X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23659

Well Details

Well ID: 34-133-23659
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: BECK ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: ANDES
License Status: Producing
License Date: 1988-07-07
Spud Date: 1988-10-15
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1988-10-19
Well Total Depth: 4245.00 ft
Configuration: Vertical
Latitude: 41.190000
Longitude: -81.350000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1988-07-07 Issued Date 7/7/88 Expired Date Acres 0168300 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth
Original Spud 1988-10-16 I.P. OIL & GAS EST.
Completed 1988-10-19 I.P. OIL & GAS EST.
Reached Total Depth 1988-10-19 I.P. OIL & GAS EST.
CO 1989-02-02 1888 BECK ENERGY CORP GeoDate 7/7/88
Completion Report Received 1989-05-16 I.P. OIL & GAS EST.
Construction Permit Expires 1989-07-07 I.P. OIL & GAS EST.
Record Last Modified 2017-02-15 I.P. OIL & GAS EST.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4056 4132 0
4056 4132 0
2006-09-11 4090 4130 15
4090 4130 15
4056 4132 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 89098 Gal 50000 FRAC:SAND/WATER

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1988 BECK ENERGY CORPORATION 0.00 0.00 0
1989 BECK ENERGY CORPORATION 17903.00 98.00 333
1990 BECK ENERGY CORPORATION 27774.00 276.00 32
1991 BECK ENERGY CORPORATION 32533.00 276.00 365
1992 BECK ENERGY CORPORATION 787.00 0.00 365
1993 BECK ENERGY CORPORATION 16895.00 99.00 365
1994 BECK ENERGY CORPORATION 29770.00 300.00 365
1995 BECK ENERGY CORPORATION 26524.00 196.00 365
1996 BECK ENERGY CORPORATION 22311.00 196.00 365
1997 BECK ENERGY CORPORATION 37524.00 182.00 365
1998 BECK ENERGY CORPORATION 36736.00 177.00 365
1999 BECK ENERGY CORPORATION 31908.00 174.00 0
2000 BECK ENERGY CORPORATION 26876.00 81.00 0
2001 BECK ENERGY CORPORATION 22139.00 95.00 365
2002 BECK ENERGY CORPORATION 28826.00 235.00 365
2003 BECK ENERGY CORPORATION 29561.00 94.00 365
2004 BECK ENERGY CORPORATION 26873.00 191.00 365
2005 BECK ENERGY CORPORATION 30737.00 153.00 365
2006 BECK ENERGY CORPORATION 24939.00 61.00 365
2007 BECK ENERGY CORPORATION 20362.00 0.00 365
2008 BECK ENERGY CORPORATION 26463.00 0.00 365
2009 BECK ENERGY CORPORATION 24981.00 0.00 365
2010 BECK ENERGY CORPORATION 22646.00 124.00 365
2011 BECK ENERGY CORPORATION 16020.00 0.00 365
2012 BECK ENERGY CORPORATION 13445.00 0.00 366
2013 BECK ENERGY CORPORATION 10993.00 123.00 365
2014 BECK ENERGY CORPORATION 10434.00 0.00 365
2015 BECK ENERGY CORPORATION 20823.00 123.00 365
2016 BECK ENERGY CORPORATION 21449.00 125.00 365
2017 BECK ENERGY CORPORATION 22330.00 124.00 365
2018 BECK ENERGY CORPORATION 21276.00 119.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1988 BECK ENERGY CORPORATION Brine 1015 0
1989 BECK ENERGY CORPORATION Brine 70 333
1990 BECK ENERGY CORPORATION Brine 220 32
1991 BECK ENERGY CORPORATION Brine 130 365
1992 BECK ENERGY CORPORATION Brine 0 365
1993 BECK ENERGY CORPORATION Brine 20 365
1994 BECK ENERGY CORPORATION Brine 140 365
1995 BECK ENERGY CORPORATION Brine 97 365
1996 BECK ENERGY CORPORATION Brine 103 365
1997 BECK ENERGY CORPORATION Brine 115 365
1998 BECK ENERGY CORPORATION Brine 113 365
1999 BECK ENERGY CORPORATION Brine 88
2000 BECK ENERGY CORPORATION Brine 35
2001 BECK ENERGY CORPORATION Brine 152 365
2002 BECK ENERGY CORPORATION Brine 75 365
2003 BECK ENERGY CORPORATION Brine 188 365
2004 BECK ENERGY CORPORATION Brine 104 365
2005 BECK ENERGY CORPORATION Brine 40 365
2006 BECK ENERGY CORPORATION Brine 96 365
2007 BECK ENERGY CORPORATION Brine 0 365
2008 BECK ENERGY CORPORATION Brine 0 365
2009 BECK ENERGY CORPORATION Brine 0 365
2010 BECK ENERGY CORPORATION Brine 0 365
2011 BECK ENERGY CORPORATION Brine 0 365
2012 BECK ENERGY CORPORATION Brine 0 366
2013 BECK ENERGY CORPORATION Brine 0 365
2014 BECK ENERGY CORPORATION Brine 0 365
2015 BECK ENERGY CORPORATION Brine 240 365
2016 BECK ENERGY CORPORATION Brine 204 365
2017 BECK ENERGY CORPORATION Brine 75 365
2018 BECK ENERGY CORPORATION Brine 70 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1178866892 2008-5-9 0:00:0 PW No Violations
-11827603 2007-6-1 0:00:0 PW No Violations
-1184451750 2009-5-4 0:00:0 PW No Violations
-1291234677 2007-5-24 0:00: PW No Violations
