If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24262 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.04,"lon":-81.13,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Atwater Township | |
| Operator Name: PIN OAK ENERGY PARTNERS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: HARDWAY UNIT | |
| License Status: Producing | |
| License Date: 2001-07-31 | |
| Spud Date: 2001-09-26 | |
| Spud Drilling Contractor: PEP DRLG | |
| Final Drill Date: 2001-10-01 | |
| Well Total Depth: 4870.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.040000 | |
| Longitude: -81.130000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2001-07-31 | 2050 ORION PETRO CORP Proposed Formation CLINTON Issued Date 7/31/01 Expired Date 7/31/02 6:00:00 AM |
| Original Spud | 2001-09-26 | RBDMS Rec |
| Completed | 2001-10-01 | RBDMS Rec |
| Reached Total Depth | 2001-10-01 | RBDMS Rec |
| Completion Report Received | 2001-11-26 | RBDMS Rec |
| Construction Permit Expires | 2002-07-31 | RBDMS Rec |
| Change of Owner | 2016-10-07 | Operator changed from 2050, ORION PETRO CORP to 9722, PIN OAK ENERGY PARTNERS LLC |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2002-01-18 | 4702 | 4758 | 42 |
| 4702 | 4758 | 42 | |
| 4702 | 4758 | 42 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 56000 Gal | 20000 | 500 GALLONS HCL ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | ORION PETRO CORP | 0.00 | 819.00 | 68 |
| 2002 | ORION PETRO CORP | 6433.00 | 2179.00 | 365 |
| 2003 | ORION PETRO CORP | 3785.00 | 1256.00 | 365 |
| 2004 | ORION PETRO CORP | 3188.00 | 937.00 | 365 |
| 2005 | ORION PETRO CORP | 2505.00 | 814.00 | 365 |
| 2006 | ORION PETRO CORP | 2513.00 | 686.00 | 365 |
| 2007 | ORION PETRO CORP | 2501.00 | 595.00 | 365 |
| 2008 | ORION PETRO CORP | 2266.00 | 529.00 | 365 |
| 2009 | ORION PETRO CORP | 1877.00 | 503.00 | 365 |
| 2010 | ORION PETRO CORP | 2115.00 | 416.00 | 0 |
| 2011 | ORION PETRO CORP | 1826.00 | 435.00 | 0 |
| 2012 | ORION PETRO CORP | 2176.00 | 352.00 | 366 |
| 2014 | ORION PETRO CORP | 1526.00 | 344.00 | 365 |
| 2015 | ORION PETRO CORP | 1453.00 | 276.00 | 365 |
| 2016 | ORION PETRO CORP | 1070.00 | 238.00 | 273 |
| 2017 | PIN OAK ENERGY PARTNERS LLC | 1398.00 | 224.00 | 365 |
| 2018 | PIN OAK ENERGY PARTNERS LLC | 1230.00 | 127.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | ORION PETRO CORP | Brine | 2785 | 68 |
| 2002 | ORION PETRO CORP | Brine | 665 | 365 |
| 2003 | ORION PETRO CORP | Brine | 245 | 365 |
| 2004 | ORION PETRO CORP | Brine | 165 | 365 |
| 2005 | ORION PETRO CORP | Brine | 111 | 365 |
| 2006 | ORION PETRO CORP | Brine | 172 | 365 |
| 2007 | ORION PETRO CORP | Brine | 112 | 365 |
| 2008 | ORION PETRO CORP | Brine | 120 | 365 |
| 2009 | ORION PETRO CORP | Brine | 70 | 365 |
| 2010 | ORION PETRO CORP | Brine | 85 | 0 |
| 2011 | ORION PETRO CORP | Brine | 90 | |
| 2012 | ORION PETRO CORP | Brine | 37 | 366 |
| 2014 | ORION PETRO CORP | Brine | 40 | 365 |
| 2015 | ORION PETRO CORP | Brine | 65 | 365 |
| 2016 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
| 2017 | PIN OAK ENERGY PARTNERS LLC | Brine | 90 | 365 |
| 2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 18 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0001216i44 | 2001-10-10 | Production Wells | No Violations | No violations. Working on pit closure at this time. |
| 1216i44 | 2001-10-10 0:00 | PW | No Violations | 0.50 |
| 1582830911 | 2018-02-09 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 rods and tubing and operating with the aid of a natural gas powered pumping unit. This well produces to a diked tank battery to the northwest and is shared with the Drakulich #2 (PN#24263). The battery contains two (2) 210 barrel tanks, two (2) 50 barrel tanks, and two (2) horizontal separators. A chart at the separator indicates a differential production pressure of 50psi. The required ID is posted at the tank battery. No violations. |
For data sources see[9]