X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-127-23705

Well Details

Well ID: 34-127-23705
Loading map...
Country: United States
State: Ohio
County: Perry
Municipality: Reading Township
Operator Name: JOHNSON MIKE
Well Pad ID:
Farm/Lease Name: MILLER
License Status: Final Restoration
License Date: 2006-12-06
Spud Date: 1977-01-01
Spud Drilling Contractor:
Final Drill Date: 1977-06-01
Well Total Depth: 3188.00 ft
Configuration: Vertical
Latitude: 39.750000
Longitude: -82.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1976-07-28 1177 ENERGY DISTRIBUTORS INC GeoDate 7/28/76
Original Spud 1977-01-01 R.I. 8-4-76 I.P. NONE REPT.
Completed 1977-06-01 R.I. 8-4-76 I.P. NONE REPT.
Reached Total Depth 1977-06-01 R.I. 8-4-76 I.P. NONE REPT.
CO 1992-02-05 2920 TEXTRON OIL CORP GeoDate 7/28/76
CO 1994-05-23 2573 JOHNSON M & GINGERICH M GeoDate 7/28/76
CO 1996-04-18 5460 JOHNSON MIKE GeoDate 7/28/76
APP 2006-12-06 Proposed Formations:CLINTON, Issued Date:12/6/2006, Expired Date:12/6/2007 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2007-04-06 R.I. 8-4-76 I.P. NONE REPT.
Construction Permit Expires 2007-12-06 R.I. 8-4-76 I.P. NONE REPT.
Record Last Modified 2013-03-14 R.I. 8-4-76 I.P. NONE REPT.

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1994 JOHNSON M & GINGERICH M 0.00 189.00 245
1996 JOHNSON MIKE 0.00 145.00 365
1999 JOHNSON MIKE 0.00 0.00 0
2000 JOHNSON MIKE 0.00 0.00 0
2001 JOHNSON MIKE 0.00 0.00 365
2002 JOHNSON MIKE 0.00 0.00 365
2003 JOHNSON MIKE 0.00 0.00 365
2004 JOHNSON MIKE 0.00 0.00 365
2005 JOHNSON MIKE 0.00 0.00 365
2006 JOHNSON MIKE 0.00 0.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1994 JOHNSON M & GINGERICH M Brine 0 245
1996 JOHNSON MIKE Brine 0 365
1999 JOHNSON MIKE Brine 0
2000 JOHNSON MIKE Brine 0
2001 JOHNSON MIKE Brine 0 365
2002 JOHNSON MIKE Brine 0 365
2003 JOHNSON MIKE Brine 0 365
2004 JOHNSON MIKE Brine 0 365
2005 JOHNSON MIKE Brine 0 365
2006 JOHNSON MIKE Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1137588885 2006-2-23 0:00: PW No Violations
-1171473151 2007-11-7 0:00: PB No Violations
-17475709 2007-7-30 0:00: PB No Violations
-265228012 2007-3-21 0:00: PB No Violations
-709068470 2007-3-20 0:00: PB No Violations
-791483807 2008-4-29 0:00: PW No Violations
0017475709 2007-07-30 Plug / Plug Back No Violations Final Restoration not done, due date 10/6/07
0265228012 2007-03-21 Plug / Plug Back No Violations Rig broke down will take several days to repair.
0374272764 2008-06-04 Final Restoration No Violations Restoration meets 1509.072(B) requirements.
0428939568 2007-03-12 Production Wells No Violations Follow-up on NOV, IN-COMPLIANCE, plug rig moving in.
0628170509 2006-08-30 Production Wells No Violations Follow-up on NOV, Non-Compliance, took photos of violations, well still idle, production tank leaking oil and brine since last inspection, flow lines not buried in field, spoke with landowner company has not been to well for several months.
0709068470 2007-03-20 Plug / Plug Back No Violations Plugging rig broke down.
0791483807 2008-04-29 Production Wells No Violations Follow-up on NOV, In-Compliance.
1077994570 2007-04-04 Plug / Plug Back No Violations Set 7 precast plug and washed in clay.
1137588885 2006-02-23 Production Wells Violations Noted An inspection of the well revealed no production from well since 1996 according to production records and landowner. No ID at well or tank battery, production lines crossing pasture field needs buried, dike needs built around tanks.
1171473151 2007-11-07 Plug / Plug Back No Violations Spoke with Mike Johnson about Final Restoration, explained to him there are several areas on well site and tank battery pad that need remedial restoration work.
1369664167 2006-03-31 Production Wells No Violations Follow-up on NOV, Non-Compliance.
1492151498 2007-03-13 Plug / Plug Back No Violations Pulling tubing & rods.
2113547141 2008-03-06 Plug / Plug Back Violations Noted An inspection of the well site revealed Final Restoration does not meet 1509.072(B) requirements. Well site needs work and tank pad, there is still flow line on lease. Well was plugged 4/6/07
374272764 2008-6-4 0:00:0 FR No Violations
428939568 2007-3-12 0:00: PW No Violations
628170509 2006-8-30 0:00: PW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1137588885 US-OH-103474 2006-02-23 Failure to properly bury pipeline
1137588885 US-OH-103475 2006-02-23 Failure to legibly identify well
1137588885 US-OH-103476 2006-02-23 No SPCC dike/or failure to keep dike free of water or oil
1137588885 US-OH-103477 2006-02-23 Well shall be plugged
2113547141 US-OH-121622 2008-03-13 Failure to remove production equip. within 6 mos. REPLACE
2113547141 US-OH-121623 2008-03-13 Failure to restore land surface within 6 months (CHANGE)
2113547141 US-OH-121624 2008-03-13 Urban area; failure to close drilling pits within 14 days

For data sources see[7]

References