X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24511

Well Details

Well ID: 34-121-24511
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001040
Farm/Lease Name: HALLETT UNIT
License Status: Producing
License Date: 2014-06-26
Spud Date: 2014-07-13
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-12-01
Well Total Depth: 14227.00 ft
Configuration: Horizontal
Latitude: 39.900000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-26 Proposed Formations:POINT PLEASANT, Issued Date:6/26/2014, Expired Date:6/25/2016 12:00:00 PM, Drilling unit acres:455.899, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-12-01
Correction to Well 2015-02-06 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED.
Completion Report Received 2016-02-22
Construction Permit Expires 2016-06-25
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-05-29 8155 14134 0
8155 14134 0
8155 14134 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/19/2015 03/27/2015 7927 8,852,860.0 406783

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LGC-15 U.S. Well Services Gelling Agents Suspending agent (solid) 14808-60-7 3 0.00781 6401.12
Petroleum Distillates 64742-47-8 60 0.04836 39637.7
Surfactant 68439-51-0 3 0.00306 2511.21
Guar Gum 9000-30-0 50 0.05106 41853.5
SI-1100 U.S. Well Services Scale Inhibitor bis (hexamethylene) tramine penta

(methylene phosphonic acid) - phosphate acid

40623-75-4 10 0.00145 1186.41
Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 10 0.0017 1392.74
Copolymer of Maleic and Acrylic acid 26677-99-6 10 0.00149 1217.36
Acrylic polymer 52255-49-9 5 0.00063 515.829
hexamethylenediamine tetra (methylene phosphonic acid) 38820-59-6 10 0.00157 1289.57
Ethylene Glycol 107-21-1 40 0.00569 4663.09
2-Phosphonobutane 1,2,4 tricarboxylic salt 37971-36-1 10 0.00162 1330.84
Di Water 7732-18-5 80 0.01007 8253.26
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.38889 7,695,730.0
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 18 0.0648 53112.5
Water 7732-18-5 87.5 0.25348 207771
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.00242 1980.25
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00423 3466.85
WFRA-405 U.S. Well Services Friction Reducer Ethoxylated alcohol blend Proprietary 5 0.00298 2445.29
Sodium Chloride 7647-14-5 20 0.01193 9781.15
Anionic Polyacrylamide Proprietary 40 0.02387 19562.3
Water 7732-18-5 40 0.02387 19562.3
Petroleum Distillates 64742-47-8 20 0.00961 7873.83
Water Antero Resources Base Fluid Water 7732-18-5 100 90.0771 73,832,900.0
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00181 1480
AI-301 U.S. Well Services Acid Corrosion Inhibitors Hydrogen Chloride 7647-01-0 10 0.00007000 59.0138
Methenamine 100-97-0 20 0.00017 135.325
Diethylene Glycol 111-46-6 30 0.00021 170.784
Coco amine 61791-14-8 5 0.00003000 23.402
Polyethylene polyamine 68603-67-8 10 0.00006000 51.2301

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-03-24 H2O 0 5969 Bbl 238650 US Well Services Inc Annular pressure remained at 120 psi throughout the job.

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 973021 22606 184
2016 ANTERO RESOURCES CORPORATION 932835 5990 359
2017 ANTERO RESOURCES CORPORATION 343304 2919 338
2018 ANTERO RESOURCES CORPORATION 295392 1042 362
2019 ANTERO RESOURCES CORPORATION 65567 263 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 11030 184
2016 ANTERO RESOURCES CORPORATION Brine 6568 359
2017 ANTERO RESOURCES CORPORATION Brine 7288 338
2018 ANTERO RESOURCES CORPORATION Brine 2369 362
2019 ANTERO RESOURCES CORPORATION Brine 465 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-475320879 2015-10-20 0:00 PW No Violations
-652742883 2019-11-29 0:00 PW No Violations 0.50
0475320879 2015-10-20 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery is comprised of twelve 400 barrel tanks set in a liquid tight steel dike with a spray on liner.
1209936066 2018-11-27 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 0 pounds per square inch, the 9.625-inch diameter casing had 0 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 12- 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. There was a midstream valve site on the northwest side of the pad. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. Identification tags were present, and production was up to date.
1411738729 2014-09-26 Casing String Witnessed No Violations I am onsite to witness the surface casing cementing operations. Patterson rig 316 ran 376 of 18.625 casing. Allied Oil and Gas Services circulated 779 sacks of class A cement into the annular space of the casing with forty barrels of returning to surface. The casing integrity test performed upon landing the plug with less than ten percent of the pressure being lost.
1906664606 2015-07-29 Preliminary Restoration No Violations My inspection today finds the well meets the preliminary restoration requirements of 1509.072(A). The proper identification is posted at the wellhead. Solid Oak is providing initial turn on production services. The tank battery is comprised of twelve 400 barrel tanks set in a liquid tight steel dike with a spray on liner.
2026737429 2017-10-17 Production Wells No Violations The purpose of my inspection was a status check on a production well. The pad name is JR Byler and it consists of 7 wells. The well was equipped with a production tree style wellhead. Production valves were in the open position. Gauges present on the annulus read 0 pounds per square inch. The gauge on the production casing read 350 pounds per square inch and the gauge on the production tubing read 170 pounds per square inch. The production equipment consisted of twelve 400 barrel tanks within steel line containment and seven gas production units. A vapor recovery system to capture tank vapors consisted of one compressor and two combustors. The pipeline tie in was located on the North side of the pad. Pipeline contractors were in the process of launching a pig during inspection. A dust suppressant had been recently applied to the lease road. The identification was located at the wellhead and the production records were current.
2109610356 2017-03-15 Production Wells No Violations The pad name is JR Byler and it consists of 7 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 1600 pounds per square inch on the casing and 1500 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment consisted of seven gas production units, twelve 400 barrel tanks, three compressors, and two combustors. Identification was present and production records were current.

For data sources see[10]

References