X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22928

Well Details

Well ID: 34-153-22928
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Bath Township
Operator Name: TRANSCONTINENTAL OIL & GAS INC
Well Pad ID:
Farm/Lease Name: O'NEILL
License Status: Final Restoration
License Date: 2017-11-21
Spud Date: 2003-09-10
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2003-10-06
Well Total Depth: 3853.00 ft
Configuration: Directional
Latitude: 41.160000
Longitude: -81.620000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2003-03-31 4744 TRANSCONTINENTAL O & G Proposed Formation CLINTON Issued Date 3/31/2003 Expired Date 3/30/2004 6:00:00 AM
Inspector Comments Cement Job 2003-09-10 Capstar Drilling Rig #1 was the drilling contractor. Trouble getting casing past the bedrock/drift contact at 283'. After three tries, ran 10 joints of new, R-3, 20#, 8-5/8" surface casing (430) set at 440'. Origingal hole drilled to 495' with an 11" bit then reamed to 300'+ with a 12.25" bit. Cemented with 300 sacks of class A with 3% calcium chloride. Good circulation with cement to surface. Plug down at 18:02.Cement Ticket Notes Inspector Reporting WORSTALL BOB
Original Spud 2003-09-10

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

Completed 2003-10-06

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

Reached Total Depth 2003-10-06

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

Completion Report Received 2004-02-02

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

APP 2004-02-12 Proposed Formations:CLINTON, Issued Date:2/12/2004, Expired Date:2/11/2005 6:00:00 AM, Drilling unit acres:66.023, Proposed Well Type:OG, Proposed Well Class:POOL
Plugged Back 2004-04-28

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

APP 2012-06-13 Proposed Formations:CLINTON, Issued Date:6/13/2012, Expired Date:6/13/2014 12:00:00 PM, Drilling unit acres:66.023, Proposed Well Type:EOR, Proposed Well Class:ERP
Last Compliance Report 2012-06-13

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

APP 2017-11-21 Proposed Formations:CLINTON, Issued Date:11/21/2017, Expired Date:11/21/2019 12:00:00 PM, Drilling unit acres:66.023, Proposed Well Type:EOR, Proposed Well Class:
Record Last Modified 2018-07-09

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

Construction Permit Expires 2019-11-21

- PERMITTED FOR ENHANCED RECOVERY INJECTION ON JUNE 13, 2012. UPDATE LOCATION PER DOGRM SURVEYOR COORDINATES.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2004-04-09 3638 3692 33
3638 3692 33
3638 3692 33

