X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24189

Well Details

Well ID: 34-133-24189
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Edinburg Township
Operator Name: STALLION OILFIELD SERVICES LTD
Well Pad ID:
Farm/Lease Name: MYERS (SWIW #33)
License Status: Active Injection
License Date: 2011-05-16
Spud Date: 2011-06-27
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING
Final Drill Date: 2011-07-15
Well Total Depth:
Configuration: Vertical
Latitude: 41.070000
Longitude: -81.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1998-03-16 5785 M-J OIL COMPANY INC. Proposed Formation NEWBURG Issued Date 3/16/98 Expired Date 3/16/99 6:00:00 AM
APP 1999-03-16 Proposed Formations:NEWBURG, Issued Date:3/16/99, Expired Date:3/15/00 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:SWD, Proposed Well Class:SWIW
Correction to Well 1999-06-18 CORRECTION IN FOOTAGE DESCRIPTION: FROM 368'SL & 860'WL OF SE QTR. LOT 4, SUBDIV. 2 TO 368'SL & 860'WL OF SUBDIVISION 2, LOT 4 SE.
APP 2000-02-14 Proposed Formations:NEWBURG, Issued Date:2/14/00, Expired Date:2/13/01 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2001-02-21 Proposed Formations:NEWBURG, Issued Date:2/21/01, Expired Date:2/21/02 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2002-02-21 Proposed Formations:NEWBURG, Issued Date:2/21/02, Expired Date:2/21/03 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2003-02-04 Proposed Formations:NEWBURG, Issued Date:2/4/2003, Expired Date:2/4/2004 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2004-01-06 Proposed Formations:NEWBURG, Issued Date:1/6/2004, Expired Date:1/5/2005 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:SWD, Proposed Well Class:
APP 2005-01-31 Proposed Formations:NEWBURG, Issued Date:1/31/2005, Expired Date:1/31/2006 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2006-01-31 Proposed Formations:NEWBURG, Issued Date:1/31/2006, Expired Date:1/31/2007 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2007-02-06 Proposed Formations:NEWBURG, Issued Date:2/6/2007, Expired Date:2/6/2008 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2008-02-25 Proposed Formations:NEWBURG, Issued Date:2/25/2008, Expired Date:2/24/2009 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
Change of Owner 2009-03-27 Operator changed from 5785, M-J OIL COMPANY INC. to 8417, SALTYS DISPOSAL WELLS LP
APP 2009-04-28 Proposed Formations:NEWBURG, Issued Date:4/28/2009, Expired Date:4/28/2010 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:SWD, Proposed Well Class:SWIW
APP 2011-05-16 Proposed Formations:NEWBURG, Issued Date:5/16/2011, Expired Date:5/15/2013 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
Reached Total Depth 2011-07-15 SALTWATER INJECTION WELL
Last Compliance Report 2011-09-06 SALTWATER INJECTION WELL
Completion Report Received 2011-11-14 SALTWATER INJECTION WELL
Record Last Modified 2013-04-24 SALTWATER INJECTION WELL
Construction Permit Expires 2013-05-15 SALTWATER INJECTION WELL

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1106347581 2011-8-15 0:00: PL No Violations
-1326077252 2016-8-30 0:00: SW No Violations
-1339209523 2016-7-20 0:00: SW No Violations
-1348289941 2015-6-17 0:00: SW No Violations
-1437634659 2011-5-5 0:00:0 SW No Violations
-144073413 2018-7-12 0:00: SW No Violations 0.70
-1448411371 2013-8-28 0:00: SW No Violations
-1468100166 2015-2-11 0:00: SW No Violations
-1498416486 2019-12-2 0:00: SW No Violations 0.40
-152025141 2015-1-13 0:00: SW No Violations
-1527078508 2015-10-19 0:00 SW No Violations
-1568861146 2015-4-30 0:00: SW No Violations
-1598300602 2016-12-16 0:00 SW No Violations
-1610910856 2020-5-28 0:00: SW No Violations 1.00
-1632669266 2015-7-10 0:00: SW No Violations
-1658702598 2020-5-19 0:00: SC No Violations 1.00
-1673187628 2019-4-18 0:00: SW No Violations 1.50
-1813845576 2015-7-29 0:00: SW No Violations
-1830251358 2019-8-19 0:00: SW No Violations 0.70
-1837408994 2015-6-4 0:00:0 SW No Violations
-1839915694 2016-8-5 0:00:0 SW No Violations
-1890275695 2011-6-30 0:00: DD No Violations
