If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-155-23110 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-80.83,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: PIN OAK ENERGY PARTNERS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: A & M | |
| License Status: Producing | |
| License Date: 1987-09-16 | |
| Spud Date: 1987-09-24 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1987-09-28 | |
| Well Total Depth: 4550.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.260000 | |
| Longitude: -80.830000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1987-09-16 | 2816 P & S ENERGY INC GeoDate 9/16/87 |
| Oil and Gas | 1987-09-16 | Issued Date 9/17/87 Expired Date 9/16/88 Acres 0040063 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04550 Proposed Drill Depth 04550 |
| Original Spud | 1987-09-24 | |
| Completed | 1987-09-28 | |
| Reached Total Depth | 1987-09-28 | |
| Completion Report Received | 1987-10-16 | |
| Construction Permit Expires | 1988-09-16 | |
| Change of Owner | 2019-02-26 | Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
| Record Last Modified | 2019-02-26 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 4322 | 4434 | 23 |
| 4322 | 4434 | 23 | |
| 4322 | 4434 | 23 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| N2 | 0 | 230 Mscf | 0 | |||
| H2O | 0 | 79240 Gal | 51600 | 59 BPM L@ 2793# |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1987 | P & S ENERGY INC | 0.00 | 0.00 | 365 |
| 1989 | P & S ENERGY INC | 39592.00 | 196.00 | 365 |
| 1990 | P & S ENERGY INC | 30267.00 | 97.00 | 365 |
| 1991 | P & S ENERGY INC | 18596.00 | 102.00 | 365 |
| 1992 | P & S ENERGY INC | 20734.00 | 95.00 | 365 |
| 1993 | P & S ENERGY INC | 24937.00 | 100.00 | 365 |
| 1994 | P & S ENERGY INC | 18626.00 | 0.00 | 208 |
| 1995 | P & S ENERGY INC | 18853.00 | 110.00 | 174 |
| 1996 | P & S ENERGY INC | 16500.00 | 0.00 | 281 |
| 1997 | P & S ENERGY INC | 19455.00 | 81.00 | 339 |
| 1998 | P & S ENERGY INC | 16057.00 | 0.00 | 365 |
| 1999 | P & S ENERGY INC | 15009.00 | 50.00 | 365 |
| 2000 | P & S ENERGY INC | 13097.00 | 0.00 | 365 |
| 2001 | P & S ENERGY INC | 13599.00 | 0.00 | 330 |
| 2002 | P & S ENERGY INC | 12719.00 | 0.00 | 365 |
| 2003 | P & S ENERGY INC | 11420.00 | 0.00 | 365 |
| 2004 | P & S ENERGY INC | 10455.00 | 0.00 | 365 |
| 2005 | P & S ENERGY INC | 9681.00 | 0.00 | 365 |
| 2006 | P & S ENERGY INC | 8530.00 | 0.00 | 365 |
| 2007 | P & S ENERGY INC | 9058.00 | 0.00 | 365 |
| 2008 | P & S ENERGY INC | 8962.00 | 45.00 | 365 |
| 2009 | P & S ENERGY INC | 7778.00 | 0.00 | 365 |
| 2010 | P & S ENERGY INC | 7138.00 | 0.00 | 365 |
| 2011 | P & S ENERGY INC | 5915.00 | 0.00 | 365 |
| 2012 | P & S ENERGY INC | 5567.00 | 0.00 | 366 |
| 2013 | P & S ENERGY INC | 5660.00 | 0.00 | 365 |
| 2014 | P & S ENERGY INC | 6249.00 | 0.00 | 365 |
| 2015 | P & S ENERGY INC | 4250.00 | 0.00 | 365 |
| 2016 | P & S ENERGY INC | 4515.00 | 0.00 | 365 |
| 2017 | P & S ENERGY INC | 4381.00 | 0.00 | 365 |
| 2018 | P & S ENERGY INC | 3205.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1987 | P & S ENERGY INC | Brine | 1270 | 365 |
| 1989 | P & S ENERGY INC | Brine | 35 | 365 |
| 1990 | P & S ENERGY INC | Brine | 50 | 365 |
