If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-151-25829 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8,"lon":-81.16,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Stark | |
| Municipality: Paris Township | |
| Operator Name: C & T ENERGY OF EAST CANTON IN | |
| Well Pad ID: | |
| Farm/Lease Name: SNYDER | |
| License Status: Producing | |
| License Date: 2013-04-29 | |
| Spud Date: 2013-05-17 | |
| Spud Drilling Contractor: ADVENT DRLG | |
| Final Drill Date: 2013-06-03 | |
| Well Total Depth: 5440.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.800000 | |
| Longitude: -81.160000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2013-04-29 | Proposed Formations:CLINTON SANDSTONE, Issued Date:4/29/2013, Expired Date:4/29/2015 12:00:00 PM, Drilling unit acres:51.57, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2013-06-03 | |
| Completion Report Received | 2013-07-08 | |
| Construction Permit Expires | 2015-04-29 | |
| Record Last Modified | 2018-03-22 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-08-14 | 5233 | 5327 | 62 |
| 5233 | 5327 | 62 | |
| 5233 | 5327 | 62 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2013-06-10 | H2O | 8 | 115881 Gal | 50000 | Superior Well Services |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | C & T ENERGY OF EAST CANTON IN | 1418.00 | 1789.00 | 184 |
| 2014 | C & T ENERGY OF EAST CANTON IN | 1299.00 | 1630.00 | 365 |
| 2015 | C & T ENERGY OF EAST CANTON IN | 997.00 | 1201.00 | 365 |
| 2016 | C & T ENERGY OF EAST CANTON IN | 1233.00 | 850.00 | 365 |
| 2017 | C & T ENERGY OF EAST CANTON IN | 526.00 | 841.00 | 365 |
| 2018 | C & T ENERGY OF EAST CANTON IN | 783.00 | 852.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | C & T ENERGY OF EAST CANTON IN | Brine | 4644 | 184 |
| 2014 | C & T ENERGY OF EAST CANTON IN | Brine | 900 | 365 |
| 2015 | C & T ENERGY OF EAST CANTON IN | Brine | 470 | 365 |
| 2016 | C & T ENERGY OF EAST CANTON IN | Brine | 370 | 365 |
| 2017 | C & T ENERGY OF EAST CANTON IN | Brine | 295 | 365 |
| 2018 | C & T ENERGY OF EAST CANTON IN | Brine | 225 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 1050957916 | 2013-10-28 | Preliminary Restoration | No Violations | The well has a good lease road, proper signage and a pumpjack on it. The tank battery consist of a 100 barrel production tank, a plastic brine tank, a horizontal separator and is contained by a good dike. The tank battery has been recently painted as well. There are no violations at this time and preliminary restoration can be passed at this time. |
| 1530548198 | 2018-04-19 | Production Wells | No Violations | I did a status check inspection for this well. The well is equipped with a pumpjack. The tank battery consists of a steel production tank, a plastic brine tank, a vertical separator and a meter. The well is legibly identified. No compliance issues are cited at this time. |
For data sources see[9]