X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-129-20242

Well Details

Well ID: 34-129-20242
Loading map...
Country: United States
State: Ohio
County: Pickaway
Municipality: Jackson Township
Operator Name: MARKSMEN ENERGY USA INC
Well Pad ID:
Farm/Lease Name: BJ-78 (ERP #1)
License Status: Active Injection
License Date: 2014-11-19
Spud Date: 2014-05-08
Spud Drilling Contractor: G & L DRILLING
Final Drill Date: 2014-05-18
Well Total Depth: 2520.00 ft
Configuration: Vertical
Latitude: 39.620000
Longitude: -83.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-05-02 Proposed Formations:TRENTON-BLACK RIVER-TREMPEALEAU, Issued Date:5/2/2014, Expired Date:5/1/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-05-18
APP 2014-11-19 Proposed Formations:TREMPEALEAU, Issued Date:11/19/2014, Expired Date:11/18/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:IER, Proposed Well Class:ERP
Last Compliance Report 2015-03-27
Construction Permit Expires 2016-11-18
Change of Owner 2017-01-04 Operator changed from 6227, HOUGHTON INVESTMENTS LLC to 9491, MARKSMEN ENERGY USA INC
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-11 2441 2445 13
2015-03-30 2475 2485 31
2441 2445 13
2475 2485 31
2441 2445 13

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-06-09 ACID 15 0 Gal 0 Producers Service Corporation

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1082202257 2020-1-7 0:00:0 ER No Violations 1.50
-1196013015 2015-3-2 0:00:0 DD No Violations 2.00
-1231182179 2019-10-29 0:00 ER No Violations 3.50
-1360547406 2015-11-2 0:00: ER No Violations 1.00
-1407240288 2019-12-10 0:00 ER No Violations 3.00
-1468287152 2019-7-15 0:00: ER No Violations 1.00
-1478172481 2014-9-30 0:00: PW No Violations
-1702232915 2020-5-26 0:00: ER No Violations 0.50
-1984500119 2018-5-14 0:00: ER No Violations 0.60
-311742428 2015-9-30 0:00: SW No Violations 3.00
-315159543 2016-7-27 0:00: ER No Violations 1.00
-455738081 2016-3-7 0:00:0 ER No Violations 1.50
-583810651 2015-9-16 0:00: ER No Violations 1.00
-609323129 2017-12-13 0:00 SW No Violations 0.30
-668118581 2020-7-27 0:00: ER No Violations 0.50
-711753855 2017-6-6 0:00:0 SW No Violations 1.00
-754567959 2019-9-27 0:00: ER No Violations 2.50
0069820815 2014-05-16 Casing String Witnessed No Violations I returned to this well to witness the cementing of the surface casing. After talking with Steve Opritza they have decided to perf the 7 and squeeze cement through. We were able to get good circulation and had good returns of cement. The rig crew said they were shutting down for 8hrs then would pressure test the 7.
0234038897 2018-09-20 Enhanced Recovery Project No Violations Compliance Notice # 1547452301 follow up inspection. The contaminated soil has not been removed from the location. Inspected the injection pressure and annulus pressure. Identification is posted.
0311742428 2015-09-30 Salt Water Injection Well No Violations UIC inspection. The annulus pressure was 18 PSI, the injection pressure was 220 PSI.
0315159543 2016-07-27 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted.
0455738081 2016-03-07 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Two pin recorder was connected to the injection and annulus. Identification posted at the well and facility.
0520275617 2016-01-21 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pressure and annulus pressure. The 2 pin recorder is connected to the injection tubing and the annulus. The injection tubing valve and the annulus valve are frozen. Pressures were not able to be recorded. The pressure pin on the recorder has been damaged by freezing. I talked to Bob Atha and he has ordered the repair parts and will be replacing them as soon as they come in. The containment dike sump pump line has been disconnected from the tank.
0583810651 2015-09-16 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Accompanied by UIC Geologist. Measured containment dike.
0609323129 2017-12-13 Salt Water Injection Well No Violations My inspection revealed the salt water injection well had 31 psi on the annulus and o psi on the injection tubing. Legible identification was posted.
0711753855 2017-06-06 Salt Water Injection Well No Violations Salt water injection well inspection. The annulus pressure was 23 PSI, the injection tubing pressure was 0 PSI. No violations noted.
0907221873 2018-12-05 Enhanced Recovery Project No Violations Compliance Notice # 1547452301 follow up inspection. No contaminated soil has been removed from the well site. One fiberglass tank has been removed from the containment dike.
1196013015 2015-03-02 Drill / Deepen / Reopen No Violations Conversion to enhanced recovery class 2 well. A service rig was scheduled to be on the well installing the packer and tubing today. The rig was canceled and the inspector was not notified of the change in schedule. I called Lee Atha and verified that the service rig has been canceled. Lee apologized for the lack of notification. The job is being rescheduled.
1229543891 2018-03-15 Salt Water Injection Well No Violations My inspection revealed the salt water injection well had 0 psi on the tubing and 145 psi on the annulus. The dike was free of fluids. Legible identification was posted.
1249990297 2016-11-15 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. A current chart was installed on the two pin recorder. The containment dike is free of fluids.
1360547406 2015-11-02 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Containment dike was free of fluids. The 2 pin recorder chart was wet and the ink smeared. I talked to Bob Atha about this issue. Bob said that they are planning to change somethings at the well site and that will be addressed.
1399893656 2014-05-12 Drill / Deepen / Reopen No Violations - Rig moved on locating 5/7/2014 Spud on 5/8/2014

- Conductor was set on 5/9/2014, rig shut down till 5/12/2014 - No crew on site

1400520326 2014-05-15 Casing String Witnessed No Violations I was onsite today to witness the cementing of the surface casing of this well. The cement did not come to surface and the circulation stopped. We ended up shutting down and had Appalachian come back out that night to run a bond-log on the well. The cement was down 447ft from the surface. There was a total of 614ft of 7 ran in the well. We shut down for the night to discuss what there options were.
1408380760 2014-08-18 Preliminary Restoration No Violations - On site for preliminary inspection, all pits filled in and rough graded some trash still on location.

