If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-129-20260 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6,"lon":-83.05,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Pickaway | |
| Municipality: Wayne Township | |
| Operator Name: HOCKING HILLS ENERGY AND WELL | |
| Well Pad ID: | |
| Farm/Lease Name: DELONG | |
| License Status: Final Restoration | |
| License Date: 2016-11-29 | |
| Spud Date: 2015-08-01 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2016-01-11 | |
| Well Total Depth: 2591.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.600000 | |
| Longitude: -83.050000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-07-20 | Proposed Formations:KNOX, Issued Date:7/20/2015, Expired Date:7/19/2017 12:00:00 PM, Drilling unit acres:58.429, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2016-01-11 | |
| Completion Report Received | 2016-11-25 | |
| APP | 2016-11-29 | Proposed Formations:KNOX, Issued Date:11/29/2016, Expired Date:11/29/2018 12:00:00 PM, Drilling unit acres:58.429, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2017-03-06 | |
| Record Last Modified | 2017-10-23 | |
| Construction Permit Expires | 2018-11-29 |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2016-01-28 | ACID | 15 | 1500 Gal | 0 | Producers Service Corporation |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | HOCKING HILLS ENERGY AND WELL | 0.00 | 0.00 | 30 |
| 2016 | HOCKING HILLS ENERGY AND WELL | 0.00 | 0.00 | 120 |
| 2017 | HOCKING HILLS ENERGY AND WELL | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | HOCKING HILLS ENERGY AND WELL | Brine | 220 | 30 |
| 2016 | HOCKING HILLS ENERGY AND WELL | Brine | 70 | 120 |
| 2017 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1010953906 | 2015-12-11 0:00 | PB | No Violations | 2.00 |
| -1476951622 | 2017-4-28 0:00: | FR | No Violations | 2.00 |
| -643254434 | 2015-11-11 0:00 | DD | No Violations | 6.00 |
| -759704396 | 2015-11-17 0:00 | DD | No Violations | 3.00 |
| 0249371270 | 2015-07-30 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number 1 has reached 664. They ran 660 of 7 surface casing with good cement returns The casing test was performed at 800 PSI for 15 minutes with no loss in pressure. |
| 0395822867 | 2015-08-31 | Production Wells | No Violations | Production well inspection. The well is being evaluated for future drilling operations. I was informed by Doug Kitchen with Hocking Hills Energy that a coil tubing unit would be brought in to deepen the well . This work will be done before 12/25/2105. |
| 0643254434 | 2015-11-11 | Drill / Deepen / Reopen | No Violations | A coil tubing drilling has arrived on site. Hocking Hills Energy has drilled a mouse hole. |
| 0759704396 | 2015-11-17 | Drill / Deepen / Reopen | No Violations | CJ Coil Tubing has attempted to drill horizontally into the Trenton formation. The cement plug that was set to allow the drilling to proceed horizontally had slid 200 Formation Cementing on site on 11-16-15 to bring the plug back up to 1750. No activity today to allow the plug to reach maximum strength. |
| 1010953906 | 2015-12-11 | Plug / Plug Back | No Violations | The well has been plugged back to 1750. The well was kicked off and drilled from 1745 to 2445. They hit oil and stopped drilling. Hocking Hills Energy is submitting a revised permit showing the new total depth of the well. I spoke with Doug Kitchen regarding closing the pit. Doug said he would have the pit closed by 12-23-15. |
| 1447424552 | 2015-11-13 | Drill / Deepen / Reopen | No Violations | CJ Coil tubing on site. They are rigging up to begin drilling with the coil tubing rig. |
| 1476951622 | 2017-04-28 | Final Restoration | No Violations | Final restoration inspection. The well was cut off 4 feet below grade and a identification plate was placed on the cut off casing. The well is located in a agriculture field. No seed or straw will be used. The well meets final restoration requirements. |
| 1488905437 | 2017-03-06 | Plug / Plug Back | No Violations | Knox Energy along with Formation Cementing on site at 8:30 AM. 50 Sack plug set on bottom with good circulation. 200 feet of 4.5 inch diameter casing was removed. 120 sack plug was set from 900 feet to surface. |
| 1689432246 | 2015-11-09 | Drill / Deepen / Reopen | No Violations | Hocking Hills Energy has placed 690 of class A cement as a plug. The plug was set from 1750 to 2440. The well was drilled to a total depth of 2591. Surface casing was ran but no production casing was ran. The well was a dry hole. The decision was made to set a cement plug then ran 4.5 production casing to allow coil tubing to be used to drill horizontally to reach the productive part of the formation. |
| 1864040983 | 2015-11-23 | Drill / Deepen / Reopen | No Violations | CJ Coil tubing on site. They began the project 11-12-15. Antech is providing the expertise with the drill motor used on the coil tubing. They have encountered may technical problems during their attempt to drill horizontally. The technology used to drill with coil tubing has had many problems. |
| 2016055960 | 2015-07-29 | Drill / Deepen / Reopen | No Violations | Conductor string cementing. Formation Cementing on site 10:30AM. The ran 110 sacks class A neat cement with good cement returns. |
| 249371270 | 2015-7-30 0:00: | DD | No Violations | 9.00 |
| 395822867 | 2015-8-31 0:00: | PW | No Violations | 3.00 |
For data sources see[8]