If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24531 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.81,"lon":-81.32,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Marion Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000901 | |
Farm/Lease Name: DAILEY UNIT | |
License Status: Producing | |
License Date: 2014-09-19 | |
Spud Date: 2014-09-20 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-12-16 | |
Well Total Depth: 18235.00 ft | |
Configuration: Horizontal | |
Latitude: 39.810000 | |
Longitude: -81.320000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-05 | Proposed Formations:POINT PLEASANT, Issued Date:9/5/2014, Expired Date:9/4/2016 12:00:00 PM, Drilling unit acres:317.721, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-09-19 | Proposed Formations:POINT PLEASANT, Issued Date:9/19/2014, Expired Date:9/18/2016 12:00:00 PM, Drilling unit acres:317.721, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-12-16 | |
Correction to Well | 2015-02-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-10-28 | |
Construction Permit Expires | 2016-09-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-10-29 | 8621 | 18140 | 0 |
8621 | 18140 | 0 | |
8621 | 18140 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/25/2015 | 06/05/2015 | 8346 | 14,105,400.0 | 656614 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00161 | 2100 |
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00247 | 3231.92 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00433 | 5658.16 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.07093 | 92729.1 | |
Water | 7732-18-5 | 87.5 | 0.29696 | 388203 | ||||
WFRA-405 | U.S. Well Services | Friction Reducer | Anionic Polyacrylamide | Proprietary | 40 | 0.02664 | 34827.8 | |
Ethoxylated alcohol blend | Proprietary | 5 | 0.00333 | 4353.48 | ||||
Sodium Chloride | 7647-14-5 | 20 | 0.01332 | 17413.9 | ||||
Petroleum Distillates | 64742-47-8 | 20 | 0.01072 | 14018.2 | ||||
Water | 7732-18-5 | 40 | 0.02664 | 34827.8 | ||||
SI-1100 | U.S. Well Services | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.00579 | 7565.75 | |
Acrylic polymer | 52255-49-9 | 5 | 0.00064 | 836.919 | ||||
2-Phosphonobutane 1,2,4 tricarboxylic salt | 37971-36-1 | 10 | 0.00165 | 2159.25 | ||||
Copolymer of Maleic and Acrylic acid | 26677-99-6 | 10 | 0.00151 | 1975.13 | ||||
bis (hexamethylene) tramine penta
(methylene phosphonic acid) - phosphate acid |
40623-75-4 | 10 | 0.00147 | 1924.91 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 10 | 0.00173 | 2259.68 | ||||
Di Water | 7732-18-5 | 80 | 0.01024 | 13390.7 | ||||
hexamethylenediamine tetra (methylene phosphonic acid) | 38820-59-6 | 10 | 0.0016 | 2092.3 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.44981 | 12,353,500.0 | |
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 89.9875 | 117,639,000.0 | |
LGC-15 | U.S. Well Services | Gelling Agents | Guar Gum | 9000-30-0 | 50 | 0.03729 | 48744 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.0057 | 7454.96 | ||||
Surfactant | 68439-51-0 | 3 | 0.00224 | 2924.64 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.03531 | 46163.4 | ||||
AI-301 | U.S. Well Services | Acid Corrosion Inhibitors | Coco amine | 61791-14-8 | 5 | 0.00003000 | 41.0495 | |
Methenamine | 100-97-0 | 20 | 0.00018 | 237.373 | ||||
Polyethylene polyamine | 68603-67-8 | 10 | 0.00007000 | 89.8627 | ||||
Diethylene Glycol | 111-46-6 | 30 | 0.00023 | 299.572 | ||||
Hydrogen Chloride | 7647-01-0 | 10 | 0.00008000 | 103.516 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-05-25 | H2O | 0 | 6210 Bbl | 237081 | US Well Services Inc | STAGE 1/54
60 SHOTS STAGES 2-53 SEE IMAGES |
2015-06-05 | H2O | 0 | 5577 Bbl | 236090 | US Well Services Inc | STAGE 54/54
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 1146362 | 14164 | 184 |
2016 | ANTERO RESOURCES CORPORATION | 2320088 | 7057 | 366 |
2017 | ANTERO RESOURCES CORPORATION | 1000980 | 749 | 364 |
2018 | ANTERO RESOURCES CORPORATION | 635371 | 576 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 138671 | 106 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 21648 | 184 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 18740 | 366 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 6915 | 364 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 5557 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 1773 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-170331025 | 2017-8-10 0:00: | PW | No Violations | 0.20 |
