34-121-24616

Well Details

Well ID: 34-121-24616
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Wayne Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001429
Farm/Lease Name: QUINN UNIT
License Status: Producing
License Date: 2017-04-03
Spud Date: 2017-04-19
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-07-19
Well Total Depth: 25122.00 ft
Configuration: Horizontal
Latitude: 39.910000
Longitude: -81.370000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-01-17 Proposed Formations:POINT PLEASANT, Issued Date:1/17/2017, Expired Date:1/17/2019 12:00:00 PM, Drilling unit acres:996.253, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-04-03 Proposed Formations:POINT PLEASANT, Issued Date:4/3/2017, Expired Date:4/3/2019 12:00:00 PM, Drilling unit acres:973.346, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-07-19
Correction to Well 2017-10-20 UPDATE TEARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-06-14
Record Last Modified 2018-06-21
Construction Permit Expires 2019-04-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-06-20 7764 7849 5
2018-06-20 24929 25025 5
24929 25025 5
7764 7849 5
7764 7849 5

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-12-23 H2O 15 6412 Bbl 251322 US Well Services Inc STAGE 1/86

STAGES 2-85 SEE IMAGES

2018-01-31 H2O 15 6501 Bbl 408713 US Well Services Inc STAGE 86/86

STAGES 2-87 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 2441941 118272 245
2019 ANTERO RESOURCES CORPORATION 922829 18929 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 34042 245
2019 ANTERO RESOURCES CORPORATION Brine 10573 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1596068105 2017-12-11 0:00 CT No Violations 0.50
-162192320 2019-9-13 0:00: PW No Violations 0.50
-1672721037 2018-1-2 0:00:0 CT No Violations 5.00
-432548575 2020-3-12 0:00: PW No Violations 1.00
1133744975 2018-03-25 Completion Testing No Violations Status check inspection found the well has been drilled and stimulated with a Fortis Energy service rig and QVS Company tubing snubbing unit set up on the well drilling out the completion plugs on stage 59 out of 86 total stages completed. The well bore was perforated and stimulated between the depths of 7,764 and 24909. The company is maintaining well control over the 2,800 psi to 3,000 psi using managed pressure completion with 9.7 pound per gallon bring water. The well head is a Cameron Well Head with a (BOP) Blow Out Preventer stack on the well head owned by Fortis Energy, the last BOP test date was 03/22/2018. Falcon Flow Back Service is providing flow back and annular pressure monitoring with all annular pressures checked every 2 hours and (0) Zero annular pressure reported on all the well head annulis. This is the 2nd of 5 wells on the pad to be completed. The 2.375 N-80 production tubing will be set at 7,568.
1234143613 2017-04-20 Casing String Witnessed No Violations The purpose of my inspection was to witness 100 feet of the 26 inch diameter conductor being cemented in a 30 inch diameter hole that is 100 feet in depth. Express Energy Services drilled the conductor with a rotary rig and auger bit. No water was encountered during the drilling process. During my inspection Express Energy Services was on location to complete the cement operations. Job calculations were discussed with Express and Antero Company Man. A pre job safety meeting was held with all personnel on location. I witnessed Express pump fresh water and gel ahead of 330 sacks of class A cement with 2% gel, displaced with 55.74 barrels of fresh water, and cement returns were established. The cellar floor was cemented making the depth of the cellar 6 feet.
1321597069 2017-10-19 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. The pad is named Andes and it consists of 5 wells. During my inspection the lease road was paved with an asphalt surface and the well pad had a gravel surface surrounded by a berm. There were not any erosion issues within the wellsite boundary. Contactors were on location setting up the production equipment. Location has met Preliminary Restoration Requirements listed within 1509.072 (A).
1494076694 2018-05-23 Production Wells No Violations Status check inspection found a total of 5 wells on the well pad. Each well has had the drilling and completion process complete and is in the initial production stages. The wells are being produced through choke manifolds and sand traps with a 3rd party flow back contractor on site monitoring the initial production process. All well bore annulis were monitored through the completion stages and the wells do have flow lines valves and monitoring points on the 13.375 and 9.625 well head sections. There is a total of 5 glycol heaters on site. Also present on the East side of the well pad is a production fluid tank farm consisting of a total of 14 steel tanks of 400 barrels fluid capacity each, the tanks are situated inside a polymer lined steel containment dike area with the well ad perimeter berm serving as the primary containment with the perimeter drain valves closed. Multiple tank trucks were on site hauling both production fluid and water.
1499784753 2017-07-11 Drill / Deepen / Reopen No Violations The purpose of my inspection today was a status check on drilling operations. During my inspection HP Drilling Rig 519 was drilling the 8.5 inch diameter borehole at 8013 feet at 82 degrees within the curved section of the wellbore. The rig was utilizing an 11.2 pound per gallon mud weight while drilling with a balanced hydrostatic pressure method.
1596068105 2017-12-11 Completion Testing No Violations The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection I witnessed US Well Services setting up on location. The well was equipped with a frac stack and goat head flange style wellhead. I received an email from the Antero stating that they will be finishing rigging up this week.
1625311689 2020-3-12 0:00: PW No Violations 0.50
1672721037 2018-01-02 Completion Testing No Violations The purpose of my inspection today was to witness hydraulic stimulation operations. During my inspection I witnessed United States Well Services stimulate stage 11 with a breakdown pressure of 6636 pounds per square inch, an average treating pressure of 9199 pounds per square inch, an average rate of 68 barrels per minute, and a total of 407991 pounds of sand proppant pumped.
1970747975 2017-06-11 Casing String Witnessed No Violations The purpose of my inspection was to witness 1548 feet of the 13.375 inch diameter intermediate casing being cemented within a 17.5 inch diameter borehole that is 1548 feet in depth. During my inspection I witnessed the last joint of casing being landed, Wyoming Casing Crew rigging down, and Schlumberger Cementing rigging up. A pre-job safety meeting was held with all personnel on location. Schlumberger pumped 30 barrels of gel, 10 barrels of fresh water, and 252 barrels of cement. The cement was Class A cement weighing 15.6 pounds per gallon. I witnessed Schlumberger pull a cement sample and weigh it using pressurized scales to confirm the weight of 15.6 pounds per gallon. The plug was dropped and 233 barrels of fresh water was used for displacement. An estimated 78 barrels of cement returns were witnessed in the half rounds and floats were check to confirm that they have held.
538748724 2020-2-14 0:00: PW No Violations 0.50

For data sources see[9]