X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24615

Well Details

Well ID: 34-121-24615
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Wayne Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001429
Farm/Lease Name: QUINN UNIT
License Status: Producing
License Date: 2017-04-03
Spud Date: 2017-04-20
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-07-01
Well Total Depth: 17582.00 ft
Configuration: Horizontal
Latitude: 39.910000
Longitude: -81.370000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-01-17 Proposed Formations:POINT PLEASANT, Issued Date:1/17/2017, Expired Date:1/17/2019 12:00:00 PM, Drilling unit acres:996.253, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-04-03 Proposed Formations:POINT PLEASANT, Issued Date:4/3/2017, Expired Date:4/3/2019 12:00:00 PM, Drilling unit acres:973.346, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-07-01 OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE
Correction to Well 2017-10-20 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-06-14 OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE
Record Last Modified 2018-06-21 OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE
Construction Permit Expires 2019-04-03 OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-06-20 7901 8071 5
2018-06-20 17377 17480 5
17377 17480 5
7901 8071 5
7901 8071 5

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/14/2017 12/29/2017 7658 14,793,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.4 0.142509 203892
Hydrogen Chloride 7647-01-0 17.5 0.033133 47404.6
SI-1200 U.S. Well Services, LLC Scale Inhibitor Proprietary Scale Inhibitor Proprietary 10 0.001796 2569.9
Ethylene Glycol 107-21-1 40 0.006715 9607.75
LGC-15 U.S. Well Services, LLC Gelling Agents Surfactant 68439-51-0 3 0.002951 4222.09
Petroleum Distillates 64742-47-8 60 0.04658 66642.9
Guar Gum 9000-30-0 50 0.049183 70368.2
Suspending agent (solid) 14808-60-7 3 0.007522 10762.2
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.001841 2634
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 13.4253 19,208,100.0
WFRA-405 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.022522 32223.3
Hydrated light distillate (petroleum) 64742-47-8 30 0.01813 25939.7
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.004118 5891.19
Deionized Water 7732-18-5 28 0.002352 3365.02
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 86.2352 123,379,000.0
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000400 5.838
Polyether 60828-78-6 10 0.00000800 11.676
Butyl cellosolve 111-76-2 20 0.00001500 21.0402
Cinnamaldehyde 104-55-2 20 0.00001700 24.146
Ethylene glycol 107-21-1 40 0.00004700 66.7867
Formic acid 64-18-6 20 0.00001600 23.352

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-12-29 H2O 15 6892 Bbl 40074 US Well Services Inc STAGE 48/48

STAGES 2-47 SEE IMAGES

2017-12-14 H2O 15 4289 Bbl 249684 US Well Services Inc STAGE 1/48

STAGES 2-47 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 1597266 105507 245
2019 ANTERO RESOURCES CORPORATION 411497 13860 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 29306 245
2019 ANTERO RESOURCES CORPORATION Brine 7786 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1685528767 2019-9-13 0:00: PW No Violations 0.50
-791380576 2020-3-12 0:00: PW No Violations 1.00
-822636970 2020-3-12 0:00: PW No Violations 0.50
1497775009 2017-06-18 Drill / Deepen / Reopen No Violations On site inspection at 4:00 am on 06/18/2017 to witness the surface casing cement job with H&P Drilling rig 519 and Schlumberger Cement Service. The rig has drilled a 24 diameter surface borehole to a measured depth of 403 off of a rig Kelly bushing height of 30. The rig has inserted 18.625 diameter casing into the well bore to a measured depth of 391 with a casing guide shoe and float collar ran along with 5 casing centralizers. The casing was ran to bottom dry. Schlumberger Cement Service cemented the casing by first pumping 220 barrels of fresh water to establish circulation followed by 30 barrels of 6% fresh water gel spacer proceeded by a 130 barrel cement mix consisting of 610 sacks of class A cement mix. The cement slurry weight was confirmed by weight of scale. The cement was displaced with 106 barrels of fresh water with cement returns witnessed to surface at 75 barrels into displacement and the casing pressure tested to 850 psi upon the landing of the cement plug. The casing floats held.
1497878235 2017-06-19 Drill / Deepen / Reopen No Violations
1508499004 2017-10-19 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. The pad is named Andes and it consists of 5 wells. During my inspection the lease road was paved with an asphalt surface and the well pad had a gravel surface surrounded by a berm. There were not any erosion issues within the wellsite boundary. Contactors were on location setting up the production equipment. Location has met Preliminary Restoration Requirements listed within 1509.072 (A).
1513261710 2017-12-11 Completion Testing No Violations The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection I witnessed US Well Services setting up on location. The well was equipped with a frac stack and goat head flange style wellhead. I received an email from the Antero stating that they will be finishing rigging up this week.
1522011974 2018-03-25 Completion Testing No Violations Status check inspection on the well completion process found the well drilling -stimulation and completion process is now complete. A service rig is on location owned by Fortis Energy and is working on the Quinn 2-H well. The said well has 2.375 N-80 production tubing set to a depth of 7,825. The well was stimulated between the depths of 17,357 and 7900. Falcon Flow back service company is on location and is monitoring the annular pressure on the said well every 2 hours while completion operations are being conducted on all 5 wells that are present on the well pad. The said well has no reported annular pressure.
1631550396 2017-04-20 Casing String Witnessed No Violations The purpose of my inspection was to witness 100 feet of the 26 inch diameter conductor being cemented in a 30 inch diameter hole that is 100 feet in depth. Express Energy Services drilled the conductor with a rotary rig and auger bit. No water was encountered during the drilling process. During my inspection Express Energy Services was on location to complete the cement operations. Job calculations were discussed with Express and Antero Company Man. A pre job safety meeting was held with all personnel on location. I witnessed Express pump fresh water and gel ahead of 330 sacks of class A cement with 2% gel, displaced with 55.74 barrels of fresh water, and cement returns were established. The cellar floor was cemented making the depth of the cellar 6 feet.
1697566943 2018-05-23 Production Wells No Violations Status check inspection found a total of 5 wells on the well pad. Each well has had the drilling and completion process complete and is in the initial production stages. The wells are being produced through choke manifolds and sand traps with a 3rd party flow back contractor on site monitoring the initial production process. All well bore annulis were monitored through the completion stages and the wells do have flow lines valves and monitoring points on the 13.375 and 9.625 well head sections. There is a total of 5 glycol heaters on site. Also present on the East side of the well pad is a production fluid tank farm consisting of a total of 14 steel tanks of 400 barrels fluid capacity each, the tanks are situated inside a polymer lined steel containment dike area with the well ad perimeter berm serving as the primary containment with the perimeter drain valves closed. Multiple tank trucks were on site hauling both production fluid and water.
742530085 2020-2-14 0:00: PW No Violations 0.50

For data sources see[10]

References