-1917035548 2013-9-6 0:00:0 SW No Violations
-1985602644 2014-8-1 0:00:0 SW No Violations
-202434906 2020-1-9 0:00:0 SW No Violations 0.60
-2033185772 2020-8-24 0:00: SC No Violations 1.00
-2036686711 2011-9-6 0:00:0 PL No Violations
-2043719330 2020-6-12 0:00: SC No Violations 1.00
-2116093500 2014-3-21 0:00: SW No Violations
-2121333675 2011-7-7 0:00:0 DD No Violations
-234180732 2019-6-24 0:00: SW No Violations 0.50
-25681286 2011-11-30 0:00 PL No Violations
-34600981 2014-9-17 0:00: SW No Violations
-382108655 2014-7-19 0:00: SW No Violations
-405262917 2013-12-30 0:00 SW No Violations
-429783785 2016-5-12 0:00: SW No Violations 0.50
-465405786 2020-5-21 0:00: SC No Violations 2.00
-539210154 2017-3-20 0:00: SW No Violations
-556225741 2018-11-20 0:00 SW No Violations 0.30
-579978672 2011-6-27 0:00: DD No Violations
-65295968 2013-6-7 0:00:0 SW No Violations
-72989771 2013-5-9 0:00:0 SW No Violations
-738688106 2011-8-18 0:00: SW No Violations
-774370381 2017-1-12 0:00: SW No Violations
-787018983 2014-9-5 0:00:0 SW No Violations
-818030944 2013-3-6 0:00:0 BH No Violations
-820369760 2017-5-22 0:00: SW No Violations
-853241136 2011-6-30 0:00: DD No Violations
-907539616 2020-2-13 0:00: SW No Violations
0025681286 2011-11-30 Preliminary Restoration No Violations There was some vegetative growth at the well site. There were no violations at this time.
0034600981 2014-09-17 Salt Water Injection Well No Violations A sample was taken from the facility. The sample, number SJO-118, was taken to the lab for analysis.
0065295968 2013-06-07 Salt Water Injection Well No Violations I inspected the surface facility. There were no violations at the time.
0066035344 2012-02-28 Salt Water Injection Well No Violations This quarterly inspection found no violations at this time.
0072989771 2013-05-09 Salt Water Injection Well No Violations I witnessed a mechanical integrity test on the well.

There was a pressure of 120 psi. on the tubing. The annulus was pressured up to 1040 psi. and shut-in.

There was no pressure loss, during a fifteen minute test period.

0144073413 2018-07-12 Salt Water Injection Well No Violations I found the injection well not operating on the day of my inspection. Identification signs are posted. There is a chain link fence surrounding the well. There is a facility operator on location. I observed no spills or leaks.
0152025141 2015-01-13 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0239394016 2012-06-28 Brine Hauler No Violations DNR Inspector Tom Hill and I took water samples from a brine truck that arrived at the injection facility. The truck (truck number 30695/29921), operated by Stallion Oilfield Construction (Underground Injection Control number 25368), was hauling production water from a well (permit number 033-2-6887) in Clearfield County, Pennsylvania. The samples were sent to the Cambridge laboratory for analysis.
0301552155 2017-10-31 Salt Water Injection Well No Violations I found the UIC facility in good repair on the day of my inspection. There are identification signs posted at the well and facility. There is chain link fencing around the well. While on location, a Stallion Water Truck arrived with the proper UIC number (368) stenciled on the side of the tank. I observed no leaks or spills. There are no violations at this time.
0382108655 2014-07-19 Salt Water Injection Well No Violations There were no violations at the time of inspection.
0390744167 2011-08-08 Completion Testing No Violations I witnessed the pumping of brine into the Newburg formation by Universal. Universal starting pumping at 39.7BPM at 924psi. That increased to 44.7BPM at 1051psi. The amount of brine pumped was 16030 gallons. Average rate was 34.7BPM, average pressure was 909psi. There were no violations at this time.
0391988812 2012-03-06 Salt Water Injection Well No Violations The pumping unit was in operation at the time of my inspection of this well site. No violatons were noted.
0405262917 2013-12-30 Salt Water Injection Well No Violations There were no violations at the time of inspection.
