34-121-24601

Well Details

Well ID: 34-121-24601
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001402
Farm/Lease Name: WEHR UNIT
License Status: Producing
License Date: 2016-10-03
Spud Date: 2016-09-08
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2017-01-09
Well Total Depth: 16905.00 ft
Configuration: Horizontal
Latitude: 39.890000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-12-18 Proposed Formations:POINT PLEASANT, Issued Date:12/18/2015, Expired Date:12/17/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-10-03 Proposed Formations:POINT PLEASANT, Issued Date:10/3/2016, Expired Date:10/3/2018 12:00:00 PM, Drilling unit acres:475.503, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-01-09
Correction to Well 2017-03-03 UPDATE ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 2-13-17-ALE
Completion Report Received 2017-07-20
Record Last Modified 2018-02-27
Construction Permit Expires 2018-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-03 11464 11632 36
2017-08-03 16643 16811 36
16643 16811 36
11464 11632 36
11464 11632 36

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/01/2017 04/17/2017 8187 9,970,960.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.000851 825
SI-1200s U.S. Well Services, LLC Scale Inhibitor Alkyl Phosphonic Acid Proprietary 5 0.000623 604.65
Ammonia 7664-41-7 0.5 0.00009500 92.5114
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000400 4.17
Formic acid 64-18-6 20 0.00001700 16.68
Polyether 60828-78-6 10 0.00000900 8.34
Cinnamaldehyde 104-55-2 20 0.00001800 17.2471
Butyl cellosolve 111-76-2 20 0.00001500 15.0287
Ethylene glycol 107-21-1 40 0.00004900 47.7048
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.004029 3908.38
Deionized Water 7732-18-5 28 0.002302 2232.45
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 85.7345 83,157,800.0
WFRA-500 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.017812 17276.3
Hydrated light distillate (petroleum) 64742-47-8 30 0.014338 13907.4
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.029673 28781.3
Water 7732-18-5 87.4 0.127628 123792
LGC-15 U.S. Well Services, LLC Gelling Agents Petroleum Distillates 64742-47-8 60 0.019544 18956.8
Guar Gum 9000-30-0 50 0.020637 20016.5
Surfactant 68439-51-0 3 0.001238 1200.99
Suspending agent (solid) 14808-60-7 3 0.003156 3061.35
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 14.0235 13,602,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-04-17 H2O 8 9574 Bbl 503290 US Well Services Inc STAGE 27/27

