X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24533

Well Details

Well ID: 34-121-24533
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000813
Farm/Lease Name: SIBERIAN UNIT
License Status: Producing
License Date: 2015-02-17
Spud Date: 2015-01-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-07-03
Well Total Depth: 17991.00 ft
Configuration: Horizontal
Latitude: 39.820000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-09-05 Proposed Formations:POINT PLEASANT, Issued Date:9/5/2014, Expired Date:9/4/2016 12:00:00 PM, Drilling unit acres:702.181, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2015-02-17 Proposed Formations:POINT PLEASANT, Issued Date:2/17/2015, Expired Date:2/16/2017 12:00:00 PM, Drilling unit acres:702.181, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-07-03
Correction to Well 2015-08-28 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-01-15
Construction Permit Expires 2017-02-16
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-01-15 8435 17900 0
8435 17900 0
8435 17900 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/15/2015 09/28/2015 8322 14,151,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 18 0.04318 56595.2
Water 7732-18-5 87.5 0.18078 236932
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.49349 12,442,500.0
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00203 2662
LGC-15 U.S. Well Services Gelling Agents Petroleum Distillates 64742-47-8 60 0.04704 61651.9
Suspending agent (solid) 14808-60-7 3 0.0076 9956.21
Guar Gum 9000-30-0 50 0.04967 65098.3
Surfactant 68439-51-0 3 0.00298 3905.9
WFRA-405 U.S. Well Services Friction Reducer Petroleum Distillates 64742-47-8 20 0.01274 16702.3
Anionic Polyacrylamide Proprietary 40 0.03166 41496.5
Ethoxylated alcohol blend Proprietary 5 0.00396 5187.06
Sodium Chloride 7647-14-5 20 0.01583 20748.3
Water 7732-18-5 40 0.03166 41496.5
AI-301 U.S. Well Services Acid Corrosion Inhibitors Methenamine 100-97-0 20 0.00011 144.199
Polyethylene polyamine 68603-67-8 10 0.00004000 54.5895
Diethylene Glycol 111-46-6 30 0.00014 181.983
Hydrogen Chloride 7647-01-0 10 0.00005000 62.8836
Coco amine 61791-14-8 5 0.00002000 24.9366
Water Antero Resources Base Fluid Water 7732-18-5 100 90.0512 118,024,000.0
K-BAC 1020 U.S. Well Services Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.00257 3367.36
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.0045 5895.28
SI-1100 U.S. Well Services Scale Inhibitor Copolymer of Maleic and Acrylic acid 52255-49-9 10 0.00152 1987.92
Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 7.5 0.0013 1705.74
Hexamethylene tramine penta (methylene phosphonic acid) 34690-00-1 5 0.00084 1095.04
Ethylene Glycol 107-21-1 25 0.00363 4759.22
Phosphino carboxylic acid polymer 71050-62-9 5 0.00084 1095.04
Water 7732-18-5 80 0.01028 13477.4
Hexamethylene diamine penta (methylene phosphonic acid) 23605-74-5 2 0.00033 438.017

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-09-28 H2O 15 5605 Bbl 234150 US Well Services Inc STAGE 54/54
2015-09-15 H2O 15 6365 Bbl 227290 US Well Services Inc STAGE 1/54