-1302489364 2020-1-31 0:00: UP No Violations 0.60
-958940466 2017-10-31 0:00 UP No Violations 0.90
0000PL5825 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0011827603 2007-06-01 Production Wells No Violations The leaf mulch has been spread and several trees, nearest to the wellhead, have been removed. The site will be monitored for any additional ground release and for the general recovery of the impacted trees. If necessary, additional trees will be removed.
0076309616 2007-05-25 Production Wells No Violations Beck personnel were on site to continue removing impacted leaf litter. After the removal has been accomplished, the area will be covered with peat to absorb any remaining product and to retain soil moisture to encourage vegetation recovery.
0958940466 2017-10-31 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced and equipped with 1.5 tubing and a plunger lift system. The required ID is posted on the fencing. This well produces to a diked and fenced tank battery to the west containing one (1) 210 barrel tank, a 35 barrel poly tank, and a horizontal separator. A gauge indicates 100psi at the separator. The man door is locked and the required ID is posted on the tank. No violations.
1031981117 2007-06-08 Production Wells No Violations The ground work has been completed. I will leave the violation open for a while longer to see what happens to the impacted trees.
1178866892 2008-05-09 Production Wells No Violations Several trees impacted last summer appear to have died and should be cut and removed unless the park wants them to stay for habitat. Other trees are starting to leaf out and should survive. The ground cover is coming through the leaf mulch used last year.
1184451750 2009-05-04 Production Wells No Violations Met with Junior on site. There have been an additional 10-12 trees that have died since the spill. The remaining trees appear to leafing out and the undergrowth is in good condition.
1185985017 2007-07-26 Production Wells No Violations The ground impact appears to be under control and vegetaion is starting to re-establish. The tree impact is still in question and will not be resolved until the spring of 2008. This NOV is closed.
1291234677 2007-05-24 Production Wells Violations Noted The Uniontown office received a phone call from Christine Craycroft, Director of the Portage Park District, reporting an oil spill on park property located on Ferguson Road. The well in question is the Andes #3 well owned and operated by Beck Energy. It appears that the rabbit catcher failed and the well sprayed an acre of trees and scrub vegetation. The oil/brine mixture resulted in at least leaf loss and at most tree loss over an acre of park property. The oil/brine mixture does not appear to have impacted a nearby wetland. Based on the condition of the trees, it appears likely that the release happened between four and six weeks ago. Beck did not report the spill to MRM, OEPA or the Park District. The spill was discovered by the Park Superintendent. Bart Raye with OEPA-DERR also was notified and responded to the site. Beck was directed to 1) remove and properly dispose the impacted leaf litter, 2) remove and properly dispose any impacted soil, 3) removed and properly dispose the most heavily impacted trees and 3) install a boom line between the impacted area and the nearby wetland. After discussing the issue with the park, it was decided to leave as many trees as possible and wait to see if they recover.
1915757380 2007-05-29 Production Wells No Violations Beck is continuing to remediate the spill by removing the impacted leaf litter and scrub vegetation.
2059596826 2008-07-10 Production Wells No Violations Ground cover continues to spread across the affected area.
2106259088 2007-05-30 Production Wells No Violations The impacted leaf litter has been removed and several trees will be taken down. Beck personnel were on site this day to start spreading leaf mulch over the remediated area. The leaf mulch is being used in place of peat moss or peatsorb.
76309616 2007-5-25 0:00: PW No Violations
PL5825 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1291234677 US-OH-108218 2007-06-01 Well operation causing pollution and contamination

For data sources see[9]

References