X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-21389

Well Details

Well ID: 34-155-21389
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Brookfield Township
Operator Name: D & L ENERGY INC
Well Pad ID:
Farm/Lease Name: HUBISH A
License Status: Final Restoration
License Date: 2013-05-10
Spud Date: 1981-05-26
Spud Drilling Contractor:
Final Drill Date: 1981-06-03
Well Total Depth: 5134.00 ft
Configuration: Vertical
Latitude: 41.260000
Longitude: -80.580000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1981-03-06 182 BELDEN & BLAKE CO GeoDate 3/6/81
Original Spud 1981-05-26 R.I. 3-12-81, R.I. 6-11-80
Completed 1981-06-03 R.I. 3-12-81, R.I. 6-11-80
Reached Total Depth 1981-06-03 R.I. 3-12-81, R.I. 6-11-80
CO 1996-03-15 2651 D & L ENERGY INC GeoDate 3/6/81
APP 2013-05-10 Proposed Formations:CLINTON, Issued Date:5/10/2013, Expired Date:5/10/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2015-12-03 R.I. 3-12-81, R.I. 6-11-80
Construction Permit Expires 2016-11-15 R.I. 3-12-81, R.I. 6-11-80
Record Last Modified 2017-02-10 R.I. 3-12-81, R.I. 6-11-80

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4884 4888 2
2006-09-11 4870 4880 5
4870 4880 5
4870 4880 5
2006-09-11 4892 4896 2
2006-09-11 4914 4924 5
2006-09-11 4898 4900 1