0410949227 2011-06-29 Drill / Deepen / Reopen No Violations I performed a rig inspection on Whipstock rig #1. The drilling depth was 461 with a 17 bit and drilling on fluid. This inspection satisfies 1501:9-9-03. There were no violations at this time.
0413060611 2014-10-23 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0429783785 2016-05-12 Salt Water Injection Well No Violations I conducted a quarterly status check inspection of this active injection well and the associated surface facilities with Inspector John Fleming. The pump was running when we arrived on location and a we witnessed a Stallion employee turn down the RPMs on the injection pump before we could inspect the injection pressure at the wellhead. A gauge on the 5.5 injection tubing indicated an injection pressure of 670psi. A gauge on the annulus between the 8.625 casing and injection tubing indicated a pressure of 300psi. I found no violations at this time.
0539210154 2017-03-20 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations at the time.
0556225741 2018-11-20 Salt Water Injection Well No Violations I found the injection well in operation on the day of my inspection. There was a facility operator on location. There are identification signs posted. I observed no spills or leaks. There were five (5) Stallion brine trucks off-loading on location and had the proper UIC number displayed (#25-368).
0579978672 2011-06-27 Drill / Deepen / Reopen No Violations Whipstock Drilling Rig 1 has moved on location and should spud the well later tonight. The drilling pits are being dug to a depth of approximately eight feet and did not encounter any water which was a stated concern prior to drilling this well. No violations at this time.
0580526653 2016-10-24 Salt Water Injection Well No Violations An inspection of the injection well and surface facility found no violations.
0588546031 2013-05-08 Salt Water Injection Well No Violations My inspection of the well and surface facility found no violations.
0605877528 2015-03-09 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0618485502 2013-04-18 Salt Water Injection Well No Violations The pump was shut off, just prior to the pressure readings. My inspection of the well and injection facility found no violations. The operator was instructed to replace the needle valve on the casing.
0621239432 2017-02-06 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The pump was operating at the time. There were no violations found.
0701884255 2017-01-24 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations at the time.
0717433646 2018-09-07 Salt Water Injection Well No Violations I found the injection not in operation at this time at the time of my inspection. Clear Creek is on location with a vac truck cleaning sand and sludge from two (2) storage tanks in the diked tank battery. I observed no leaks or spills. An identification sign is posted. I spoke with Chuck Wilson, facility manager, on location.
0738688106 2011-08-18 Salt Water Injection Well No Violations The work over rig, Chipco, ran into the hole with the rest of the 5 1/2 casing. Circulated hole with 150 barrels of inhibitor. Set the R4 Halliburton packer in 20,000# tension over the string weight. Universal pressured up the annulus to 900psi. Could not get any higher. Leaks occurred around the wellhead. Shut down. This procedure was redone 4 more times. Could not get pressure higher than 1000psi. Then pressure would bleed down to 840psi and hold. Reset packer 3 more times. From 22,000# tension, 25,000# tension and 27,000# tension. Universal pumped up to 1200 psi. The R4 packer sheered. Will trip out of the hole with the 5 1/2 casing tomorrow. There were no violations at this time.
0763343645 2019-02-06 Salt Water Injection Well No Violations I found the injection well in operation during my inspection. There is a chain link fence surrounding the injection well. Identification signs are posted. I observed no leaks or spills. There was a facility operator on location.
0774370381 2017-01-12 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations at the time.
0787018983 2014-09-05 Salt Water Injection Well No Violations An inspection of the well and injection facility found no violations. The pump was operating at the time.
0818030944 2013-03-06 Brine Hauler No Violations I took a water sample (sample number: SJO-111) from a Stallion truck. The truck was hauling flow-back from Butler County, PA.
0820369760 2017-05-22 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time of inspection.
0853241136 2011-06-30 Drill / Deepen / Reopen No Violations Chris Grimm and myself performed a rig inspection on Whipstock rig #1. The rig crew were running into the hole with 13 3/8 casing. The drilling depth was 619. This inspection satisfies 1501:9-9-03. There were no violations at this time.
0950203516 2011-11-01 Salt Water Injection Well No Violations I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time.
1080917705 2019-5-23 0:00: SW No Violations 0.30
1106347581 2011-08-15 Preliminary Restoration No Violations All the drilling pits are closed. There were no violations at this time.
