If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-23816 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-81.39,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: NORTH AMERICAN PETROLEUM INC | |
| Well Pad ID: | |
| Farm/Lease Name: MARSH | |
| License Status: Producing | |
| License Date: 2009-07-01 | |
| Spud Date: 2009-12-07 | |
| Spud Drilling Contractor: CAPSTAR DRILLING | |
| Final Drill Date: 2009-12-14 | |
| Well Total Depth: 4045.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.260000 | |
| Longitude: -81.390000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1990-11-28 | 2026 SUMMIT PETROLEUM INC GeoDate 11/28/90 |
| Oil and Gas | 1990-11-28 | Issued Date 11/28/90 Expired Date 11/28/91 Acres 0022700 Tool Type RTF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
| APP | 2008-06-13 | Proposed Formations:CLINTON, Issued Date:6/13/2008, Expired Date:6/13/2009 6:00:00 AM, Drilling unit acres:20.4, Proposed Well Type:OG, Proposed Well Class:POOL |
| Change of Owner | 2008-06-19 | Operator changed from 2026, SUMMIT PETROLEUM INC to 3802, NORTH AMERICAN PETROLEUM |
| Correction to Well | 2008-06-20 | CORRECTION TO OPERATOR NAME, SHOULD BE "NORTH AMERICAN PETROLEUM". |
| APP | 2009-07-01 | Proposed Formations:CLINTON, Issued Date:7/1/2009, Expired Date:7/1/2010 6:00:00 AM, Drilling unit acres:20.4, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2009-12-14 | LTD MEASURED IN CASED HOLE |
| Construction Permit Expires | 2010-07-01 | LTD MEASURED IN CASED HOLE |
| Completion Report Received | 2010-10-01 | LTD MEASURED IN CASED HOLE |
| Record Last Modified | 2017-10-24 | LTD MEASURED IN CASED HOLE |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2010-11-26 | 3816 | 3869 | 35 |
| 3816 | 3869 | 35 | |
| 3816 | 3869 | 35 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1833 Bbl | 60000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | NORTH AMERICAN PETROLEUM INC | 0.00 | 342.00 | 91 |
| 2011 | NORTH AMERICAN PETROLEUM INC | 9138.00 | 632.00 | 365 |
| 2012 | NORTH AMERICAN PETROLEUM INC | 9630.00 | 476.00 | 366 |
| 2013 | NORTH AMERICAN PETROLEUM INC | 8640.00 | 286.00 | 365 |
| 2014 | NORTH AMERICAN PETROLEUM INC | 7788.00 | 194.00 | 94 |
| 2015 | NORTH AMERICAN PETROLEUM INC | 5795.00 | 205.00 | 365 |
| 2016 | NORTH AMERICAN PETROLEUM INC | 5990.00 | 148.00 | 365 |
| 2017 | NORTH AMERICAN PETROLEUM INC | 4842.00 | 69.00 | 268 |
| 2018 | NORTH AMERICAN PETROLEUM INC | 4448.00 | 144.00 | 268 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | NORTH AMERICAN PETROLEUM INC | Brine | 206 | 91 |
| 2011 | NORTH AMERICAN PETROLEUM INC | Brine | 310 | 365 |
| 2012 | NORTH AMERICAN PETROLEUM INC | Brine | 179 | 366 |
| 2013 | NORTH AMERICAN PETROLEUM INC | Brine | 116 | 365 |
| 2014 | NORTH AMERICAN PETROLEUM INC | Brine | 365 | 94 |
| 2015 | NORTH AMERICAN PETROLEUM INC | Brine | 44 | 365 |
| 2016 | NORTH AMERICAN PETROLEUM INC | Brine | 16 | 365 |
| 2017 | NORTH AMERICAN PETROLEUM INC | Brine | 30 | 268 |
| 2018 | NORTH AMERICAN PETROLEUM INC | Brine | 30 | 268 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1464805593 | 2010-1-15 0:00: | DD | No Violations | |
| -1722067734 | 2010-2-11 0:00: | DD | No Violations | |
| -2010014882 | 2010-1-6 0:00:0 | DD | No Violations | |
| -2022912985 | 2009-12-14 0:00 | DD | No Violations | |
| -245804437 | 2010-1-14 0:00: | DD | No Violations | |
| -417700366 | 2010-7-20 0:00: | DD | No Violations | |
| -502539099 | 2011-4-27 0:00: | PL | No Violations | |
| -872007026 | 2009-12-22 0:00 | DD | No Violations | |
| -993854971 | 2010-9-7 0:00:0 | DD | No Violations | |
| 0244636933 | 2009-12-15 | Drill / Deepen / Reopen | No Violations | Capstar Drilling Rig 3 is starting to move off site. The rig is scheduled to move on 12/16. The drilling pits are fenced, lined and in good condition. |
| 0245804437 | 2010-01-14 | Drill / Deepen / Reopen | No Violations | Circle M is closing the drilling pits. Chemtech applied a total of two loads to the drilling pits. No violations at this time. |