| 1991 | P & S ENERGY INC | Brine | 0 | 365 |
| 1992 | P & S ENERGY INC | Brine | 0 | 365 |
| 1993 | P & S ENERGY INC | Brine | 0 | 365 |
| 1994 | P & S ENERGY INC | Brine | 0 | 208 |
| 1995 | P & S ENERGY INC | Brine | 0 | 174 |
| 1996 | P & S ENERGY INC | Brine | 0 | 281 |
| 1997 | P & S ENERGY INC | Brine | 59 | 339 |
| 1998 | P & S ENERGY INC | Brine | 0 | 365 |
| 1999 | P & S ENERGY INC | Brine | 0 | 365 |
| 2000 | P & S ENERGY INC | Brine | 0 | 365 |
| 2001 | P & S ENERGY INC | Brine | 0 | 330 |
| 2002 | P & S ENERGY INC | Brine | 0 | 365 |
| 2003 | P & S ENERGY INC | Brine | 0 | 365 |
| 2004 | P & S ENERGY INC | Brine | 0 | 365 |
| 2005 | P & S ENERGY INC | Brine | 0 | 365 |
| 2006 | P & S ENERGY INC | Brine | 0 | 365 |
| 2007 | P & S ENERGY INC | Brine | 0 | 365 |
| 2008 | P & S ENERGY INC | Brine | 20 | 365 |
| 2009 | P & S ENERGY INC | Brine | 0 | 365 |
| 2010 | P & S ENERGY INC | Brine | 0 | 365 |
| 2011 | P & S ENERGY INC | Brine | 0 | 365 |
| 2012 | P & S ENERGY INC | Brine | 5 | 366 |
| 2013 | P & S ENERGY INC | Brine | 0 | 365 |
| 2014 | P & S ENERGY INC | Brine | 0 | 365 |
| 2015 | P & S ENERGY INC | Brine | 0 | 365 |
| 2016 | P & S ENERGY INC | Brine | 0 | 365 |
| 2017 | P & S ENERGY INC | Brine | 0 | 365 |
| 2018 | P & S ENERGY INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1956414746 | 2019-11-12 0:00 | UP | No Violations | |
| -2132872908 | 2012-10-24 0:00 | UP | No Violations | 0.50 |
| 0000002863 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 3/1/90 INSPECTOR JERRY KOHL DATE 03/0119/90 DATA FROM OLD VAX INFO | |
| 0000PL3326 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 0866529503 | 2012-10-04 | UrbanProduction Wells | No Violations | I conducted an urban production well inspection status check. My inspection found the well equipped with a plunger lift unit surrounded by a chain link fence with no identification and shares a tank battery with permit number 2-3486. The tank battery was surrounded by a chain link fence and contained two, 210 barrel oil/brine storage tanks, two separators, and the proper identification. This P & S Energy Inc., well site shares the tank battery location with Everflow Eastern. I noticed no visible spills or leaks. I called P & S Energy Inc., and asked for an identification sign to be posted as the well. I will conducted a follow-up inspection. |
| 1425897567 | 2015-02-24 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of two, 210 barrel production tanks and two, mechanical separators. A dike surrounded the tank battery. An identification sign was posted. There was a plug on the load line. A locked, chain link fence surrounded the tank battery. The lease road was in stable condition. The well was placed into production prior to House Bill 278. |
| 1485806903 | 2017-01-23 | UrbanPreliminary Restoration | No Violations
-3486 and 2-3592. The equipment on site consists of:
| |
| 2132872908 | 2012-10-24 | UrbanProduction Wells | No Violations | I completed a follow-up NOV inspection. My inspection found the proper identification posted at the well. |
| 2863 | PL | No Violations | ||
| 866529503 | 2012-10-4 0:00: | UP | No Violations | 0.50 |
| PL3326 | PL | No Violations |
For data sources see[9]