X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24618

Well Details

Well ID: 34-121-24618
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Wayne Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001429
Farm/Lease Name: QUINN UNIT
License Status: Producing
License Date: 2017-04-03
Spud Date: 2017-04-19
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-08-01
Well Total Depth: 25058.00 ft
Configuration: Horizontal
Latitude: 39.910000
Longitude: -81.370000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-01-17 Proposed Formations:POINT PLEASANT, Issued Date:1/17/2017, Expired Date:1/17/2019 12:00:00 PM, Drilling unit acres:996.253, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2017-04-03 Proposed Formations:POINT PLEASANT, Issued Date:4/3/2017, Expired Date:4/3/2019 12:00:00 PM, Drilling unit acres:973.346, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-08-01
Completion Report Received 2018-06-14
Record Last Modified 2018-06-21
Construction Permit Expires 2019-04-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-06-20 7699 7870 5
2018-06-20 24853 24957 5
24853 24957 5
7699 7870 5
7699 7870 5

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-02-09 H2O 15 6993 Bbl 410099 US Well Services Inc STAGE 86/86

STAGES 2-85 SEE IMAGES

2018-01-02 H2O 15 6394 Bbl 249684 US Well Services Inc STAGE 1/86

STAGES 2-85 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 2332848 116728 245
2019 ANTERO RESOURCES CORPORATION 813961 16391 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 32968 245
2019 ANTERO RESOURCES CORPORATION Brine 9172 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1029302808 2020-3-12 0:00: PW No Violations 1.00
-1081640055 2018-5-23 0:00: PW No Violations 0.20
-1845397254 2017-4-24 0:00: CS No Violations 1.50
-558727457 2020-2-14 0:00: PW No Violations 0.50
0000646884 2018-03-25 Completion Testing No Violations Status check inspection found the well drilling and stimulation process now complete. A Fortis Energy service rig is on location drilling out the completion plugs and running the production tubing on all 5 wells on the pad with a tubing snubbing unit owned by QVS rigged up on the well head Blow Out Preventer. Well control over the 3,000 psi 5.5 diameter casing internal pressure will be managed with 9.7 to 10.7 pound per gallon brine water with the company utilizing pressure managed drilling to maintain surface control. The well bore was stimulated in 86 stages between the measured depths of 7,699 and 24,833. Falcon Flow Back Service is controlling well pressure at surface and monitoring all annular pressures every 2 hours. The well head A @ B section along with the tubing head is a Cameron Well Head.
1081640055 2018-05-23 Production Wells No Violations Status check inspection found a total of 5 wells on the well pad. Each well has had the drilling and completion process complete and is in the initial production stages. The wells are being produced through choke manifolds and sand traps with a 3rd party flow back contractor on site monitoring the initial production process. All well bore annulis were monitored through the completion stages and the wells do have flow lines valves and monitoring points on the 13.375 and 9.625 well head sections. There is a total of 5 glycol heaters on site. Also present on the East side of the well pad is a production fluid tank farm consisting of a total of 14 steel tanks of 400 barrels fluid capacity each, the tanks are situated inside a polymer lined steel containment dike area with the well ad perimeter berm serving as the primary containment with the perimeter drain valves closed. Multiple tank trucks were on site hauling both production fluid and water.
1496406232 2017-06-02 Casing String Witnessed No Violations The purpose of my inspection today was to witness the cementing of the Surface casing. Schlumberger was on location to cement 392 feet of the 18.625 inch diameter casing within a 24 inch diameter borehole that was 402 feet in depth. I witnessed the last joint being landed. A pre-job safety meeting was held with all personnel on location. Schlumberger pumped 225 barrels of fresh water, 30 barrels of gel spacer, 10 barrels water, and 130 barrels of cement at 15.6 pound per gallon. Cement sample was pulled and weighed in pressurized scales confirming a weight of 15.6 pound per gallon. Top plug was dropped and displaced with 109 barrels of water. 39 barrels of cement returns were witnessed in the half rounds. The plug was bumped and held for 15 minutes and the floats held.
1523403863 2018-04-10 Completion Testing No Violations Status check inspection on the well completion process found thee well drilling and stimulation process has been completed and a service rig owned by Fortis Energy is on location and rigged up n the hole drilling out the completion plugs. The rig has drilled out 55 of the 86 total stage plugs set and is running back in the hole with a fresh 4.5drill bit after pulling the string for a bit exchange, the down hole drill out tools are owned by Through Tubing Solutions. The company is managing pressure with 10 pound per gallon brine water. Falcon Flowback is on location along with a snubbing unit rigged up on the hoe owned by QES Company. The 13.375 and 9.625 casing well heads sections have annular pressure gauges installed and the pressures are being check and recorded every 4 hours daily with zero annular pressure reported at the last recording at 12;00 pm. There is (2) wells on the pad left to have the completion drill out administered and the production tubing installed, the Walley #1 and # 2.
1543644215 2020-3-12 0:00: PW No Violations 1.00
1605969283 2017-10-19 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. The pad is named Andes and it consists of 5 wells. During my inspection the lease road was paved with an asphalt surface and the well pad had a gravel surface surrounded by a berm. There were not any erosion issues within the wellsite boundary. Contactors were on location setting up the production equipment. Location has met Preliminary Restoration Requirements listed within 1509.072 (A).
1845397254 2017-04-24 Casing String Witnessed No Violations The purpose of my inspection was to witness 100 feet of the 26 inch diameter conductor being cemented in a 30 inch diameter hole that is 100 feet in depth. Express Energy Services drilled the conductor with a rotary rig and auger bit. No water was encountered during the drilling process. During my inspection Express Energy Services was on location to complete the cement operations. Job calculations were discussed with Express and Antero Company Man. A pre job safety meeting was held with all personnel on location. I witnessed Express pump fresh water and gel ahead of 330 sacks of class A cement with 2% gel, displaced with 55.74 barrels of fresh water, and cement returns were established. The cellar floor was cemented making the depth of the cellar 6 feet.
209470363 2019-9-13 0:00: PW No Violations 0.50
2098227709 2017-12-11 Completion Testing No Violations The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection I witnessed US Well Services setting up on location. The well was equipped with a frac stack and goat head flange style wellhead. I received an email from the Antero stating that they will be finishing rigging up this week.
646884 2018-3-25 0:00: CT No Violations 0.50

For data sources see[9]

References