X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23243

Well Details

Well ID: 34-133-23243
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Atwater Township
Operator Name: BANCEQUITY PETROLEUM CORPORATI
Well Pad ID:
Farm/Lease Name: RODENBUCHER
License Status: Producing
License Date: 1984-06-29
Spud Date: 1984-11-26
Spud Drilling Contractor: SHERMAN DRLG
Final Drill Date: 1984-11-29
Well Total Depth: 4896.00 ft
Configuration: Vertical
Latitude: 41.000000
Longitude: -81.150000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1984-06-29 260 TWINOAKS OIL & GAS CO GeoDate 6/29/84
Oil and Gas 1984-06-29 Issued Date 6/29/84 Expired Date 12/26/84 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04896 Proposed Drill Depth 04896
Original Spud 1984-11-26
Completed 1984-11-29
Reached Total Depth 1984-11-29
Completion Report Received 1984-12-19
Construction Permit Expires 1984-12-26
CO 1991-10-24 631 BT ENERGY CORP GeoDate 6/29/84
CO 1996-04-09 4801 BANCEQUITY PETROLEUM CORP GeoDate 6/29/84
Correction to Well 2005-05-06 CORRECTION TO THE FOLLOWING: 1) UNIT SIZE: 41.61 ACRES; 2) FOOTAGE LOCATION: 705'SL & 1270'WL OF LOT 78; 3) X= 2,371,010; 4) Y= 489,995; AND 5)ELEV.= 1125'.
Record Last Modified 2019-06-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4660 4778 0
4660 4778 0
2006-09-11 4718 4778 30
4718 4778 30
4660 4778 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1800 Bbl 60000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 ACTION PETROLEUM INC 2108.00 5575.00 0
1986 ACTION PETROLEUM INC 3225.00 3313.00 365
1990 BT ENERGY CORP 0.00 507.00 365
1991 BT ENERGY CORP 1212.00 1489.00 365
1994 BANCEQUITY PETROLEUM CORPORATI 2146.00 601.00 365
1995 BANCEQUITY PETROLEUM CORPORATI 1933.00 961.00 365
1996 BANCEQUITY PETROLEUM CORPORATI 1479.00 653.00 365
1997 BANCEQUITY PETROLEUM CORPORATI 1254.00 633.00 365
1998 BANCEQUITY PETROLEUM CORPORATI 758.00 430.00 365
2000 BANCEQUITY PETROLEUM CORPORATI 1062.00 422.00 365
2001 BANCEQUITY PETROLEUM CORPORATI 749.00 623.00 365
2002 BANCEQUITY PETROLEUM CORPORATI 1045.00 530.00 365
2003 BANCEQUITY PETROLEUM CORPORATI 1449.00 210.00 365
2004 BANCEQUITY PETROLEUM CORPORATI 2654.00 411.00 365
2005 BANCEQUITY PETROLEUM CORPORATI 1662.00 303.00 365
2006 BANCEQUITY PETROLEUM CORPORATI 1761.00 411.00 365
2007 BANCEQUITY PETROLEUM CORPORATI 1941.00 312.00 365
2008 BANCEQUITY PETROLEUM CORPORATI 1846.00 126.00 365
2010 BANCEQUITY PETROLEUM CORPORATI 1146.00 82.00 365
2011 BANCEQUITY PETROLEUM CORPORATI 1645.00 212.00 0
2012 BANCEQUITY PETROLEUM CORPORATI 1103.00 290.00 366
2013 BANCEQUITY PETROLEUM CORPORATI 1209.00 0.00 365
2014 BANCEQUITY PETROLEUM CORPORATI 1700.00 37.00 365
2015 BANCEQUITY PETROLEUM CORPORATI 2037.00 497.00 365
2016 BANCEQUITY PETROLEUM CORPORATI 2187.00 400.00 365
2017 BANCEQUITY PETROLEUM CORPORATI 2399.00 291.00 365
2018 BANCEQUITY PETROLEUM CORPORATI 1800.00 310.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 ACTION PETROLEUM INC Brine 1540 0
1986 ACTION PETROLEUM INC Brine 300 365
1990 BT ENERGY CORP Brine 0 365
1991 BT ENERGY CORP Brine 0 365
1994 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
1995 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
1996 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
1997 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
1998 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2000 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2001 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2002 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2003 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2004 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2005 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2006 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2007 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2008 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2010 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2011 BANCEQUITY PETROLEUM CORPORATI Brine 0
2012 BANCEQUITY PETROLEUM CORPORATI Brine 0 366
2013 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2014 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2015 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2016 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2017 BANCEQUITY PETROLEUM CORPORATI Brine 0 365
2018 BANCEQUITY PETROLEUM CORPORATI Brine 25 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1298565772 2005-4-6 0:00:0 PW No Violations
-1765262723 2014-2-28 0:00: PW No Violations
0000PL6087 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0243482399 2017-12-18 Production Wells No Violations I returned to location this afternoon to check on steaming operations in the tank battery. Tom Frischietto (Bancequity), Scott Miller Contracting, and Stallion continued to steam the stone with 180 degree water and collect the oil with the vac truck. The collected product was being transferred into the 100 barrel tanks in the battery. 5200 gallons of water was used for steaming operations today. Clean-up will continue tomorrow (12/19/17).
