X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24629

Well Details

Well ID: 34-121-24629
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001276
Farm/Lease Name: HANNAH UNIT
License Status: Producing
License Date: 2017-09-11
Spud Date: 2017-09-13
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-12-29
Well Total Depth: 19808.00 ft
Configuration: Horizontal
Latitude: 39.870000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-07-31 Proposed Formations:POINT PLEASANT, Issued Date:7/31/2017, Expired Date:7/31/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-09-11 Proposed Formations:POINT PLEASANT, Issued Date:9/11/2017, Expired Date:9/11/2019 12:00:00 PM, Drilling unit acres:685.745, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-12-29
Completion Report Received 2018-10-04
Record Last Modified 2018-10-20
Construction Permit Expires 2019-09-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-19 8099 8267 0
2018-10-19 19641 19697 0
19641 19697 0
8099 8267 0
8099 8267 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/10/2018 05/07/2018 8049 18,437,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.003774 6729.29
Deionized Water 7732-18-5 28 0.002156 3843.74
LGC-15 U.S. Well Services, LLC Gelling Agents Guar Gum 9000-30-0 50 0.04818 85897.4
Petroleum Distillates 64742-47-8 60 0.045629 81349.9
Suspending agent (solid) 14808-60-7 3 0.007369 13137.3
Surfactant 68439-51-0 3 0.002891 5153.84
SI-1200 U.S. Well Services, LLC Scale Inhibitor Ethylene Glycol 107-21-1 40 0.002569 4579.66
Proprietary Scale Inhibitor Proprietary 10 0.000687 1224.98
WFRA-405 U.S. Well Services, LLC Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.018976 33831
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.023572 42026.1
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 86.2466 153,764,000.0
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Butyl cellosolve 111-76-2 20 0.00001500 26.0297
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000400 7.22244
Polyether 60828-78-6 10 0.00000800 14.4449
Ethylene glycol 107-21-1 40 0.00004600 82.6247
Formic acid 64-18-6 20 0.00001600 28.8898
Cinnamaldehyde 104-55-2 20 0.00001700 29.872
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.001898 3383
SI-1200s U.S. Well Services, LLC Scale Inhibitor Proprietary Scale Inhibitor Proprietary 10 0.000802 1429.39
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.032762 58409.2
Water 7732-18-5 87.4 0.140912 251225
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 13.4211 23,927,700.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-04-10 H2O 15 4376 Bbl 154960 US Well Services Inc STAGE 1/59

STAGES 2-58 SEE IMAGES

2018-05-07 H2O 15 6444 Bbl 417880 US Well Services Inc STAGE 59/59

STAGES 2-58 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION 1611052 24671 184
2019 ANTERO RESOURCES CORPORATION 845386 7947 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ANTERO RESOURCES CORPORATION Brine 18089 184
2019 ANTERO RESOURCES CORPORATION Brine 7660 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1096274418 2017-9-25 0:00: DD No Violations 0.50
-1139584598 2018-9-18 0:00: PW No Violations 0.10
-1161377193 2017-10-25 0:00 CS No Violations 7.00
-1587392124 2019-8-20 0:00: PW No Violations 0.50
-1824609435 2018-2-22 0:00: PL No Violations 0.50
-745862780 2020-2-10 0:00: PW No Violations
1096274418 2017-09-25 Drill / Deepen / Reopen No Violations My inspection today found a 100 foot deep 26 inch diameter conductor cemented into a 32 inch diameter borehole. Containment was laid on the pad and sound barriers surrounded the pad. HP Drilling Rig 519 is scheduled to arrive on the pad in October.
1139584598 2018-09-18 Production Wells No Violations The Troyer Pad has 6 wells. The well was equipped with a production tree style wellhead. The wells on the pad were in the process of flowing back through Enercorp Sand solutions. The production equipment consisted of six indirect line heaters, six sand traps, six gas production units, a gas buster, fourteen 400-barrel tanks, three vapor recovery towers, and four combustors. Teksolv was on location monitoring gas metering stations and Antero well tenders were monitoring flowback.
1161377193 2017-10-25 Casing String Witnessed No Violations The purpose of my inspection today was to witness the cementing of the Surface casing. Schlumberger was on location to cement 397 feet of the 18.625 inch diameter casing within a 24 inch diameter borehole. A pre-job safety meeting was held with all personnel on location. Schlumberger pumped 215 barrels of fresh water to load the hole, 30 barrels of gel spacer, 10 barrels water, and 130 barrels of cement at 15.6 pound per gallon. Cement sample was pulled and weighed in pressurized scales and the results were 15.2 pounds per gallon. I witnessed Schlumberger bump the density up to 15.6 pounds per gallon on the pump truck. The plug was dropped and displaced with 110.4 barrels of water. Gel spacer circulated to surface 120 barrels into pumping cement. Cement circulated to surface 70 barrels into displacement. The plug was bumped and held for 15 minutes and the floats held.
1824609435 2018-02-22 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection 6 wells had been drilled to total depth and are awaiting completion. The drilling rig has moved off of location. The area affected by pad construction had been remediated. Location has met 1509.072 (A) requirements.

For data sources see[10]

References