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 110000 Gal 60000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2004 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 180
2005 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 0
2006 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 30
2007 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 0
2008 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 365
2009 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 365
2010 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 0
2011 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 365
2017 TRANSCONTINENTAL OIL & GAS INC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2004 TRANSCONTINENTAL OIL & GAS INC Brine 6348 180
2005 TRANSCONTINENTAL OIL & GAS INC Brine 6122 0
2006 TRANSCONTINENTAL OIL & GAS INC Brine 242 30
2007 TRANSCONTINENTAL OIL & GAS INC Brine 0 0
2008 TRANSCONTINENTAL OIL & GAS INC Brine 0 365
2009 TRANSCONTINENTAL OIL & GAS INC Brine 0 365
2010 TRANSCONTINENTAL OIL & GAS INC Brine 950 0
2011 TRANSCONTINENTAL OIL & GAS INC Brine 0 365
2017 TRANSCONTINENTAL OIL & GAS INC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1052333557 2004-11-22 0:00 PW No Violations
-1143926369 2015-8-17 0:00: ER No Violations
-1245622556 2014-3-28 0:00: ER No Violations
-1350161065 2019-9-30 0:00: FR No Violations 1.00
-1402597568 2010-10-19 0:00 UP No Violations
-1491550716 2015-3-31 0:00: ER No Violations
-1745644667 2019-7-29 0:00: ER No Violations 2.50
-1975350587 2014-9-30 0:00: ER No Violations
-31820068 2003-9-10 0:00: DD No Violations
-419278130 2004-5-14 0:00: DD No Violations
-699109025 2017-6-30 0:00: SW No Violations 0.70
-77114233 2019-9-23 0:00: PB No Violations 1.20
-819378006 2005-4-6 0:00:0 PW No Violations
-892546850 2019-2-14 0:00: ER No Violations 0.80
-975493700 2019-9-24 0:00: PB No Violations 11.10
-976994463 2005-6-20 0:00: PW No Violations
0031820068 2003-09-10 Drill / Deepen / Reopen No Violations Capstar Drilling Rig #1 has moved onto the location and will begin drilling later in the day. The pits have been dug and lined and are in good condition.
0051737922 2014-05-07 Enhanced Recovery Project No Violations The well was found shut-in and disconnected. There was no progress on the surface facility construction.
0345330543 2016-03-15 Enhanced Recovery Project No Violations The well was found shut-in and disconnected. The surface facility construction was never started.
0419278130 2004-05-14 Drill / Deepen / Reopen No Violations The drilling has been completed and the rig was moving off location. The blow pit was within several inches of capacity. I contacted Cal Marks who indicated that S&H would begin removing water from this pit later today.
0494108488 2017-03-29 Enhanced Recovery Project No Violations The well was shut-in. The fence, around the well, was secure. No attempt has been made to operate the well.
0571084120 2016-08-19 Enhanced Recovery Project No Violations No action has been taken to construct the surface facility and operate the injection well. Photos were taken.
0699109025 2017-06-30 Salt Water Injection Well No Violations I conducted a status check inspection on this well with Steve Ochs (District Supervisor). The well is not being used for saltwater injection. The facility for saltwater injection has not been built.
0796783192 2018-07-06 Enhanced Recovery Project No Violations I found no evidence of recent activity. The well is still shut-in with a closed gate valve and surrounded by a chain link fence. There is no UIC facility associated with the well. An identification sign is posted on the fence. A plugging permit was issued on 11/21/2017. I spoke with Calvin Marks concerning a timeframe to plug the well. Mr. Marks is projecting late 2018 and into 2019. He stated he is also waiting on a service rig.
0819378006 2005-04-06 Production Wells No Violations Neither issue has been resolved. The site still needs to be recalimed and the two 210 bbl tanks need to be disconnected from each other at the top.
0826419836 2016-12-01 Enhanced Recovery Project No Violations The well was shut-in. There was nothing else onsite. There was no indication of recent activity.
0976994463 2005-06-20 Production Wells No Violations The site has been graded, seeded and mulched. The tank plumbing issue has not changed but apparently is being allowed by Columbus.
1052333557 2004-11-22 Production Wells No Violations Grading and seeding still needs to completed for preliminary restoration approval.
1064237044 2003-09-17 Drill / Deepen / Reopen No Violations Rig still on site. Should reach TD later in the day and moving the next. Pits lined and in good condition. No violations at this time.
1064839466 2003-09-23 Drill / Deepen / Reopen No Violations Status check inspection - rig gone, frac tanks being moved in and pits are being pumped. No violations at this time.
1071068984 2003-12-03 Preliminary Restoration No Violations Status check inspection for preliminary restoration. The pits have been closed, the site has been rough graded and the road has been stoned. Finish grade and seeding will occur as weather permits. The company has until June 2004 to complete PR.
1084797724 2004-05-12 Drill / Deepen / Reopen No Violations Status check inspection - drilling, pits lined, no violations at this time.
1099327089 2004-10-26 Production Wells No Violations Status check inspection. The site needs to be finished graded and seeded for preliminary restoration approval.
1109625078 2005-02-28 Preliminary Restoration Violations Noted There are two issues at this site. 1) Capstar drilling moved in to plug back and redrill this well on April 27, 2004. The drilling pits were closed in the alloted time but the finish grading and seeding has not been completed. The nine month time period expired on January 27, 2005. 2) The two 210 bbl tanks are plumbed together at the top making both tanks production tanks. If they are to remain plumbed together this way, then the separators must be moved 10 feet away. If one 210 is to contain brine only, as the tanks are labeled, the top connection between the tanks must be removed.
1143926369 2015-08-17 Enhanced Recovery Project No Violations The well was converted from production to injection. However, no action has been taken to construct the surface facility. Photographs were taken.
