If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24584 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.87,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001276 | |
Farm/Lease Name: NOTCHTOP UNIT | |
License Status: Producing | |
License Date: 2017-08-29 | |
Spud Date: 2017-09-15 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-01-14 | |
Well Total Depth: 16718.00 ft | |
Configuration: Horizontal | |
Latitude: 39.870000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-08-29 | Proposed Formations:POINT PLEASANT, Issued Date:8/29/2017, Expired Date:8/29/2019 12:00:00 PM, Drilling unit acres:271.639, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-01-14 | OP REQUEST 1 YEAR CONF ALL LOGS |
Completion Report Received | 2018-10-04 | OP REQUEST 1 YEAR CONF ALL LOGS |
Record Last Modified | 2018-10-20 | OP REQUEST 1 YEAR CONF ALL LOGS |
Construction Permit Expires | 2019-08-29 | OP REQUEST 1 YEAR CONF ALL LOGS |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-19 | 8237 | 8408 | 0 |
2018-10-19 | 16562 | 16616 | 0 |
16562 | 16616 | 0 | |
8237 | 8408 | 0 | |
8237 | 8408 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/16/2018 | 03/31/2018 | 7914 | 12,688,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001671 | 2062 |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.8961 | 17,148,700.0 | |
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.150468 | 185688 | |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.034984 | 43172 | ||||
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.004661 | 5752.19 | |
Deionized Water | 7732-18-5 | 28 | 0.002662 | 3285.63 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Guar Gum | 9000-30-0 | 50 | 0.048615 | 59994.2 | |
Surfactant | 68439-51-0 | 3 | 0.002917 | 3599.65 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.046041 | 56818 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.007435 | 9175.58 | ||||
SI-1200 | U.S. Well Services, LLC | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 10 | 0.001876 | 2314.7 | |
Ethylene Glycol | 107-21-1 | 40 | 0.007012 | 8653.65 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Ethylene glycol | 107-21-1 | 40 | 0.00005000 | 61.1099 | |
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 5.34177 | ||||
Polyether | 60828-78-6 | 10 | 0.00000900 | 10.6835 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001600 | 19.2517 | ||||
Formic acid | 64-18-6 | 20 | 0.00001700 | 21.3671 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001800 | 22.0936 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.023537 | 29045.7 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.018947 | 23381.8 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.7529 | 105,825,000.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-03-16 | H2O | 15 | 4539 Bbl | 152300 | US Well Services Inc | STAGE 1/42
STAGES 2-41 SEE IMAGES |
2018-03-31 | H2O | 15 | 6458 Bbl | 413300 | US Well Services Inc | STAGE 42/42
STAGES 2-41 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 1177143 | 31568 | 184 |
2019 | ANTERO RESOURCES CORPORATION | 492443 | 7999 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 27657 | 184 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 7520 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2053375536 | 2020-2-10 0:00: | PW | No Violations | 0.50 |
-841895117 | 2019-8-20 0:00: | PW | No Violations | 0.50 |
-893092522 | 2018-2-22 0:00: | PL | No Violations | 0.20 |
0067263392 | 2017-12-05 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness the cementing of the 13.375 inch diameter intermediate casing. The casing was set to a depth of 1770 feet within the 17.5 inch diameter borehole. Schlumberger was on location to cement the casing string. During my inspection the H&P Drilling Rig 519 could not circulate through the floats within the casing. The rig worked the casing up and down while attempting to pump through the casing and they were unsuccessful. The floats on the casing were plugged up. Antero company man on location decided to trip the casing out of the hole and lay it down for examination to figure out what plugged up the floats. I obtained a copy of the casing tally. |
0893092522 | 2018-02-22 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection 6 wells had been drilled to total depth and are awaiting completion. The drilling rig has moved off of location. The area affected by pad construction had been remediated. Location has met 1509.072 (A) requirements. |
0986756211 | 2017-12-11 | Drill / Deepen / Reopen | No Violations | |
1668696563 | 2017-09-25 | Drill / Deepen / Reopen | No Violations | My inspection today found a 100 foot deep 26 inch diameter conductor cemented into a 32 inch diameter borehole. Containment was laid on the pad and sound barriers surrounded the pad. HP Drilling Rig 519 is scheduled to arrive on the pad in October. |
1912955629 | 2018-09-18 | Production Wells | No Violations | The Troyer Pad has 6 wells. The well was equipped with a production tree style wellhead. The wells on the pad were in the process of flowing back through Enercorp Sand solutions. The production equipment consisted of six indirect line heaters, six sand traps, six gas production units, a gas buster, fourteen 400-barrel tanks, three vapor recovery towers, and four combustors. Teksolv was on location monitoring gas metering stations and Antero well tenders were monitoring flowback. |
67263392 | 2017-12-5 0:00: | CS | No Violations | 3.00 |
986756211 | 2017-12-11 0:00 | DD | No Violations | 2.00 |
For data sources see[10]