If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24549 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-81.37,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001048 | |
Farm/Lease Name: HALL UNIT | |
License Status: Producing | |
License Date: 2015-06-30 | |
Spud Date: 2014-11-10 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-09-27 | |
Well Total Depth: 19708.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -81.370000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-10-16 | Proposed Formations:POINT PLEASANT, Issued Date:10/16/2014, Expired Date:10/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-06-30 | Proposed Formations:POINT PLEASANT, Issued Date:6/30/2015, Expired Date:6/29/2017 12:00:00 PM, Drilling unit acres:594.733, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-09-27 | |
Completion Report Received | 2016-02-01 | |
Construction Permit Expires | 2017-06-29 | |
Record Last Modified | 2018-01-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-02-04 | 8077 | 3960 | 0 |
8077 | 3960 | 0 | |
8077 | 3960 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/26/2015 | 11/28/2015 | 7854 | 17,643,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SI-1100 | U.S. Well Services | Scale Inhibitor | Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 7.5 | 0.00125 | 2027.46 |
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.0008 | 1301.58 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.0008 | 1301.58 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00146 | 2362.87 | ||||
Water | 7732-18-5 | 80 | 0.00986 | 16019.5 | ||||
Ethylene Glycol | 107-21-1 | 25 | 0.00348 | 5656.88 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00032 | 520.633 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 8.81822 | 14,320,100.0 | |
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00209 | 3394 | |
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.6101 | 147,143,000.0 | |
WFRA-405 | U.S. Well Services | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02145 | 34835.3 | |
Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00286 | 4644.71 | ||||
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.01727 | 28042.5 | ||||
Water | 7732-18-5 | 60 | 0.0429 | 69670.7 | ||||
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | Water | 7732-18-5 | 95 | 0.00051 | 831.915 | |
2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00008000 | 131.355 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.23569 | 382736 | |
Hydrogen Chloride | 7647-01-0 | 18 | 0.0563 | 91423.1 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Guar Gum | 9000-30-0 | 50 | 0.07784 | 126398 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.0119 | 19331.5 | ||||
Surfactant | 68439-51-0 | 3 | 0.00467 | 7583.9 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.07371 | 119707 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00407 | 6606.64 | |
Deionized Water | 7732-18-5 | 28 | 0.00232 | 3773.68 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-11-28 | H2O | 15 | 5833 Bbl | 249520 | US Well Services Inc | STAGE 66/66
60 SHOTS |
2015-10-26 | H2O | 15 | 6196 Bbl | 299380 | US Well Services Inc | STAGE 1/66 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 88202 | 5512 | 31 |
2016 | ANTERO RESOURCES CORPORATION | 2301614 | 108851 | 359 |
2017 | ANTERO RESOURCES CORPORATION | 726753 | 15169 | 281 |
2018 | ANTERO RESOURCES CORPORATION | 679641 | 13144 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 126885 | 2129 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 4224 | 31 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 19291 | 359 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 4860 | 281 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 9230 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 2868 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1385353615 | 2019-9-18 0:00: | PW | No Violations | 1.00 |
-1827553897 | 2015-9-3 0:00:0 | CS | No Violations | |
-1893778583 | 2017-6-6 0:00:0 | PW | No Violations | 0.50 |
-2113553905 | 2018-3-28 0:00: | PW | No Violations | 0.20 |
-496592615 | 2015-12-7 0:00: | CT | No Violations | 1.00 |
-515054442 | 2018-1-9 0:00:0 | PW | No Violations | 0.10 |
-859412611 | 2015-9-11 0:00: | DD | No Violations | 1.00 |
0341533484 | 2016-01-04 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery is comprised of eight 400 barrel tanks set inside of a plastic line steel containment. There are three other wells in production on the pad. The lease road is well maintained. |
0462900439 | 2015-10-23 | Preliminary Restoration | No Violations | The well site meets the preliminary restoration requirements of 1509.072(A). |
0496592615 | 2015-12-07 | Completion Testing | No Violations | A Fortis service rig is running production tubing. After landing the tubing the rig will move to the Hall 2H and drill out the frac plugs. |
0515054442 | 2018-01-09 | Production Wells | No Violations | The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection Fortis Energy Services was on location with their service rig drilling out frac plugs on the Iles 2H, 3412124540. This well was equipped with a production tree style wellhead with valves in the closed position and a protective cage surrounding the wellhead. The production equipment consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. Identification was present and production records were current. |
0651208360 | 2016-05-02 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery is comprised of eight 400 barrel tanks set inside of a plastic lined steel containment. There are three other wells in production on the pad. The lease road is well maintained. |
0859412611 | 2015-09-11 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig is pulling the drill pipe in order to replace the dill pipe. A 12.25 borehole has been drilled to a depth of 5340. |
1700400956 | 2014-11-10 | Casing String Witnessed | No Violations | I am onsite to witness the conductor cementing operations. Express Energy Services drilled 100 of 32 hole then installed 100 of 26 welded casing. Express also cemented the casing in place by circulating 330 sacks of class A cement into the annular space with 12 barrels of cement circulating to surface. |
1782762297 | 2017-03-23 | Production Wells | No Violations | The pad is named Bond and it consists of 8 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight gas production units, fifteen 400 barrel tanks, two compressors, and two combustors. Identification was present and production records were current. Antero was on location working on getting the 4 new wells put in production. |
181490978 | 2019-8-13 0:00: | PW | No Violations | 0.50 |
1827553897 | 2015-09-03 | Casing String Witnessed | No Violations | My inspection today finds the drilling contractor, Patterson 340, has drilled a 24 borehole to a depth of 576. The rig ran 576 of 18.625 casing. CalFrac cemented the casing in place with 174 barrels of class A cement. I witnessed 39 barrels of cement circulate back to surface. |
1893778583 | 2017-06-06 | Production Wells | No Violations | The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position and a protective cage surrounding the wellhead. Casing pressure valve reads 420 pounds per square inch and tubing pressure gauge reads 250 pounds per square inch. Annular pressure monitoring was present. The production equipment consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. Containment was present on the pad with sound walls surrounding the pad as Antero prepares the location for Hydraulic Fracturing operations on the 5 of wells. Identification was present and production records were current. |
2113553905 | 2018-03-28 | Production Wells | No Violations | At 3:28 p.m. on 3/27/18 Antero Resources Production Supervisor Doug Stubbins called and reported some electrical issues that they were having with their combustor. Mr. Stubbins stated that the electric cable on the combustor burnt up and caused small flame that was extinguished immediately. The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure monitoring was present on all casing strings. The production equipment consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. Identification was present and production records were current. Antero well tender was on location. |
341533484 | 2016-1-4 0:00:0 | PW | No Violations | 1.00 |
462900439 | 2015-10-23 0:00 | PL | No Violations | 0.50 |
651208360 | 2016-5-2 0:00:0 | PW | No Violations | 0.50 |
For data sources see[10]