STAGES 2-53 SEEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 148524 400 61
2016 ANTERO RESOURCES CORPORATION 2809477 1488 366
2017 ANTERO RESOURCES CORPORATION 1096552 214 364
2018 ANTERO RESOURCES CORPORATION 704789 303 365
2019 ANTERO RESOURCES CORPORATION 141646 137 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 2887 61
2016 ANTERO RESOURCES CORPORATION Brine 28055 366
2017 ANTERO RESOURCES CORPORATION Brine 8530 364
2018 ANTERO RESOURCES CORPORATION Brine 6784 365
2019 ANTERO RESOURCES CORPORATION Brine 1493 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1058738294 2015-12-28 0:00 PW No Violations 0.10
-1084852999 2015-12-16 0:00 PW No Violations 0.50
-1601083759 2016-6-17 0:00: PW No Violations 0.30
-1624116215 2019-1-31 0:00: PW No Violations 0.50
-170478121 2019-12-9 0:00: PW No Violations 0.50
-981925582 2018-2-2 0:00:0 PW No Violations 0.50
0196616819 2018-03-13 Production Wells No Violations The purpose of my inspection was a status check. The pad is named Wilson and it consists of 8 wells. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of eight gas production units, eight 400 barrel tanks, two vapor recovery towers, and two combustors. The pipeline tie in was located on the West side of the pad. The identification was located at the wellhead and the production records were current.
0220627042 2019-01-31 Production Wells No Violations On site inspection along with ODNR Inspector Ryan Armstrong. On this day we were conducting field training and visited the well pad. The pad consists of 8 producing wells. The tank battery sits on the left side of the pad as you enter it and consists of (8) 400 barrel tanks. Identification is present on each well head. See Ryans reports for more information.
0981925582 2018-02-02 Production Wells No Violations Status check following a nearby pipeline mechanical issue that is not owned by Antero. This pad is named Wilson and it consists of 8 wells. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of eight gas production units, eight 400 barrel tanks, and two combustors. Identification was present and production records were current. The pipeline tie in was located on the West side of the pad with no issues present. The identification was located at the wellhead and the production records were current.
1043310469 2017-03-17 Production Wells No Violations The pad is named Wilson and it consists of 8 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight gas production units, eight 400 barrel tanks, and two combustors. Identification was present and production records were current. Antero Resources was on location preforming maintenance on a gas production unit.
1058738294 2015-12-28 Production Wells No Violations My inspection today finds the well is in production. The well is still being produced into temporary tanks while work on the North slope of the pad is on going.
1084852999 2015-12-16 Production Wells No Violations My inspection today finds the well has been placed into production. All work on the South side of the out slope has been finished. Three temporary tanks have been placed on the location, in containment, to allow the wells to be produced while a small slip is repaired behind the permeant tank battery. All temporary equipment meets the spacing requirements of section 1501 9-9-05 of the OAC.
1339329637 2015-10-22 Preliminary Restoration No Violations The well site meets the preliminary restoration requirements of 1509.072(A). A Fortis service rig is drilling out the frac plugs at the time of inspection. They are currently on plug number 51 of 54.
1421760710 2015-01-20 Drill / Deepen / Reopen No Violations My inspection today finds the conductor has been cemented in place. I can see cement at surface.
1511498241 2017-10-24 Production Wells No Violations The purpose of my inspection was a status check on a production well. The pad is named Wilson and it consists of 8 wells. The well was equipped with a production tree style wellhead. Production valves were in the open position. A gauge present on the production casing read 450 pounds per square inch and the gauge on the production tubing read 189 pounds per square inch. Annular pressure monitoring was present. The production equipment consisted of eight gas production units, eight 400 barrel tanks, and two combustors. Identification was present and production records were current. The pipeline tie in was located on the West side of the pad. The identification was located at the wellhead and the production records were current.
1601083759 2016-06-17 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery consists of eight 400 barrel tanks set inside of a plastic lined steel containment system. On the opposite side of the pad there are eight production units, also set in containment.
1624116215 2019-01-31 Production Wells No Violations On the day of my inspection accompanied by ODNR inspector Bill Stolarik I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing that appeared to be open flowing. At the time of my inspection annular pressure monitoring was in place on the 9.625-inch diameter deep intermediate casing, and 13.375-inch diameter intermediate casing. Production equipment included a Gas Processing Unit, as well as 8- 400-barrel steel production fluid storage tanks, and a combustor that was shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. There was a midstream valve site on the west side of the pad. As well as a water impoundment to the south, right side of the lease road as you enter the pad. Identification tags were present, and production was up to date.
1655682686 2016-05-10 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery consists of eight 400 barrel tanks set inside of a plastic lined steel containment system. On the opposite side of the pad there are eight production units, also set in containment. Several pieces of construction equipment are parked on the location and are being used for the reclamation of the adjacent fresh water impoundment.
196616819 2018-3-13 0:00: PW No Violations 0.20
2090954113 2015-04-23 Drill / Deepen / Reopen No Violations My inspection today finds the drilling rig, Patterson Drilling 343, is drilling a 12.25 hole at a depth of 4530. Well Service Group is downsizing the containment around the drilling rig.
220627042 2019-1-31 0:00: PW No Violations 0.10

For data sources see[10]

References