| 0417700366 | 2010-07-20 | Drill / Deepen / Reopen | No Violations | Status check inspection found that the well has been fraced. Preliminary restoration is due by September 15. |
| 0502539099 | 2011-04-27 | Preliminary Restoration | No Violations | Preliminary restoration is approved. The site has been graded, seeded and grass is growing. The area around the wellhead is being used as pasture. |
| 0600983750 | 2018-03-20 | UrbanProduction Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced and locked. The well is equipped with 1.5 tubing and operating with the aid of a plunger lift system. A murphy gauge on the flow line indicates a pressure of 60psi. There is a domestic tap on the 4.5 production casing port equipped with two (2) regulators and a drip bottle that is not in service. This well produces to a diked, fenced, and locked tank battery to the northeast and contains one (1) 100 barrel tank, a 35 barrel poly tank, and a horizontal separator with a Dominion ROOTS meter run. The required ID is posted at the wellhead and at the tank battery. No violations. |
| 0872007026 | 2009-12-22 | Drill / Deepen / Reopen | No Violations | The pits have been pumped down and are still lined and fenced. |
| 0993854971 | 2010-09-07 | Drill / Deepen / Reopen | No Violations | The affected area needs to be regraded, seeded and mulched. The well must also be shut in until the required security fencing is installed. |
| 1262097654 | 2009-12-18 | Drill / Deepen / Reopen | No Violations | Capstar Drilling Rig 3 has moved off location. The pits are lined, fenced and in good condition. No word yet on when the pits will be solidified. Solidification is required by January 16, 2010. |
| 1264017028 | 2010-01-13 | Drill / Deepen / Reopen | No Violations | Circle M Oilfield Service is on site to finish pumping the pits down. ChemTech is scheduled in the morning to begin solidification of the pits. |
| 1345349182 | 2010-06-02 | Drill / Deepen / Reopen | No Violations | The well was drilling in December 2009. Other than the pits being solidified and closed, there has been no activity since the rig moved off. I will call and remind Rick Batta that preliminary restoration is due in August. |
| 1464805593 | 2010-01-15 | Drill / Deepen / Reopen | No Violations | Circle M is covering the pits. No violations at this time. |
| 1722067734 | 2010-02-11 | Drill / Deepen / Reopen | No Violations | No change in the status of this well. The pits have been solidified and covered over but the well has not been completed and there are no frac tanks on site other than one 300 bbl tank set near the road. |
| 2010014882 | 2010-01-06 | Drill / Deepen / Reopen | No Violations | The drilling pits are still open. I spoke with Rick Batta about the time deadline (mid-January) to solidify and close the pits. He said that he had scheduled to have the pits solidified on 1/05 but was delayed by the weather conditions. He is to call me when solidification is rescheduled. |
| 2022912985 | 2009-12-14 | Drill / Deepen / Reopen | No Violations | On 12/12 at 08:20 am, I received a call from Mark Beitzel, pusher on rig 3 reporting a good show of oil and gas from the Newburg at 3380. He reported that the interval was drilled at approximately 06:45 am. The rig was switching from air to fluid to contol the show. I received no calls or odor complaints as a result of the rigs prompt response to the situation. |
| 2109364934 | 2010-09-22 | UrbanPreliminary Restoration | No Violations | Preliminary restoration is due by the end of this month. The affected area has been properly graded and seeded. Assuming that the seed germinates and ground cover is established, preliminary restoration will be approved. |
| 244636933 | 2009-12-15 0:00 | DD | No Violations | |
| 600983750 | 2018-3-20 0:00: | UP | No Violations | 0.60 |
For data sources see[9]