X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24423

Well Details

Well ID: 34-121-24423
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000730
Farm/Lease Name: VORHIES UNIT
License Status: Producing
License Date: 2013-05-23
Spud Date: 2013-09-23
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-02-03
Well Total Depth: 18481.00 ft
Configuration: Horizontal
Latitude: 39.880000
Longitude: -81.420000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-23 Proposed Formations:POINT PLEASANT, Issued Date:5/23/2013, Expired Date:5/23/2015 12:00:00 PM, Drilling unit acres:732.3, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-02-03
Correction to Well 2014-03-07 CORRECTION TO PROPOSED TOTAL DEPTH, TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-02-12
Construction Permit Expires 2015-05-23
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-02-13 8092 17898 0
8092 17898 0
8092 17898 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/13/2014 05/30/2014 7560 14,596,900.0 675302

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitor Isopropyl Alcohol 67-63-0 3 0.00001000 18.9662
Ethylene Glycol 107-21-1 31 0.0004 548.605
Triethyl Phosphate 78-40-0 3 0.00002000 23.8816
2-Butoxyethanol 111-76-2 7 0.0001 129.622
N,N-Dimethylformamide 68-12-2 15 0.00013 169.569
Water 7732-18-5 20 0.00004000 50.3528
Ethoxylated Nonylphenol 68412-54-4 5 0.00003000 39.8027
Cinnamaldehyde 104-55-2 5 0.00011 148.756
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0.00011 146.742
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.83016 13,326,800.0
SI-1000 U.S. Well Services, LLC Scale Inhibitor Water 7732-18-5 30 0.00341 4616.68
Ethylene Glycol 107-21-1 20 0.00408 5536.14
Anionic Copolymer Proprietary 0 0.00452 6124.6
Water Antero Resources Base Fluid Water 7732-18-5 100 89.7975 121,738,000.0
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7641-01-1 18 0.03693 50065
Water 7732-18-5 87.5 0.1546 209593
WFRA-405 U.S. Well Services, LLC Friction Reducer Crystalline Salt 12125-02-9 5 0.00338 4577.83
Ethoxylated alcohol blend Proprietary 5 0.00338 4577.83
Petroleum Distillates 64742-47-8 22 0.02175 29481.2
Anionic Polyacrylamide Proprietary 0 0.02701 36622.6
Water 7732-18-5 40 0.02701 36622.6
LGC-15 U.S. Well Services, LLC Gelling Agents Petroleum Distillates 64742-47-8 60 0.03302 44761.6
Surfactant 68439-51-0 3 0.00209 2835.83
Guar Gum 9000-30-0 50 0.03486 47263.8
Suspending agent (solid) 14808-60-7 3 0.00533 7228.58
K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00554 7510.15
Deionized Water 7732-18-5 28 0.00316 4289.76
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00136 1840

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-30 H2O 15 5908 Bbl 247440 US Well Services Inc STAGE 56/56

60 SHOTS

2014-04-13 H2O 15 7347 Bbl 233900 US Well Services Inc STAGE 1/56

60 SHOTS STAGES 2-55 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 824488 52632 164
2015 ANTERO RESOURCES CORPORATION 1020839 40432 365
2016 ANTERO RESOURCES CORPORATION 539868 14679 359
2017 ANTERO RESOURCES CORPORATION 390086 9136 365
2018 ANTERO RESOURCES CORPORATION 271215 5380 358
2019 ANTERO RESOURCES CORPORATION 60169 786 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 9234 164
2015 ANTERO RESOURCES CORPORATION Brine 6728 365
2016 ANTERO RESOURCES CORPORATION Brine 2595 359
2017 ANTERO RESOURCES CORPORATION Brine 1838 365
2018 ANTERO RESOURCES CORPORATION Brine 2140 358
2019 ANTERO RESOURCES CORPORATION Brine 251 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1157932356 2014-11-5 0:00: PL No Violations 1.00
-1473677442 2013-9-27 0:00: CS No Violations 3.00
-1712140707 2013-10-3 0:00: DD No Violations 2.00
-192634511 2014-1-27 0:00: DD No Violations 1.00
-506968124 2018-11-26 0:00 PW No Violations 1.00
0192634511 2014-01-27 Drill / Deepen / Reopen No Violations My inspection today finds the rig is drilling 8.5 hole at a depth of 17287.
0506968124 2018-11-26 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 0 pounds per square inch, the 9.625-inch diameter casing had 0 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 8- 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. There was a midstream valve site near located to the south of the pad. Identification tags were present, and production was up to date.
0685864706 2016-05-18 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production. The production valves are open. The tank battery consists of eight 400 barrel tanks set in a plastic lined steel containment system. Antero personnel Zac Cornish and Josh Horn are on location. I am accompanied by a number of division staff.
1012498975 2013-09-30 Drill / Deepen / Reopen No Violations My inspection today finds the rig is drilling 17.5 hole at 1503.
1141956922 2019-8-20 0:00: PW No Violations 0.80
1157932356 2014-11-05 Preliminary Restoration No Violations My inspection today finds the well is equipped with tubing and is produced by open flow through a choke. The tank battery is comprised of eight 400 barrel tanks located in a steel framed and plastic lined containment. The well site meets preliminary restoration requirements.
1380040473 2013-09-24 Production Wells No Violations My inspection today finds Express Drilling drilled a 32 inch hole to a depth of 111. 26 casing was ran to 109. Allied cemented the casing in place with 336 sks of class A cement. I witnessed 10 bbl of cement returns to surface. Twenty bbl of cement is still in the casing due to the job being stopped because of rising pressures.
1473677442 2013-09-27 Casing String Witnessed No Violations My inspection today finds the rig crew ran 335 of casing. Allied cemented the casing in place with class A cement. I witnessed 80 bbl cement returns to surface.
1489154345 2017-03-10 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of three gas production units, eight 400 barrel tanks, two compressors, and two combustors. Identification was present and production records were current.
1514416990 2017-12-27 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks within steel line containment, three gas production units, one vapor recovery tower, two compressors, one vent scrubber, and two combustors. The identification was located at the wellhead.
1603993802 2020-10-29 0:00 PW No Violations 0.40
1712140707 2013-10-03 Drill / Deepen / Reopen No Violations My inspection today finds the 13.625 casing is parted at 286. The drilling superintendent is attempting to locate a casing patch. Once the patch is in place they will grout the backside of the casing.
685864706 2016-5-18 0:00: PW No Violations

For data sources see[10]

References