X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24424

Well Details

Well ID: 34-121-24424
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000730
Farm/Lease Name: VORHIES UNIT
License Status: Producing
License Date: 2013-05-23
Spud Date: 2013-10-03
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-02-19
Well Total Depth: 16813.00 ft
Configuration: Horizontal
Latitude: 39.880000
Longitude: -81.420000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-23 Proposed Formations:POINT PLEASANT, Issued Date:5/23/2013, Expired Date:5/23/2015 12:00:00 PM, Drilling unit acres:732.3, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-02-19
Correction to Well 2014-03-07 CORRECTION TO PROPOSED TOTAL DEPTH, TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Correction to Well 2014-06-13 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-02-12
Construction Permit Expires 2015-05-23
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-02-13 7678 16690 0
7678 16690 0
7678 16690 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/17/2014 04/29/2014 7570 12,754,400.0 584311

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00143 1686
AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitor Triethyl Phosphate 78-40-0 3 0.00002000 21.3896
Water 7732-18-5 20 0.00004000 45.0986
2-Butoxyethanol 111-76-2 7 0.0001 116.097
N,N-Dimethylformamide 68-12-2 15 0.00013 151.875
Cinnamaldehyde 104-55-2 5 0.00011 133.234
Ethylene Glycol 107-21-1 31 0.00042 491.359
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0.00011 131.43
Ethoxylated Nonylphenol 68412-54-4 5 0.00003000 35.6493
Isopropyl Alcohol 67-63-0 3 0.00001000 16.9871
Water Antero Resources Base Fluid Water 7732-18-5 100 89.936 106,372,000.0
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.66295 11,428,800.0
K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00514 6075.17
Deionized Water 7732-18-5 28 0.00293 3470.11
SI-1000 U.S. Well Services, LLC Scale Inhibitor Anionic Copolymer Proprietary 0 0.00385 4549.25
Water 7732-18-5 30 0.0029 3429.19
Ethylene Glycol 107-21-1 20 0.00348 4112.15
WFRA-405 U.S. Well Services, LLC Friction Reducer Ethoxylated alcohol blend Proprietary 5 0.00394 4659.98
Crystalline Salt 12125-02-9 5 0.00394 4659.98
Water 7732-18-5 40 0.03152 37279.8
Anionic Polyacrylamide Proprietary 0 0.03152 37279.8
Petroleum Distillates 64742-47-8 22 0.02537 30010.2
LGC-15 U.S. Well Services, LLC Gelling Agents Petroleum Distillates 64742-47-8 60 0.03835 45361.8
Guar Gum 9000-30-0 50 0.0405 47897.5
Suspending agent (solid) 14808-60-7 3 0.00619 7325.51
Surfactant 68439-51-0 3 0.00243 2873.85
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.5 0.15872 187723
Hydrogen Chloride 7641-01-1 18 0.03791 44840.8

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-04-30 H2O 15 5561 Bbl 233240 US Well Services Inc STAGE 52/52

60 SHOTS

2014-04-17 H2O 15 6560 Bbl 238840 US Well Services Inc STAGE 1/52

60 SHOTS STAGES 2-51 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 770516 41534 165
2015 ANTERO RESOURCES CORPORATION 847995 30418 365
2016 ANTERO RESOURCES CORPORATION 453640 12027 359
2017 ANTERO RESOURCES CORPORATION 321893 6862 365
2018 ANTERO RESOURCES CORPORATION 210344 5030 359
2019 ANTERO RESOURCES CORPORATION 47576 1642 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 9030 165
2015 ANTERO RESOURCES CORPORATION Brine 5584 365
2016 ANTERO RESOURCES CORPORATION Brine 2182 359
2017 ANTERO RESOURCES CORPORATION Brine 1423 365
2018 ANTERO RESOURCES CORPORATION Brine 2025 359
2019 ANTERO RESOURCES CORPORATION Brine 663 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1029440970 2017-3-10 0:00: PW No Violations 0.50
-1047619650 2014-2-10 0:00: DD No Violations 0.50
-130286915 2019-8-20 0:00: PW No Violations 0.80
-150096037 2016-5-18 0:00: PW No Violations 1.00
-1636691065 2017-12-27 0:00 PW No Violations 0.20
-1873647808 2014-2-18 0:00: CS No Violations 2.00
-780886141 2020-10-29 0:00 PW No Violations 0.40
0150096037 2016-05-18 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production. The production valves are open. The tank battery consists of eight 400 barrel tanks set in a plastic lined steel containment system. Antero personnel Zac Cornish and Josh Horn are on location. I am accompanied by a number of division staff.
1029440970 2017-03-10 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of three gas production units, eight 400 barrel tanks, two compressors, and two combustors. Identification was present and production records were current.
1047619650 2014-02-10 Drill / Deepen / Reopen No Violations The rig is tripping in the hole to finish drilling the 8.5 section. The current depth is 11998.
1100381575 2014-11-05 Preliminary Restoration No Violations My inspection today finds the well is equipped with tubing and is produced by open flow through a choke. The tank battery is comprised of eight 400 barrel tanks located in a steel framed and plastic lined containment. The well site meets preliminary restoration requirements.
1636691065 2017-12-27 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks within steel line containment, three gas production units, one vapor recovery tower, two compressors, one vent scrubber, and two combustors. The identification was located at the wellhead.
1873647808 2014-02-18 Casing String Witnessed No Violations My inspection finds the company ran 16809 of 5.5 P-110 casing. The casing was installed with 83 casing centralizers. Allied Oil and Gas Services cemented the casing in place with 1667 sks of type H cement.
1946356655 2018-11-26 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 240 pounds per square inch, the 9.625-inch diameter casing had 720 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 8- 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. There was a midstream valve site near located to the south of the pad. Identification tags were present, and production was up to date.

For data sources see[10]

References