1170198565 2017-07-12 Salt Water Injection Well No Violations An inspection of the injection well and surface facility found no violations.
1191668745 2017-04-24 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The pump was not operating at the time. Pressure differential between the tubing and annulus indicated mechanical integrity. The tanks and lines had no visible leaks.

There were no violations found at the time.

1192672849 2013-01-24 Administrative Inspection No Violations I was on location with Inspectors Steve Ochs and Kevin Perry to accompany a team from the Ohio Department of Health investigating background radiation levels around active injection wells. The team collected their data and we left the location.
1203629907 2017-06-14 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The pump was operating at the time. There were no violations found.
1224585303 2014-05-13 Salt Water Injection Well No Violations A solvent truck was used to pump up the pressure on the tubing/casing annulus. There was pressure of 765 psi. on the tubing and 1020 psi. of pressure on the annulus. There was no change in pressure during a fifteen minute period.
1312309659 2011-08-02 Preliminary Restoration No Violations Two of the drilling pits are closed. The debris is gone. Whipstock workover rig is over the wellhead. There were no violations at this time.
1313600877 2011-08-17 Salt Water Injection Well No Violations I witnessed the 8 5/8 Halliburton R4 packer getting picked up and ran into the hole. The workover rig, Chipco ran into the hole with 5 1/2, 17.60#, casing following the packer. The workover rig did not get all the casing run. Will finish tomorrow. Shut down for the night.
1326077252 2016-08-30 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The well tender was instructed to remove the water accumulated inside the tank battery dike.
1339209523 2016-07-20 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The pump was off. A Stallion truck was unloading. There were no violations found at the time.
1348160439 2012-09-11 Salt Water Injection Well No Violations My inspection of the well and injection facility found no violations. The pump was operating at the time pressures were recorded.
1348289941 2015-06-17 Salt Water Injection Well No Violations The well and surface facility were inspected. There were no violations found at the time of inspection.
1360024701 2013-01-24 Salt Water Injection Well No Violations My inspection of the injection facility found no violations.
1360029550 2012-12-18 Salt Water Injection Well No Violations My inspection of the injection facility and well found no violations.
1361805832 2013-02-23 Salt Water Injection Well No Violations I was on location with Inspector John Fleming this morning to conduct operator and brine hauler compliance inspections at the request of the Uniontown Field Office. The well was staffed by Grover (Stallion) and we informed him of our purpose for being at the well site. He gave us a tour of the facility and explained the operations of the injection well. The well was not actively injecting at the time of our inspection. The idle pressure on the well was monitored from the pump house and indicated 575 psi on the well. The automatic shut-off on the gauge was well below the maximum allowable pressure of 945 psi. The site was clean and there were no leaks observed on any of the equipment. A Stallion 140 barrel tanker (Ohio license plate #TPT6340) arrived at 10:23am to dispose of a load of water. The UIC number (#386) was properly posted on the side of the tanker and is legally registered to haul brine in the State of Ohio. A check of the manifest indicated that the water being hauled was from Eureka Resources Recycling Facility in Lycoming County, Pennsylvania. The tanker was carrying 113.66 barrels of 9.9 lbs/gallon recycled water and unloaded at the facility. There were no violations at this time.
1363006662 2013-02-23 Salt Water Injection Well No Violations I was on location with Inspector Mike Dinsmore this morning to conduct operator and brine hauler compliance inspection at the request of the Uniontown Field Office. The well was staffed by Grover ( Stallion) and we informed him of our purpose for benign at the well site. He gave us a tour of the facility and explained the operations of the injection well. The well was not injecting at that time. The idle pressure of the well was 575 psi. The site was clean there were no leaks observed on any of the equipment. A Stallion 140 barrel brine tanker (Ohio license plate #PTP6340) arrive on location at 10:23 am. to dispose of a load of water. The UIC number (#386) was posted on the side of the tanker and is legally registered to haul in the state of Ohio. The manifest indicated that the water was from Eureka Resources Recycling Facility in Locoming County, Pennsylvania. The tanker was carrying 133.66 barrels of 9.9lbs/gallon water and unloaded at the facility. There is no violations at this time.
1398310834 2013-10-09 Salt Water Injection Well No Violations There were no violations at the time of inspection.