- No pump unit on well. - All drilling equipment removed from location.

1408810291 2020-8-13 0:00: ER No Violations 0.70
1412098166 2014-09-30 Preliminary Restoration No Violations - On site for preliminary inspection.

- All pits have been filled and the area has been graded, the area has started to self-vegetate.

1412098945 2014-09-30 Production Wells No Violations Site evaluation for permit to convert to salt water injection well. Well is located in a flat agricultural field. Well is equipped with 4.5 casing with a 4.5 by 2 swedge with a 2 valve that is closed. Well is not connected to production equipment or production lines. A search of the .5 mile radius revealed no water wells and two streams. 1st is an intermittent stream located 694 feet North East of the well. 2nd Lick Run is located 2264 feet West of the well. Route 56 is located 781 feet North of the well. Met with Lee Atha and reviewed the surface facility plans.
1427476019 2015-03-27 Production Wells No Violations Convert to salt water injection well. Installed 2432 of 2 7/8 8rd J55 Polylined tubing (new) with a Parmaco packer(new). Producers Service company on site for acid job (2000 gallons 20% HCL) prior to setting the packer. Perforations 2441-2445(13 shots) 2475-2485 (31 shots). Packer set at 2432. Annulus was filled with fresh water and inhibitor and tested at 560 psi for 15 minutes with no loss in pressure.
1430419161 2015-04-30 Surface Facility Construction No Violations Installing 2 7/8 6.5lb J55 8 rd. tubing as the injection line from the well to new facility location.
1431007517 2015-05-05 Surface Facility Construction No Violations Conversion to ERP Surface Facility Construction. Installing 30 mill plastic liner in containment dike. A 4sand layer has been placed below the liner.
1431610477 2015-05-13 Surface Facility Construction No Violations Containment dike has been constructed and 5 fiberglass tanks have been placed in the containment. Tanks are not connected at this time. Currently working on installing lines from the production tanks to the injection facility. Final dimensions of constructed containment dike are: 102 feet by 64 feet by 44 inches (to top of 30 mil liner). 30 mil liner is covered with a berm material.
1434037758 2015-06-11 Enhanced Recovery Project No Violations Witnessed initial injection operations. Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. A murphy pressure cut off switch is installed at the outlet side of the injection pump. A inline flow meter (gallons) is installed on the outlet side of the filter housing line. A two pin recorder has been ordered to monitor the injection pressure and annulus pressure.
1478172481 2014-09-30 Production Wells No Violations - On site for inspection to convert well into salt water disposal well.

- Joint inspection with Jon Scott MRI 3 UIC specialist, review permit application, site inspection. - No domestic water well in the vicinity, small drainage ditch 198 yards north of the well. - Application shows a storage facility of six 500 barrel tanks and an unloading pad with a vault, the site will support this type of operation. -

1489774120 2017-03-16 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. The containment dike is free of fluids. The two pin recorder is connected to the injection tubing and annulus of the well, a current chart is installed.
1536253267 2018-08-29 Enhanced Recovery Project No Violations Compliance Notice # 1547452301 follow up. Field test scald area at wellhead with high range Quantabs. 6.8 on the strip = 2277 ppm Cl. Inspected the containment dike. The containment dike is free of fluids.
1547452301 2018-08-28 Enhanced Recovery Project Violations Noted While conducting the quarterly UIC inspection an area of dead vegetation was observed extending east 69 feet by 24 feet from the well site. A field test of the soil with High Range Quantabs revealed 6.8 on the strip which is 2277 ppm Cl. Bob Atha was contacted on 8-28-2108 at 1:53 pm. Bob stated that they had a leak at the well head a week and a half ago. I told Bob that the contaminated soil must be removed and disposed of at an EPA approved landfill.
1551117922 2019-02-22 Enhanced Recovery Project No Violations Compliance notice # 1547452301 follow up inspection. Inspected the containment dike, tanks, injection pump ,injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluid. There has been no remediation to the location. The soy bean crop has been harvested. The field is saturated from recent rain events.
1577367576 2019-04-24 Enhanced Recovery Project No Violations Compliance Notice # 1547452301 follow up inspection. The field has been plowed. The two pen recorder has a current chart installed. The containment dike is free of fluids.
1582309008 2015-07-14 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. The 2 pin pressure recorder has been installed and has a current chart.
1774772095 2020-8-24 0:00: ER No Violations 2.00
1984500119 2018-05-14 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. The identification is posted. I talked to the well attendant about the identification being faded and the need for it to be legible. The containment dike is free of fluids.
2052057662 2016-04-01 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. A new chart for April was installed on the two pin recorder. Containment dike was free of fluids.
2135989900 2019-10-28 0:00 ER No Violations
234038897 2018-9-20 0:00: ER No Violations 0.50
520275617 2016-1-21 0:00: ER No Violations 2.00
69820815 2014-5-16 0:00: CS No Violations 8.00
907221873 2018-12-5 0:00: ER No Violations 1.00
9730877 2019-9-16 0:00: ER No Violations 2.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1547452301 US-OH-115013 2018-08-29 9-5-06 Pollution/Contamination

For data sources see[5]

References