STAGES 2-26 SEE IMAGES

2017-04-01 H2O 7 9000 Bbl 505180 US Well Services Inc STAGE 1/27

STAGES 2-26 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION 991672 11301 184
2018 ANTERO RESOURCES CORPORATION 1027611 2262 363
2019 ANTERO RESOURCES CORPORATION 147606 217 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION Brine 17909 184
2018 ANTERO RESOURCES CORPORATION Brine 13456 363
2019 ANTERO RESOURCES CORPORATION Brine 2390 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1504943869 2017-4-17 0:00: CT No Violations 1.00
-1662598534 2018-9-18 0:00: PW No Violations 0.20
-1793182776 2017-7-11 0:00: CT No Violations 0.50
-268346457 2017-3-6 0:00:0 PL No Violations 0.50
-327277029 2017-4-11 0:00: CT No Violations 2.00
-421769425 2017-6-3 0:00:0 CT No Violations 0.50
-463743502 2017-8-31 0:00: PW No Violations 0.20
-930658266 2018-1-4 0:00:0 PW No Violations 0.50
0268346457 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Halliburton crews are on site preparing to begin the well stimulation 5.5 diameter production casing toe preparations.
0296998331 2016-12-29 Drill / Deepen / Reopen No Violations On the day of my inspection Frontier Drilling Rig #32 had completed the walk to the well from the 34121246120000 Wehr 2H and were nippling up the blow out preventer with Ricon Services onsite to complete testing. I met with Antero Drilling Consultant Brandon Jeffcoat and Drilling Superintendent Joe Canady and completed walk around.
0327277029 2017-04-11 Completion Testing No Violations The purpose of my inspection today is a status check on a hydraulic fracturing operations. During my inspection Antero Company men, Allied wireline, and US Well Service were on location. I witnessed US Well Service rigging up to preform hydraulic fracturing on the 18th stage. Pad inspection found no violations present.
0421769425 2017-06-03 Completion Testing No Violations On site status check inspection found 27 out of a total 42 stages have been stimulated on the well pad with all operations being stopped on 04/21/2017.
0463743502 2017-08-31 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery and one Antero Company man was on location.
0703744947 2017-06-03 Completion Testing No Violations Status check inspection found the well stimulation process was started on 03/28/2017 and stopped on 04/21/2017 with 27 of 42 stages complete.
0930658266 2018-01-04 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Three Antero workers were maintenance production equipment and Myers Trucking were hauling produced fluids from the tank battery.
1278440578 2019-12-24 0:00 PW No Violations 0.50
1365887764 2017-06-19 Completion Testing No Violations Status check inspection on the well completion process found a service rig on location and rigged up on the well owned by Fortis Energy Services. Also on location is QES Pressure Control (AKA Great White) providing snubbing unit services. The well head assembly consists of a Cameron sub base and (B) Section main lower well head assembly. Sitting atop the lower section is a (BOP) blow out prevention consist owned by Bass Energy consisting of a manual master valve-
1473345763 2016-09-08 Casing String Witnessed No Violations I arrived on location to witness Express Energy Services set conductor casing on the Wehr 1H. Prior to my arrival Inspector Conrad had approved them to set the conductor to 80 feet. We set the conductor using 257 sacks of class A cement with 2% NaCl and about a half a pound of flake. The weight of the cement was 15.6 pounds and had a 1.18 yield with a 32.19 mix. We used a total of 43.35 barrels of fluid for displacement. When we finished setting the casing we had a 10 foot shoe. We lost about 15 barrels of cement on the surface. After we had finished setting the conductor we had about 15 barrels of cement come back to surface and no water.
1475661521 2016-10-05 Casing String Witnessed No Violations 10/05/2016- Frontier Drilling rig # 32 is now on the hole and has drilled a 17.5 surface borehole to 1,089 and ran 1,071 of 13.375 54.5 lb/ft J-55 casing with a guide shoe and float collar casing equipment ran. C&J Cement service cemented the casing using 1009 sacks of class A-2% calcium .25 lb/sk lcm with circulation established prior to cementing and 25 barrels of 6% gel spacer ran ahead of the cement, upon the landing of the cement plug the casing was pressure tested to 500 psi over displacement pressure with good cement returns witnessed to surface inside the cellar.
1476200416 2016-10-11 Drill / Deepen / Reopen No Violations
1483714309 2017-01-06 Drill / Deepen / Reopen No Violations On the day of my inspection Frontier Drilling Rig #32 was drilling their lateral with an 8.75 inch diameter bit at 16172 feet on 11.6 pound per gallon (ppg) mud simulating 13.6 ppg. Frontier Drilling Rig #32 is planning on drilling to projected total depth of 16812 feet. I completed walk around with Antero Consultant Steve Guffey revealing proper containment was in place.
1498153866 2017-06-22 Completion Testing No Violations Status check inspection on the well completion process found a service rig on the hole owned by Fortis Energy. The rig has completed the completion clean out run and drilled out all the completion plugs to the well bore total depth inside the 5.5 diameter production casing. The rig is pulling the drill string keeping the well bore loaded with fluid and static while pulling the string to avoid any well bore gas migration. Upon recovering the 2.875 diameter workover string the production string will be inserted into the well bore.
1504943869 2017-04-17 Completion Testing No Violations US Well Services, Allied Horizontal Wireline, and Antero Company men were all on location. During my inspection accompanied by ODNR Regional Manager Brent Bear we verified that the zipper hydraulic fracturing operations were temporarily put on hold due to slightly high magnitude readings detected at 12:00 PM 4/17/17. Operations were put on hold following setting wireline perforations operations on stage 28. Top perforations for that stage were at 11265 feet, bottom perforations were at 11433 feet, and the frac plug was placed at 11448 feet. A plan will be worked out for continuing operations between ODNR Seismic section and Antero Resources Completions Manager.
1662598534 2018-09-18 Production Wells No Violations The Wehr pad has a total of 7 wells, 6 production wells, and 1 well that has not been completed. The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of twelve 400-barrel tanks, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Myers Trucking was hauling produced fluids from the tank battery.
1670188967 2017-10-11 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery during inspection.
1793182776 2017-07-11 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection the well was shut in and equipped with a production tree style wellhead. Multiple contractors are on location installing production lines, fittings, and valves to the wellhead.
2101646914 2020-10-19 0:00 PW No Violations 0.20
296998331 2016-12-29 0:00 DD No Violations 1.50
703744947 2017-6-3 0:00:0 CT No Violations 0.20

For data sources see[10]