If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24399 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.31,"lon":-81.16,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Hiram Township | |
| Operator Name: CEDAR VALLEY ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: MEEKER UNIT | |
| License Status: Producing | |
| License Date: 2010-10-12 | |
| Spud Date: 2010-11-01 | |
| Spud Drilling Contractor: POULSON DRILLING | |
| Final Drill Date: 2010-11-05 | |
| Well Total Depth: 1240.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.310000 | |
| Longitude: -81.160000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2010-10-12 | Proposed Formations:CLINTON, Issued Date:10/12/2010, Expired Date:10/11/2012 12:00:00 PM, Drilling unit acres:83.704, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2010-11-05 | |
| Completion Report Received | 2011-01-11 | |
| Construction Permit Expires | 2012-10-11 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2011-05-09 | 4249 | 4297 | 22 |
| 4249 | 4297 | 22 | |
| 4249 | 4297 | 22 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2010-11-18 | H2O | 15 | 92000 Gal | 60000 | Universal Well Services Inc. |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | CEDAR VALLEY ENERGY INC | 0.00 | 0.00 | 0 |
| 2012 | CEDAR VALLEY ENERGY INC | 988.00 | 82.00 | 327 |
| 2013 | CEDAR VALLEY ENERGY INC | 6752.00 | 174.00 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | 7477.00 | 118.00 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | 7091.00 | 160.00 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | 5409.00 | 93.00 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | 4868.00 | 138.00 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | 1241.00 | 23.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2011 | CEDAR VALLEY ENERGY INC | Brine | 132 | 0 |
| 2012 | CEDAR VALLEY ENERGY INC | Brine | 3475 | 327 |
| 2013 | CEDAR VALLEY ENERGY INC | Brine | 3079 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | Brine | 2387 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | Brine | 2123 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | Brine | 2017 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | Brine | 1892 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | Brine | 474 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -255893122 | 2010-11-1 0:00: | DD | No Violations | |
| -87358435 | 2011-9-27 0:00: | PL | No Violations | |
| 0087358435 | 2011-09-27 | Preliminary Restoration | No Violations | Preliminary Restoration is approved. |
| 0255893122 | 2010-11-01 | Drill / Deepen / Reopen | No Violations | Poulson Drilling moved on location this morning and spudded the well this afternoon. The drilling pits are lined and in good condition. This is not an urban location. No violations at this time. |
| 1290390264 | 2010-11-04 | Drill / Deepen / Reopen | No Violations | Poulson is drilling ahead with air/soap. The pits are lined and in good condition. |
| 1579104787 | 2020-1-15 0:00: | PW | No Violations | 0.80 |
| 1779834597 | 2015-05-20 | Production Wells | No Violations | Follow-up to Complaint #5034. I was on location with Supervisor Tom Hill who responded to this complaint on 5/18/15. Tim Cosma (Cedar Valley) was on location overseeing the contractors as they stripped and steamed the tank battery where a drip line had leaked. We walked the scald trail to the northwest for 200 yards where it stopped at a drainage catchment basin that had an overflow into a pond. No oil sheen was found in the catchment or at the pond and tadpoles in the catchment were unaffected by whatever had caused the scalding of the grass to the southeast. We investigated the leach beds on the affected property and found a discharge line from the house or leach beds at the origin of the scalding. Hydrogeologist Kyle Tharp has been referred to collect samples and determine if the scalding is oilfield impact or possibly water softener discharge. The area between the tank battery and the affected grass is not visibly impacted. I will wait on test results to make a final determination. |
| 2109425781 | 2011-01-19 | Drill / Deepen / Reopen | No Violations | The well has been drilled and completed with a pump jack. The well is connected to the tank battery located near SR 82. Cedar Valley is pumping the well to determine the economic viability of the well. The ID posted during the drilling phase is still at the lease road entrance. |
For data sources see[9]