1399209734 2020-2-13 0:00: SW No Violations 0.50
1414242465 2011-08-24 Salt Water Injection Well No Violations I witnessed the running of the 5 1/2 casing and the new Baker Lok Set packer into the hole. Universal pumped 145 barrels of inhibitor down the casing. The Baker Lok Set packer was set in 20,000# compression at 4030. The annulus was pressured to 1218psi. It lost 8psi in 15 minutes. This well passes UIC test.
1437634659 2011-05-05 Salt Water Injection Well No Violations Saltys has applied to reissue this disposal well permit. The proposed affected area is located due south of the existing tank battery and pump house. The well stake could not be located. West of this area is a likely jurisdictional wetland. Even if the proposed well is out of the wetland, there may be issues with a shallow water table when trying to construct earthen pits to drill the well. The hearest homes are located along SR 183 and are over 500 west of the well.
1448411371 2013-08-28 Salt Water Injection Well Violations Noted A frac tank at the surface facility needs to be emptied and removed.
1448559341 2016-09-16 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The pump was not operating. There were no violations found at the time.
1468100166 2015-02-11 Salt Water Injection Well No Violations A water sample (sample SJO #122) was taken from Stallion truck #30535. The load was from the Calamari Unit #1, Cuyahoga County permit number 2-1880. The sample was sent to the ODNR Laboratory in Cambridge, Ohio.
1473186985 2016-06-14 Salt Water Injection Well No Violations With 535 psi. of pressure on the tubing, the casing was pressured up to 850 psi. and shut-in. Both pressures remained constant for fifteen minutes, indicating mechanical integrity.
1490258739 2014-11-20 Brine Hauler No Violations PERFORMED FIELD AUDIT ON BRINE TRUCKS. WITNESSED 3 STALLION TRUCKS (UIC # 25-368), ALL LABELED PROPERLY AND APPROVED TO DISPOSE AT THIS SITE. NO TRUCK VIOLATIONS FOUND.
1502800378 2011-07-11 Salt Water Injection Well No Violations Whipstock Drilling Rig 1 should TD this portion of the hole later today. The 8-5/8 production casing will be run at that time. The pits are fenced, lined and in good condition. No violations at this time.
1513261145 2017-12-14 Salt Water Injection Well No Violations I found the injection and facility in good repair on the day of my inspection. There is a facility operator on location. I observed no leaks or spills. An identification sign is posted at the facility, well, and access road entrance. There are no violations at this time.
1527078508 2015-10-19 Salt Water Injection Well No Violations An inspection of the injection well and surface facility found no violations.
1532090445 2018-07-20 Salt Water Injection Well No Violations I found the injection well operating on the day of my inspection. The chain link fence surrounding the well. Identification sign is posted. I observed no leaks or spills. There was a facility operator on location.
1567171293 2019-8-30 0:00: SW No Violations
1568861146 2015-04-30 Salt Water Injection Well No Violations The well and surface facility were inspected. There were no violations found at the time of inspection.
1588095487 2020-4-28 0:00: SC No Violations 1.10
1588700424 2020-5-5 0:00:0 SC No Violations
1593183116 2020-6-26 0:00: SC No Violations 2.40
1594380199 2020-6-1 0:00:0 SC No Violations 1.80
1594386879 2020-7-10 0:00: SW No Violations 1.00
1596116031 2015-09-28 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
1597154076 2020-8-11 0:00: SC No Violations 1.80
1598300602 2016-12-16 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The annular pressure was not gauged. There were no violations at the time.
1598339036 2011-07-27 Completion Testing No Violations Universal rigged up. Unversal pumped 284 barrels of fresh water down the tubing to clean the hole of any mud materials. They then pumped 3000 gallons of 28% HCL down to the open hole, 4095-4356. Let the acid set for 30 minutes. Started pumping at a rate of 1BPM at 744psi. The pressure fell to 653 after pumping 30 barrels into the formation. 1.5BPM, 734psi, 36barrels pumped. 1.5BPM, 708psi, 39 barrels pumped. Rate went to 2BPM at 661psi at 746psi, 50 barrels pumped. There were no violations at this time.
1617953290 2018-02-12 Salt Water Injection Well No Violations I was on location to inspect the UIC well and facility. I found the well operating on the day of my inspection. I found no spills or leaks. The proper identification signs are posted at the facility and well. There was a Stallion brine truck on location with the proper UIC number displayed (#25-368). There are no violations at this time.