0271865701 2018-04-13 Production Wells No Violations Status check inspection of this tank battery following an oil release inside secondary containment on 12/17/18. My inspection today found that the excavated sump holes inside the secondary containment have been lined with absorbent pads and have collected crude oil. The water in the holes is beginning to clear up and spring rain and warmer temperatures should aid in remediating the containment area. All oil is within the secondary containment area, is not leaching through the dike walls, and is not impacting the environment. I will continue to monitor progress at this location.
0957506244 2018-03-12 Production Wells No Violations Status check inspection of this tank battery following an oil release on 12/18/2017. My inspection today found that Bancequity continues to collect oil in the trenches inside the secondary containment area with absorbent pads. Snow and rain have pushed most of the oil to the west side of the containment area and the stone base in this area may need to be removed or steamed. Nothing has seeped through the dike walls or outside of containment. I will continue to monitor this location.
1298565772 2005-04-06 Production Wells No Violations Tank battery needs to be cleaned up. See the Bonath #1, P-3411 violation.
1513609741 2017-12-18 Production Wells No Violations I received a call from Tom Fischietto (President-Bancequity) on 12/17/17 that they had over-flowed a 100 barrel tank at this location. He said 4-5 barrels were inside containment and that Scott Miller Contracting (SMC) would be on location at 9:00am tomorrow (12/18/17) to begin cleaning up the tank battery. I was on location this morning with Tom, SMC, and a Stallion vac truck. There was thick oil around the two (2) 100 barrel tanks on the south side of the battery and covered an area of 15 X 30. Several sumps were dug, SMC began steaming the gravel, and Stallion was collecting the water and oil in the vac truck. No oil has migrated outside of secondary containment. I will check back later on progress.
1513707306 2017-12-19 Production Wells No Violations I was on location to follow-up on the clean-up of the secondary containment area of this tank battery. Tom Frischietto (Bancequity), Scott Miller Contracting (SMC), and Stallion were conducting operations. SMC repaired the burner on the steamer truck and they continued to flush the oil from the rock and collect it from the sumps that have been dug. The collected oil is being transferred to the 100 barrel tanks within the containment area. Progress is currently slow but steady. I will check back tomorrow on progress. This clean-up continues.
1513781204 2017-12-20 Production Wells No Violations Status check inspection of clean-up operations at this tank battery. There is currently no activity on location and all oil is contained within the secondary containment. I spoke with Tom Frischietto (Bancequity) this morning and they are planning on letting things settle after two (2) days of steaming the gravel and assess what else needs to be done to remediate the battery. He told me that Ergon will be shipping the collected oil today. I will be in touch with Bancequity for updates. This clean-up continues.
1514468246 2017-12-28 Production Wells No Violations Status check inspection of this tank battery clean-up. My inspection today found that the excavated sump holes inside the secondary containment have been lined with absorbent pads and are soaked with crude oil and frozen. Current weather conditions have prohibited the oil from migrating to the sumps for collection and warmer temperatures will be required to continue with remedial activities. All oil is within the secondary containment area and is not impacting the environment. I will continue to monitor progress at this location.
1541704259 2018-11-08 Production Wells No Violations Status check inspection of this tank battery following an oil release inside secondary containment on 12/17/18. My inspection today found the west side of the tank battery holding water and that the free crude oil has been removed. There are still several pads floating on the water and there is a minor amount of residual sheen on top of the water. This situation has been resolved. No violations.
1765262723 2014-02-28 Production Wells No Violations I conducted a status check inspection of this well. My inspection found the well producing with the aid of a natural gas powered pumping unit. The area around the unit was recently logged out and is in poor condition. I inspected the tank battery and found that it is diked and contains the tanks and production units for this well and the Bonath #1 (PN#23411). This well produces through a horizontal separator to 2-100 barrel tanks. The proper IDs are posted on both sets of tanks. The equipment was in good condition and I found no violations at this time.
243482399 2017-12-18 0:00 PW No Violations 3.30
271865701 2018-4-13 0:00: PW No Violations 0.50
957506244 2018-3-12 0:00: PW No Violations 1.10
PL6087 PL No Violations

For data sources see[9]

References