well appears capable of production. Identification is posted in accordance with 1501.9-9-05(A)10. The tank battery is comprised of twenty 400 bbl tanks located in secondary containment. The tanks are shared by four other wells on the site. The road is well maintained.
0587655533 2016-03-21 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production with the production valves open. The tank battery is comprised of eight 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds five production units. The production equipment is shared with four other wells on the pad.
0640692361 2017-06-07 Production Wells No Violations The purpose of my inspection was a status check on a producing well. The pad is named Wayne and there are a total of five wells on this pad. During my inspection the well was equipped with a production tree style wellhead and a plunger lift system with production valves in the open position. Gauges present read 350 pounds per square inch on the casing and 260 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment consists of eight 400 barrel tanks within a lined steel containment, five gas production units within a lined steel containment, one compressor, and two combustors. The pipeline tie in is located on the north side of the pad. The production records are current, the identification is located at the wellhead and gas production unit, and there are no violations present.
0850040339 2014-03-07 Preliminary Restoration No Violations My inspection finds the well site meets the requirements for 1509.072 preliminary restoration. Identification is posted in accordance with 1501.9-9-05(A)10. The tank battery is comprised of twenty 400 bbl tanks located in secondary containment. The road is well maintained.
0871483036 2012-12-24 Drill / Deepen / Reopen No Violations I am on site to witness cementing operations. The operator ran 364 of 18.625 casing and cemented it in place with class A cement. I witnessed good returns to surface.
0967584904 2013-01-03 Drill / Deepen / Reopen No Violations My inspection today finds the drilling rig is at a depth of 4370 and currently drilling at a rate of 35 per hour.
1021124399 2013-01-23 Drill / Deepen / Reopen No Violations My inspection today finds the 5.5 production string cemented in place at a depth of 14060. The pipe was cemented in place with 164 sks of 50/50 poz and 1104 sks of class H cement.
1021840538 2017-01-11 Production Wells No Violations The purpose of my inspection today is a status check on a producing well. There are five wells on this pad; 3412124400, 3412124387, 3412124389, 3412124429, and 3412124427. During my inspection the well was equipped with a production tree style wellhead. The production valves are open. The production equipment consists of five gas processing units, eight 400 barrel tanks within containment, and two flare stacks. The production records are current, identification is located on the wellhead, and there are no violations present.
1070824337 2018-06-12 Production Wells No Violations The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge was present on the production tubing reading 210 pounds per square inch, 330 pounds per square inch on the production casing, 25 pounds per square inch on the 9.625 inch diameter intermediate casing, and 0 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of eight 400 barrel tanks, five gas production units, two combustors, and a Triethylene Glycol Dehydration Unit. The Triethylene Glycol Dehydration Unit had an inlet separator, a Glycol contact tower, a horizontal scrubber, and a reboiler. The identification was located at the wellhead.
1149298272 2013-01-09 Drill / Deepen / Reopen No Violations My inspection today finds the well has been drilled to a depth of 6452. The rig ran 6447 of 9.625 casing. A two stage cement tool was set at 4255.
1171272283 2013-01-09 Drill / Deepen / Reopen No Violations On site to witness cementing of 9.625 casing Allied cementing performed task with 716 sacks on first stage and 1462 sacks on second stage and two stage tool@4254 with 39 centralizers in place and it was noted that cement top was@48 from surface operator will top it off on next cement job.
1356015515 2012-12-20 Drill / Deepen / Reopen No Violations My inspection today finds that on the second attempt to run the conductor string, the operator was able to reach 100. The operator ran 102 of 26 conductor.
1422622374 2015-01-29 Production Wells No Violations My inspection today finds the well is produced with a plunger lift system. The tank battery consists of eight 400 barrel tanks set in a liquid tight containment. The production facilities are shared by four other wells on the pad. No violations were noted.
1679741406 2017-11-07 Production Wells No Violations The purpose of my inspection was a status check on a producing well. The pad is named Wayne and there are a total of five wells on this pad. During my inspection the well was equipped with a production tree style wellhead and a plunger lift system with production valves in the open position. The production equipment consists of eight 400 barrel tanks within a lined steel containment, five gas production units within a lined steel containment, one compressor, and two combustors. The pipeline tie in is located on the north side of the pad. The production records are current and the identification is located at the wellhead.
1806713505 2013-09-03 Production Wells No Violations My inspection today finds the well appears to be producing. There are 20 400 bbl tanks shared by three wells.
1932130031 2013-06-26 Non Well No Violations I was asked by Antero employee Sam Meyers to review the site to see if the vegetation was substantial enough to remove the super silt fence. The site does not meet criteria for removal of the fence.
1950814666 2018-11-01 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.375-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 140 pounds per square inch, the 9.625-inch diameter casing had 40 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 8 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was midstream equipment on the Northern Corner of the pad. There was secondary containment around the production fluid tanks. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. Identification tags were present, and production was up to date.
2020352502 2015-04-02 Production Wells No Violations I am accompanied Inspector David Ball today. Our inspection finds the well appears capable of production with the production valves open. The tank battery is comprised of eight 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds five production units. The production equipment is shared with four other wells on the pad.
2130802777 2016-07-13 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production with the production valves open. The tank battery is comprised of eight 400 barrel tanks set in a liquid tight plastic lined steel containment. A separate containment area holds five production units. The production equipment is shared with four other wells on the pad. The 9.625 casing head is equipped with a 600 psi gauge and reads 90 psi.
52956355 2014-3-31 0:00: PW No Violations 0.30
587655533 2016-3-21 0:00: PW No Violations 0.50
850040339 2014-3-7 0:00:0 PL No Violations 0.40
967584904 2013-1-3 0:00:0 DD No Violations 1.00

For data sources see[10]

References