1632669266 2015-07-10 Salt Water Injection Well No Violations The well and surface facility were inspected. There were no violations found at the time of inspection.
1689144764 2014-06-19 Salt Water Injection Well No Violations No violations were found at the time of inspection.
1692648924 2018-05-15 Salt Water Injection Well Violations Noted
1759610866 2016-03-01 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
1779972247 2016-08-18 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
1780544931 2014-04-17 Salt Water Injection Well No Violations The gauge, installed on the casing, would not break lose. So, the annular pressure reading was taken from that gauge. The well tender was instructed to remove the gauge. There were no other issues found.
1813845576 2015-07-29 Salt Water Injection Well No Violations The well and surface facility were inspected. There were no violations found at the time of inspection.
181993005 2020-6-29 0:00: SC No Violations 0.90
1837408994 2015-06-04 Salt Water Injection Well No Violations A mechanical integrity test (MIT) was performed on the well. The tubing-casing annulus was pressurized. Several fittings on the casing were lose, causing the test to fail. A company representative was instructed to tighten the fittings and install a working valve and gauge on the casing.
1839915694 2016-08-05 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
1856264624 2020-2-7 0:00:0 SW No Violations
1879667921 2011-07-05 Drill / Deepen / Reopen No Violations I performed a rig inspection on Whipstock rig #1. The rig was drilling through the cement from the surface casing. The BOP was tested to 550psi and lost 5psi in 15 minutes. I did not witness the BOP test. The drilling depth was 619 and drilling with a 12 1/4 bit on air. This inspection satisfies 1501:9-9-03. There were no violations at this time.
1883177160 2018-06-27 Salt Water Injection Well No Violations I found the injection well operating on the day of my inspection. The fencing around the well has been repaired. The fittings have been replaced. There is an identification sign posted. I observed no spills or leaks.
1890275695 2011-06-30 Drill / Deepen / Reopen No Violations Chris Grimm and myself witnessed the cementing of the 13 3/8 casing by Universal Well Service. This cementing was performed on Whipstock rig #1. There were no violations at this time.
1917035548 2013-09-06 Salt Water Injection Well No Violations The frac tank was removed from the injection facility.
1985602644 2014-08-01 Salt Water Injection Well No Violations There were no violations at the time of inspection.
2033505912 2013-06-17 Salt Water Injection Well No Violations My inspection of the well and surface facility found no violations.
2036686711 2011-09-06 Preliminary Restoration No Violations The top soil has been spread around the drilling location. The debris is gone. There were no violations at this time.
2116093500 2014-03-21 Salt Water Injection Well No Violations There were no violations at the time of inspection.
2121333675 2011-07-07 Drill / Deepen / Reopen No Violations I performed a rig inspection on Whipstock rig 1. The rig crew were starting to take a survey. The drilling depth was 2586 and drilling a 12 1/4 hole on air in the Ohio Shale. This inspection satisfies 1501:9-9-03. There were no violations at this time.
239394016 2012-6-28 0:00: BH No Violations
301552155 2017-10-31 0:00 SW No Violations 0.30
390744167 2011-8-8 0:00:0 CT No Violations
391988812 2012-3-6 0:00:0 SW No Violations
410949227 2011-6-29 0:00: DD No Violations
413060611 2014-10-23 0:00 SW No Violations
580526653 2016-10-24 0:00 SW No Violations
588546031 2013-5-8 0:00:0 SW No Violations
605877528 2015-3-9 0:00:0 SW No Violations
618485502 2013-4-18 0:00: SW No Violations
621239432 2017-2-6 0:00:0 SW No Violations
632345854 2020-4-6 0:00:0 SW No Violations 0.50
66035344 2012-2-28 0:00: SW No Violations
701884255 2017-1-24 0:00: SW No Violations
717433646 2018-9-7 0:00:0 SW No Violations 0.40
721456009 2020-4-13 0:00: SW No Violations 0.40
763284213 2020-9-14 0:00: SW No Violations 1.00
763343645 2019-2-6 0:00:0 SW No Violations 0.40
950203516 2011-11-1 0:00: SW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1448411371 US-OH-113030 2013-10-03 Operating withour a permit
1692648924 US-OH-116782 2018-07-17 9-3-05(A)3 Violation of injection tubing/fitting requirements

For data sources see[4]

References