-260538245 | 2015-12-7 0:00: | PW | No Violations | 0.10 |
-266865715 | 2019-8-13 0:00: | PW | No Violations | 0.50 |
-444092372 | 2016-6-17 0:00: | PW | No Violations | 0.50 |
-894483057 | 2014-10-14 0:00 | DD | No Violations | 1.50 |
0069192441 | 2014-09-20 | Casing String Witnessed | No Violations | Express Energy on site to drill and set conductor casing they drilled a 36 hole to 100 and ran 100 of casing and cemented it in place with 330 sacks of Class A cement with good returns and it stayed up good in the cellar. |
0170331025 | 2017-08-10 | Production Wells | No Violations | The purpose of my inspection today was a status check on a production well. The pad was named Warner and it consisted of 7 wells. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production casing had a gauge present reading460 pounds per square inch and the production tubing had a gauge present reading 207 pounds per square inch. The production equipment consisted of tin 400 barrel tanks, 7 gas production units, and 2 combustors. The natural gas pipeline tie in was located on the Northwest side of the pad. The identification was located on the wellhead. |
0260538245 | 2015-12-07 | Production Wells | No Violations | My inspection today finds the well is back in production. The site is staffed by a Warrior employee 24 hours a day. |
0444092372 | 2016-06-17 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery consists of twelve 400 barrel tanks set inside of a plastic lined steel containment system. Additionally, there are seven production units (GPUs) also set inside of a plastic lined steel containment system. Three Cimarron combustors and two compressors make up the vapor recovery system. A Meyers Well Service truck is on location hauling brine at the time of inspection. |
0825561765 | 2015-07-30 | Preliminary Restoration | No Violations | My inspection today finds the well site meets the preliminary restoration requirements of 1509.072(A). Well Service Group is onsite removing matting boards. The well has not been connected to production pipelines. The lease road has recently been treated with a dust suppression product. |
0862950283 | 2017-11-20 | Production Wells | No Violations | The purpose of my inspection today was a status check on a production well. The pad was named Warner and it consisted of 7 wells. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of ten 400 barrel tanks, 7 gas production units, one vent scrubber, and 2 combustors. The natural gas pipeline tie in was located on the Northwest side of the pad. The identification was located on the wellhead and production records were current. |
0894483057 | 2014-10-14 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is preparing to run 9.625 casing to a depth of 7200. |
0902208074 | 2018-02-02 | Production Wells | No Violations | Status check following a nearby pipeline mechanical issue that is not owned by Antero. The purpose of my inspection today was a status check on a production well. The pad was named Warner and it consisted of 7 wells. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of ten 400 barrel tanks, 7 gas production units, one vent scrubber, and 2 combustors. The natural gas pipeline tie in was located on the Northwest side of the pad with no issues present. The identification was located on the wellhead and production records were current. |
1103825060 | 2017-01-18 | Production Wells | No Violations | The purpose of my inspection is a status check on a producing well. The pad name is Warner and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of ten 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present. |
1526886179 | 2014-10-02 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing cementing operations. Patterson Drilling rig 343 drilled 510 of 24 hole. The rig then ran 502 of 18.625 casing. Allied Oil and Gas Services cemented the casing in place with 984 barrels of class A cement. I witnessed good cement returns to surface. |
69192441 | 2014-9-20 0:00: | CS | No Violations | 3.00 |
825561765 | 2015-7-30 0:00: | PL | No Violations | |
862950283 | 2017-11-20 0:00 | PW | No Violations | 0.50 |
902208074 | 2018-2-2 0:00:0 | PW | No Violations | 0.50 |
For data sources see[10]