1197048902 2013-09-06 Enhanced Recovery Project No Violations The well remains disconnected. A surface facility has yet to be constructed.
1208722735 2019-7-12 0:00: ER No Violations 0.90
1218486876 2004-05-03 Drill / Deepen / Reopen No Violations Status check inspection - Capstar Drilling is moving onto the location to redrill the well directionally. No violaitons at this time.
1245622556 2014-03-28 Enhanced Recovery Project No Violations The well was shut-in and disconnected. No work has been done on the surface facility construction.
1259939181 2009-12-02 Production Wells No Violations The well has produced nothing but brine since it was initially completed, plugged back, redrilled, and recompleted. The pump jack and rods that were on the well have been removed. If the well is not capable of production, it must be plugged and abandoned.
1288095007 2010-10-18 UrbanProduction Wells No Violations Transcontinental requested and received permission to conduct an injection test to determine if the well can successfully be converted into a saltwater disposal well. The test zone is the Clinton sand using the original perforations. The well is equipped with 2-3/8 tubing inside the 4-1/2 production casing. Producers Services was on site to perform the test. The maximum permitted test pressure is 840 psi. After pumping brine for 90 minutes at a rate of approximately 2.5 bpm with a maximum pressure of 200 psi (friction), Transcontinental decided to cancel the pump test and instead conduct a gravity test since the well was on vacuum. Producers was released and the frac tanks containing brine were plumbed into the wellhead. The test will be concluded on 10/20 or when the 1500 bbl brine is used.
1372863043 2013-05-29 Enhanced Recovery Project No Violations Bob Roush and I witnessed the packer installation.
1402597568 2010-10-19 UrbanProduction Wells No Violations Transcontinental is on the second 24 hours of a 48 hour gravity fed salt water disposal test requested and approved for this Clinton well. Results will be reported tomorrow.
1491550716 2015-03-31 Enhanced Recovery Project No Violations There are no changes on location since last inspection. The well remains shut-in and disconnected. Surface facility construction has not started.
1506350136 2017-09-25 Enhanced Recovery Project No Violations A permit was issued, by DOGRM, to convert the ONeil # 3-D Clinton sand production well to an Enhanced Recovery Project on 6/13/2012. On 5/29/2013, a Baker packer was installed on the 2.375 injection tubing and Petroset Cementing Services circulated a packer fluid containing an oxygen scavenger, rust inhibitor and biocide. After successfully completing a Mechanical Integrity test the well was shut in awaiting further conversion completion. My inspection ( 9/25/2017) indicated that the ONeil # 3-D well was incomplete and incapable of injection for Enhance Recovery. The wellhead consisted of 4.5 casing with 2.375 injection tubing inside. The injection tubing was capped with a Demco gate valve ( in the closed position ) and a gauge that did not indicate any pressure. The annular ( 4.5 X 2.375 ) ports had two (2) closed wing valves. The wellhead was surrounded with a chain link fence and overgrown vegetation. I did not identify any leaks at the wellhead. The I D signage was posted and legible. The wellhead was not connected to any injection lines. The ONeil # 3-D did not have any injection pumping or storage tank facilities. The OAC 1501:9-5-05-(I)(1) states If drilling or conversion operations have started but are not complete within the twelve month period, operations shall continue with due diligence or the permit shall expire. The permit issued on 6/13/2012 for conversion has expired. The Well Owner/ Operator of Permit 34-153-2-2928, within 14 days, shall submit to the Division of Oil and Gas Resource Management at 3575 Forest Lake Drive, Suite 150, Uniontown, Ohio, 44685 a plan detailing the future utilization of the well along with a time frame of said utilization plan. If you have any questions contact Bob Roush at 330.690.8837.
1510759888 2017-11-15 Enhanced Recovery Project No Violations I was on location to inspect the injection well. The injection well is not in operation. There is no UIC facility associated with the injection well. There is a chain link fence around the well. There is an identification sign posted. There are no violations at this time
1519672925 2018-02-26 Enhanced Recovery Project No Violations I was on location to inspect the UIC well. I found the injection well shut-in with a closed gate valve on the tubing on the day of my inspection. The wellhead tubing is disconnected from the 2 injection line and capped with a 2 plug. There is a chain link fence with an identification sign around the wellhead. There is no facility associated with the injection well. The RBDMS database shows a plugging permit was issued on 11/21/2017. There are no violations at this time.
1544193044 2018-12-07 Enhanced Recovery Project No Violations I found no evidence of recent activity. The well is shut-in with a closed gate valve on the tubing. The injection well is surrounded by a chain link fence with an identification sign. There is no facility associated with the injection well. I observed no leaks or spills. A plugging permit was issued on November 21, 2017.
1557408178 2019-5-9 0:00:0 ER No Violations 1.60
1569420628 2019-9-25 0:00: PB No Violations 1.00
1569509153 2019-9-26 0:00: PB No Violations 4.20
1571494898 2013-03-08 Enhanced Recovery Project No Violations The well was fenced in and disconnected. No attempts have been made to convert the well to enhanced recovery.
1871735845 2003-09-12 Drill / Deepen / Reopen No Violations Drilling out from under surface later in the day. No violations at this time.
1975350587 2014-09-30 Enhanced Recovery Project No Violations Injection has not commenced. No action has been taken to construct the surface facility. The well remains shut-in and disconnected.
345330543 2016-3-15 0:00: ER No Violations
494108488 2017-3-29 0:00: ER No Violations
51737922 2014-5-7 0:00:0 ER No Violations
571084120 2016-8-19 0:00: ER No Violations
796783192 2018-7-6 0:00:0 ER No Violations 0.70
826419836 2016-12-1 0:00: ER No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1109625078 US-OH-102711 2005-02-28 Failure to restore land surface within 9 mos. (CHANGE) (REPLACE)

For data sources see[9]

References