If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-151-25811 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8,"lon":-81.11,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Stark | |
| Municipality: Paris Township | |
| Operator Name: ENERVEST OPERATING LLC | |
| Well Pad ID: | |
| Farm/Lease Name: TOMLINSON | |
| License Status: Producing | |
| License Date: 2012-08-10 | |
| Spud Date: 2012-10-01 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2012-10-09 | |
| Well Total Depth: 5487.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.800000 | |
| Longitude: -81.110000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-08-10 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:8/10/2012, Expired Date:8/10/2014 12:00:00 PM, Drilling unit acres:99.164, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2012-10-01 | |
| Reached Total Depth | 2012-10-09 | |
| Completion Report Received | 2013-01-09 | |
| Construction Permit Expires | 2014-08-10 | |
| Record Last Modified | 2017-10-23 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-01-11 | 5260 | 5347 | 72 |
| 5260 | 5347 | 72 | |
| 5260 | 5347 | 72 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-10-18 | H2O | 0 | 4133 Bbl | 0 | Superior Well Services | NABORS |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | ENERVEST OPERATING LLC | 0.00 | 723.00 | 366 |
| 2013 | ENERVEST OPERATING LLC | 3697.00 | 3271.00 | 304 |
| 2014 | ENERVEST OPERATING LLC | 1552.00 | 1336.00 | 365 |
| 2015 | ENERVEST OPERATING LLC | 1000.00 | 1156.00 | 365 |
| 2016 | ENERVEST OPERATING LLC | 0.00 | 843.00 | 366 |
| 2017 | ENERVEST OPERATING LLC | 510.00 | 480.00 | 365 |
| 2018 | ENERVEST OPERATING LLC | 1092.00 | 543.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | ENERVEST OPERATING LLC | Brine | 0 | 366 |
| 2013 | ENERVEST OPERATING LLC | Brine | 1626 | 304 |
| 2014 | ENERVEST OPERATING LLC | Brine | 748 | 365 |
| 2015 | ENERVEST OPERATING LLC | Brine | 525 | 365 |
| 2016 | ENERVEST OPERATING LLC | Brine | 430 | 366 |
| 2017 | ENERVEST OPERATING LLC | Brine | 118 | 365 |
| 2018 | ENERVEST OPERATING LLC | Brine | 75 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0311318532 | 2012-10-02 | Drill / Deepen / Reopen | No Violations | I inspected the drilling operations at the Tomlinson 2 (34151258110000) site on October 2, 2012 to cement conductor casing. The drilling contractor for this well is Kilbarger Drilling Inc., rig number 17. The access road is in good condition and graveled to the well site. The silt fence along the unnamed stream to the east and south of the site is intact and in good condition. The working pit and blow pit are located to the north of the wellhead; soil berms are being utilized to mitigate erosion. There is four feet of free board in the working pit. The blow pit has been dug but has not been lined yet. The pits do not have safety fencing due to the non- |
| 0320409781 | 2012-10-04 | Drill / Deepen / Reopen | No Violations | I inspected the drilling operations at the Tomlinson 2 (34151258110000) site on October 4, 2012 to cement surface casing. The drilling contractor for this well is Kilbarger Drilling Inc., rig number 17. The access road is in good condition and graveled to the well site. The silt fence along the unnamed stream to the east and south of the site is intact and in good condition. The working pit and blow pit are located to the north of the wellhead; soil berms are being utilized to mitigate erosion. There is four feet of free board in the working pit and eight feet of free board in the blow pit. The pits do not have safety fencing due to the non- |
| 1152028114 | 2012-10-10 | Drill / Deepen / Reopen | No Violations | I inspected the drilling operations at the Tomlinson 2 (34151258110000) site on October 10, 2012 to cement production casing. The drilling contractor for this well is Kilbarger Drilling Inc., rig number 17. The access road is in good condition and graveled to the well site. The silt fence along the unnamed stream to the east and south of the site is intact and in good condition. The working pit and blow pit are located to the north of the wellhead; soil berms are being utilized to mitigate erosion. There is four feet of free board in both the working pit and the blow pit. The pits do not have safety fencing due to the non- |
| 1348587884 | 2012-09-25 | Drill / Deepen / Reopen | No Violations | I inspected the Tomlinson 2 (34151258110000) site on September 25, 2012. Joes Excavating is spreading gravel for the drill rig and digging the pits. The operator, Kilbarger rig #17, will move onto the site this week. The access road is in good condition, new gravel installed. |
| 1674140971 | 2012-11-05 | Preliminary Restoration | No Violations | I inspected the Tomlinson 2 (34151258110000) well site on November 5, 2012. My inspection found the access road graveled to the wellhead and shows no signs of erosion. The drilling pits have been filled and the site has been rough graded. Preliminary restoratio is due by April 2013. There is a pumping unit at the site. |
| 311318532 | 2012-10-2 0:00: | DD | No Violations | 3.00 |
| 320409781 | 2012-10-4 0:00: | DD | No Violations | 4.00 |
For data sources see[9]