34-121-24623

Well Details

Well ID: 34-121-24623
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001443
Farm/Lease Name: DINGUS UNIT
License Status: Producing
License Date: 2017-02-14
Spud Date: 2017-02-18
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-04-17
Well Total Depth: 19208.00 ft
Configuration: Horizontal
Latitude: 39.930000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-14 Proposed Formations:POINT PLEASANT, Issued Date:2/14/2017, Expired Date:2/14/2019 12:00:00 PM, Drilling unit acres:571.999, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-04-17 12 MONTH CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/24/17.
Correction to Well 2017-06-27 UPDATE TARGET/TAKE PER AS-DRILLED PLAT RCVD 5-24-2017 ALE.
Completion Report Received 2018-08-09 12 MONTH CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/24/17.
Record Last Modified 2018-08-17 12 MONTH CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/24/17.
Construction Permit Expires 2019-02-14 12 MONTH CONFIDENTIALITY REQUEST ON ALL LOGS-ALE 05/24/17.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-08-16 8459 8628 0
2018-08-16 16255 16304 0
16255 16304 0
8459 8628 0
8459 8628 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/09/2018 06/22/2018 8135 11,907,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.004144 4783.27
Deionized Water 7732-18-5 28 0.002367 2732.18
SI-1200s U.S. Well Services, LLC Scale Inhibitor Proprietary Scale Inhibitor Proprietary 10 0.001224 1412.34
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Butyl cellosolve 111-76-2 20 0.00001500 17.6737
Cinnamaldehyde 104-55-2 20 0.00001800 20.2826
Formic acid 64-18-6 20 0.00001700 19.6157
Polyether 60828-78-6 10 0.00000800 9.80784
Ethylene glycol 107-21-1 40 0.00004900 56.1008
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000400 4.90392
WFRA-405 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.013086 15104.6
Hydrated light distillate (petroleum) 64742-47-8 30 0.010534 12159.2
LGC-15 U.S. Well Services, LLC Gelling Agents Guar Gum 9000-30-0 50 0.006835 7890.06
Suspending agent (solid) 14808-60-7 3 0.001045 1206.71
Petroleum Distillates 64742-47-8 60 0.006474 7472.35
Surfactant 68439-51-0 3 0.00041 473.403
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 13.736 15,855,200.0
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.000195 225
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 86.0349 99,308,800.0
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.4 0.148251 171124
Hydrogen Chloride 7647-01-0 17.5 0.034468 39786

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-06-09 H2O 15 5709 Bbl 196900 US Well Services Inc STAGE 1/40

STAGES 2-39 SEE IMAGES

2018-06-22 H2O 15 7263 Bbl 400610 US Well Services Inc STAGE 40/40

STAGES 2-39 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 1391512 30031 184
2019 ANTERO RESOURCES CORPORATION 700617 4925 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 21276 184
2019 ANTERO RESOURCES CORPORATION Brine 10980 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1668002891 2017-8-7 0:00:0 PW No Violations 1.00
-1681294098 2017-3-15 0:00: DD No Violations 1.00
-1720532368 2017-2-23 0:00: DD No Violations 0.50
0080835744 2017-03-09 Casing String Witnessed No Violations On the day of my inspection I witnessed that Patterson UTI Rig #342 had drilled a 17.5 inch diameter hole to the depth of 1147 feet. Wyoming Casing Crew ran 1141.5 feet of 13.375 inch 54.5 pound per foot J-55 casing 4.5 feet above KB which is 25 feet and having to wash down the last joint of casing. Schlumberger Services was on site loaded their lines with 5 barrels of fresh water, performed a low pressure test at 500 pounds per square inch and performed a high pressure test at 2000 pounds per square inch then gained circulation with a total of 264 barrels of fresh water. Schlumberger dropped bottom plug, pumped 30 barrels of gel and 10 barrels of fresh water then cemented the casing with 1060 sacks of Class A cement weighing 15.6 pounds per gallon and a yield of 1.19 cubic foot per sack cement with 1% Calcium Chloride. Cement weight was verified by pressurized mud scales. Schlumberger dropped top plug and cement was displaced with 172.5 barrels of fresh water. Had good cement returns of 45.5 barrels, plug was landed at 520 pounds per square inch, pressured to 1020 pounds per square inch for 7 minutes and the floats held with 1 barrel back. Mix water was tested revealing chlorides of less than 33 parts per million, pH 7 and 53 degrees.
0100210465 2018-07-27 Production Wells No Violations Status check inspection found the well has been in production now for approximately 72 hours. There is 3 active wells total on this pad at this time. A 3rd party contractor identified as Warrior Energy service is on location and providing flow back services. The well is producing through the production tree into Warriors 3 diameter flow back lines with a single nitrogen activated emergency shut down (ESD) device in line downstream from the well head. following the ESD is a sand trap separator followed by a choke manifold system then a second sand trap system before the production fluid enters the gas processing units (GPU). The sand trap separators are being evacuated into a 500 barrel gas buster separation tank which is situated inside a polymer containment area. The well head is equipped with a lower A -13.375 section and upper B 9.625 section with flow lines and annular pressure monitoring gauges installed. Also attached to the annular pressure monitoring is a 2 sales line system with manually operated valves and choke valves in line. The lines are feeding into the wells low pressure recover system. The well does have a production tree installed with mechanical gauges on the production flow line indicating 2,800 pounds per square inch pressure on the production flow line. The 5.5 diameter casing has 3,630 psi. Production tubing is set in the well and electronic transducers are present on both the production flow line and casing well head section. Also present on location is a production fluid facility consisting of 12 steel design 400 barrel fluid capacity production tanks, the tanks are situated together inside a polymer lined steel containment dike area. The well pad does have a perimeter earthen berm present. Well identification is posted at each well.
100210465 2018-7-27 0:00: PW No Violations 0.50
1274426363 2020-4-28 0:00: PW No Violations 0.40
1488812562 2017-03-06 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson UTI Drilling Rig #342 was preparing to raise their derrick and complete rig up. Upon completion they will begin to drill the surface section of the well with a 17.5 inch diameter bit and run 13.375 inch diameter 54.5 pound per foot J-55 casing to approximately 1160 feet. Walk around was completed with Antero Consultant Josh Scharf revealing proper containment was in place.
1493249813 2017-04-26 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the area affected by the pad and road construction has been restored. There were no erosion issues on location. Location has met 1509.072 A requirements.
1571334906 2019-10-17 0:00 PW No Violations 0.80
1581353464 2020-2-10 0:00: PW No Violations 0.50
1668002891 2017-08-07 Production Wells No Violations The purpose of my inspection today was a status check. During my inspection the well had not yet been put into production and no production lines were attached to the well. The production equipment on the pad consisted of twelve 400 barrel tanks, 3 gas production units, 5 compressors, and 2 combustors. The natural gas pipeline tie in was located on the south side of the pad.
1681294098 2017-03-15 Drill / Deepen / Reopen No Violations During my inspection Patterson Drilling Rig 342 was drilling the 12.25 inch diameter borehole at a depth of 7147 feet with a proposed total intermediate depth of 7511 feet.
1720532368 2017-02-23 Drill / Deepen / Reopen No Violations
80835744 2017-3-9 0:00:0 CS No Violations 11.00

For data sources see[10]