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1020 Bbl 90000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 POWER GAS MARKETING & TRANS 4701.00 66.00 0
1985 BELDEN & BLAKE CORPORATION 2541.00 49.00 0
1987 BELDEN & BLAKE CORPORATION 2753.00 57.00 365
1988 BELDEN & BLAKE CORPORATION 1884.00 32.00 151
1990 BELDEN & BLAKE CORPORATION 2590.00 62.00 349
1991 BKK PROSPECTING LTD 1991.00 0.00 365
1992 BELDEN & BLAKE CORPORATION 1483.00 29.00 237
1993 BELDEN & BLAKE CORPORATION 1530.00 0.00 349
1994 BELDEN & BLAKE CORPORATION 1446.00 0.00 347
1995 BELDEN & BLAKE CORPORATION 761.00 56.00 125
2011 D & L ENERGY INC 0.00 0.00 0
2012 D & L ENERGY INC 0.00 0.00 365
2013 D & L ENERGY INC 0.00 0.00 0
2014 D & L ENERGY INC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 POWER GAS MARKETING & TRANS Brine 0 0
1985 BELDEN & BLAKE CORPORATION Brine 12 0
1987 BELDEN & BLAKE CORPORATION Brine 13 365
1988 BELDEN & BLAKE CORPORATION Brine 9 151
1990 BELDEN & BLAKE CORPORATION Brine 28 349
1991 BKK PROSPECTING LTD Brine 0 365
1992 BELDEN & BLAKE CORPORATION Brine 18 237
1993 BELDEN & BLAKE CORPORATION Brine 0 349
1994 BELDEN & BLAKE CORPORATION Brine 0 347
1995 BELDEN & BLAKE CORPORATION Brine 21 125
2011 D & L ENERGY INC Brine 0
2012 D & L ENERGY INC Brine 0 365
2013 D & L ENERGY INC Brine 0 0
2014 D & L ENERGY INC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1144355002 2014-5-28 0:00: AM No Violations
-1340095755 2015-12-7 0:00: PB No Violations 1.00
-1636206385 2015-11-30 0:00 PB No Violations 3.00
-1822945348 2015-12-2 0:00: PB No Violations 2.50
-2128372012 2015-3-10 0:00: UP No Violations 0.70
-717119826 2013-5-21 0:00: AM No Violations 0.20
-931205925 2016-6-23 0:00: FR No Violations 0.70
0105129607 2015-12-01 Plug / Plug Back No Violations I was on location to witness J Well plug the well for D & L Energy. Appalachian Well Survey was arrived on location. The 1.5 tubing was shot-off at 3,622. Next, J Well pulled all of the tubing from the well. The well was shut-in for the night.
0225748074 2010-12-30 Production Wells No Violations FOLLOW UP TO NOV # 2123963566 Complaint ,Jim Hubish , [landowner] . Inspection of well showed 4.5 production casing with swedge to 1 domestic line , there is a .25 hole in swedge open to atmosphere . There is no tank battery facility for well . Wel
0717119826 2013-05-21 Administrative Inspection No Violations A plugging permit was filed and issued on 5/10/2013 per my request from an inspection on 1/29/2013.
0931205925 2016-06-23 Final Restoration No Violations At the time of my inspection, Mr. Hubish has ploughed the well location and planted crops. There was no production equipment associated with the well. There was no access road to the well. No pits were used during the plugging of the well. A Form 5 has been signed and submitted to waive the removal of the sales and flow lines. Final restoration passed.
105129607 2015-12-1 0:00: PB No Violations 3.00
1144355002 2014-05-28 Administrative Inspection No Violations I conducted an administrative inspection in reference to compliance notice #2123963566. I spoke with Dave Rice of D & L Energy, who stated D & L was taking bids from a few plugging companies. At this time, there was no time table to actually plug the well. I will continue follow-up inspection.
1340095755 2015-12-07 Plug / Plug Back No Violations I was on location for a status check. During my inspection, I found the wellhead cut-off 30 below grade. The cement was static at surface. J Well was rigging down to move off location. There are no violations at this time.
1359569791 2013-01-29 UrbanProduction Wells No Violations I investigated an urban production well as a compliant request from attorney Molly Phillips for landowner, Jim Hubish. My inspection found a shut-in wellhead surrounded by thorns and weeds. There was no production equipment for the well. I researched our database and found ODNR Inspector Jerry Kohl issued a compliance notice for the well to be plugged on 12/30/2010. I found no application for a plugging permit in our database. D & L Energy reported zero production for 2011. The previous reported production was by Belden & Blake Corporation in 1995. I called Dave Rice of D & L Energy at 330-565-0430. I informed him about the order to plug the well issued by Jerry. I instructed him to file for a plugging permit by 3/1/2013. If a permit is not filed by this allotted time, a Chiefs Order will be issued. Since there has been no production since 1995 and there is no production equipment; this well should not be granted Temporary Inactive Status.
1608135712 2010-12-30 Production Wells No Violations FOLLOW UP TO NOV # 2123963566 Complainant ,Jim Hubish , [landowner] . Inspection of well showed 4.5 production casing with swedge to 1 domestic line. There is a .25 hole in swedge open to atmosphere. There is no tank battery facility for well. Well is idle at this time. I contacted company and spoke with Dave Rice. He advised me they plan to plug well when weather permits so they wont disturb the crop field.
1636206385 2015-11-30 Plug / Plug Back No Violations I was on location to witness J Well plug the well for D & L Energy. The cement contractor was on location. Petroset rigged up to the 4.5 casing and pressured up to 1,550 psi. Pressure held static for 15 minutes. Next, Petroset rigged up to the 1.5 tubing and pumped 18 barrels of fresh water. Thirteen barrels of water was needed to clear the tubing. Plug #1 was set from 4,870 to 4,600. Next, Petroset pumped an additional two barrels of fresh water, then mixed and bull headed 30 sacks of Class A cement with a yield of 1.36. The cement was displaced to 4,600 with 12 barrels of water. Petroset held pressure static on displaced cement for 10 minutes. Next, Petroset release pressure with zero barrels flowed back. J Well shut-in the well for the night. Appalachian Well Survey will be on location at 8 am tomorrow, December 1, 2015 to shoot off the tubing.
1822945348 2015-12-02 Plug / Plug Back No Violations I was on location to witness J Well plug the well for D & L Energy. J Well rigged up and pulled stretch on the 4.5 casing. Next, the rig operator ripped the casing at 3,472. One joint was pulled to set the Big Lime plug. Petroset is schedule for tomorrow, December 3, 2015. The well was shut-in for the night.
2123963566 2010-12-30 Production Wells Violations Noted Complaint ,Jim Hubish , [landowner] . Inspection of well showed 4.5 production casing with swedge to 1 domestic line , there is a .25 hole in swedge open to atmosphere . There is no tank battery facility for well . Well is idle at this time . I contacted company and spoke with Dave Rice , he advised me they plan to plug well when weather permits so they wont disturb the crop field.
2128372012 2015-03-10 UrbanProduction Wells Violations Noted I was on location for a status check. During my inspection, I found the well not in production. The wells 2 inch tubing reduced to 1 inch black iron flow line. The well is engulfed by weeds. There is no production equipment associated with the well. There is no identification posted. I spoke with Mr. Hubish on location. Mr. Hubish stated the well is not in operation. There is no lease road associated with the well. The proper identification sign will be posted by 6/1/2015. D & L has filed annual production from 2011 through 2013. Well shall be plugged by 9/10/2015. Photos were taken and are available upon request.
225748074 2010-12-30 0:00 PW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
2123963566 US-OH-121670 2011-03-28 Well shall be plugged
2128372012 US-OH-121803 2016-01-05 ID (a-i)

For data sources see[9]

References