X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24537

Well Details

Well ID: 34-121-24537
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001048
Farm/Lease Name: WALSH EAST UNIT
License Status: Producing
License Date: 2016-12-02
Spud Date: 2014-10-01
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-02-11
Well Total Depth: 18829.00 ft
Configuration: Horizontal
Latitude: 39.860000
Longitude: -81.370000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-09-24 Proposed Formations:POINT PLEASANT, Issued Date:9/24/2014, Expired Date:9/23/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-08-31 Proposed Formations:POINT PLEASANT, Issued Date:8/31/2016, Expired Date:8/31/2018 12:00:00 PM, Drilling unit acres:620.667, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2016-12-02 Proposed Formations:POINT PLEASANT, Issued Date:12/2/2016, Expired Date:12/2/2017 12:00:00 PM, Drilling unit acres:240.98, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2016-12-16 CORRECTION TO WELL NUMBER
Reached Total Depth 2017-02-11
Correction to Well 2017-04-21 UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 3-28-17-ALE
Construction Permit Expires 2017-12-02
Completion Report Received 2018-01-29
Record Last Modified 2018-02-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-08 7939 8107 48
2018-02-08 18543 18711 48
18543 18711 48
7939 8107 48
7939 8107 48

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/05/2017 12/06/2017 7988 17,867,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 86.9672 149,017,000.0
LGC-15 U.S. Well Services, LLC Gelling Agents Suspending agent (solid) 14808-60-7 3 0.007047 12075.6
Guar Gum 9000-30-0 50 0.046079 78955.9
Surfactant 68439-51-0 3 0.002765 4737.35
Petroleum Distillates 64742-47-8 60 0.043639 74775.8
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.032359 55446.4
Water 7732-18-5 87.4 0.139179 238481
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.001939 3322
WFRA-405 U.S. Well Services, LLC Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.020496 35120
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.025461 43627.4
SI-1200s U.S. Well Services, LLC Scale Inhibitor Proprietary Scale Inhibitor Proprietary 10 0.001239 2123.2
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 12.7063 21,772,100.0
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.003944 6757.91
Deionized Water 7732-18-5 28 0.002253 3860.09
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Ethylene glycol 107-21-1 40 0.00005000 85.8686
Cinnamaldehyde 104-55-2 20 0.00001800 31.0448
Butyl cellosolve 111-76-2 20 0.00001600 27.0516
Polyether 60828-78-6 10 0.00000900 15.012
Formic acid 64-18-6 20 0.00001800 30.024
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000400 7.506

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-12-06 H2O 15 7128 Bbl 406560 US Well Services Inc STAGE 54/54

STAGES 2-53 SEE IMAGES

2017-09-05 H2O 15 8068 Bbl 402660 US Well Services Inc STAGE 1/54

STAGES 2-53 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 2717967 54847 344
2019 ANTERO RESOURCES CORPORATION 380913 2116 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 64270 344
2019 ANTERO RESOURCES CORPORATION Brine 2784 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1264139100 2017-3-23 0:00: PL No Violations 0.50
-1628786605 2015-10-23 0:00 PL No Violations 0.50
-1996031192 2014-10-2 0:00: CS No Violations 2.00
-2087559844 2014-10-1 0:00: CS No Violations 3.00
-278433302 2018-1-9 0:00:0 CT No Violations 0.50
-990639390 2017-6-6 0:00:0 CT No Violations 0.50
0003826702 2017-01-08 Casing String Witnessed No Violations On the day of my inspection I witnessed that Patterson UTI Rig #342 had drilled a 24 inch diameter hole to the depth of 360 feet. Wyoming Casing Crew ran 365 feet of 18.625 inch 87.5 pound per foot J-
0278433302 2018-01-09 Completion Testing No Violations The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection Fortis Energy Services was on location with their service rig drilling out frac plugs on the Iles 2H, 3412124540. This well was equipped with a production tree style wellhead with valves in the closed position. Frac plugs have recently been drilled out and the well is prepared to be flowed back. The production equipment consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors.
0990639390 2017-06-06 Completion Testing No Violations The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a Frac valve. The production equipment on the pad consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. Containment was present on the pad with sound walls surrounding the pad as Antero prepares the location for Hydraulic Fracturing operations on the 5 of wells.
1028203869 2018-03-28 Production Wells No Violations At 3:28 p.m. on 3/27/18 Antero Resources Production Supervisor Doug Stubbins called and reported some electrical issues that they were having with their combustor. Mr. Stubbins stated that the electric cable on the combustor burnt up and caused small flame that was extinguished immediately. The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure monitoring was present on all casing strings. The production equipment consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. Identification was present and production records were current. Antero well tender was on location.
1264139100 2017-03-23 Preliminary Restoration No Violations The pad is named Bond and it consists of 8 wells. The purpose of my inspection was a preliminary restoration. During my inspection Antero was on location with contractors present to nipple up the wellhead and get it tied into production lines. The area affected by the well pad construction has all been restored. There are no slips or erosion issues on location. The production equipment on the pad consisted of eight gas production units, fifteen 400 barrel tanks, two compressors, and two combustors. Location has met 1509.072 A requirements.
1486996483 2017-02-13 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Patterson UTI Rig #342 had reached total depth on their lateral with an 8.75 inch diameter hole to the depth of 18,829 feet. Wyoming Casing Crew was onsite and running 5.5 inch diameter 23 pound per foot production casing currently at 15160 feet with cementing to follow. I completed walk around with Antero Consultant Josh Scharf revealing proper containment was in place and simultaneous operation were taking place with 4 wells producing on the pad.
1506695608 2017-09-28 Completion Testing No Violations The purpose of my inspection was to investigate complaint number 5709. The route taken to enter the pad consisted of taking State Route 147 to Mud Run road and then on to the lease road. Roadways were free from debris. During my inspection Hydraulic Stimulation Operations were staged to take place. US Well Services, Allied Horizontal Wireline, and Antero were all on location. Allied Horizontal Wireline were rigged up to the Walsh 1H permit number 3412124538 to perforate stage 8 of 55 and US Well Services was rigged up to the Iles 1H permit number 3412124539 to prepare and Hydraulically Stimulate stage 21 of 54. No sirens were heard from the pad and there were not any issues on location.
1628786605 2015-10-23 Preliminary Restoration No Violations The well site meets the preliminary restoration requirements of 1509.072(A).
1874210230 2019-8-13 0:00: PW No Violations 0.50
1996031192 2014-10-02 Casing String Witnessed No Violations I am onsite to witness the conductor cementing operations in a USDW unmapped area. The drilling contractor Express Energy Services drilled 100 of 32 hole and ran100 of 26 weld casing. Allied Oil and Gas Services cemented the casing in place with class A cement. I witnessed good cement returns to surface.
2087559844 2014-10-01 Casing String Witnessed No Violations I am onsite to witness the conductor casing run and cementing operations. Express Energy Services drilled 100 of 32 hole and ran 100 of 26 casing. The cement truck malfunctioned and the cement job was postponed.
3826702 2017-1-8 0:00:0 CS No Violations 11.00
418688909 2019-9-18 0:00: PW No Violations 0.80

For data sources see[10]

References