If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23287 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18,"lon":-80.68,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Liberty Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: KATIES KORNER UNIT | |
License Status: Producing | |
License Date: 1989-07-05 | |
Spud Date: 1989-07-26 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1989-07-30 | |
Well Total Depth: 5146.00 ft | |
Configuration: Vertical | |
Latitude: 41.180000 | |
Longitude: -80.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1989-07-05 | 2037 CEDAR VALLEY ENERGY INC GeoDate 7/5/89 |
Oil and Gas | 1989-07-05 | Issued Date 7/5/89 Expired Date 7/5/90 Acres 0049550 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05146 Proposed Drill Depth 05146 |
Original Spud | 1989-07-25 | |
Completed | 1989-07-30 | |
Reached Total Depth | 1989-07-30 | |
Completion Report Received | 1990-03-21 | |
Construction Permit Expires | 1990-07-05 | |
Correction to Well | 2007-08-24 | UNIT REDUCED TO 41.23 ACRES. |
Correction to Well | 2007-08-31 | UNIT REDUCED TO 41.23 ACRES. |
Record Last Modified | 2019-06-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4906 | 4998 | 0 |
4906 | 4998 | 0 | |
2006-09-11 | 4981 | 4987 | 15 |
4981 | 4987 | 15 | |
4906 | 4998 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 101000 Gal | 65000 | FRAC:WATER/SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1990 | CEDAR VALLEY ENERGY INC | 13436.00 | 986.00 | 310 |
1991 | CEDAR VALLEY ENERGY INC | 11713.00 | 435.00 | 365 |
1992 | CEDAR VALLEY ENERGY INC | 10453.00 | 364.00 | 365 |
1993 | CEDAR VALLEY ENERGY INC | 10093.00 | 273.00 | 365 |
1994 | CEDAR VALLEY ENERGY INC | 8764.00 | 227.00 | 365 |
1995 | CEDAR VALLEY ENERGY INC | 9323.00 | 231.00 | 365 |
1996 | CEDAR VALLEY ENERGY INC | 6885.00 | 176.00 | 365 |
1997 | CEDAR VALLEY ENERGY INC | 5217.00 | 143.00 | 365 |
1998 | CEDAR VALLEY ENERGY INC | 4621.00 | 72.00 | 365 |
1999 | CEDAR VALLEY ENERGY INC | 4105.00 | 142.00 | 365 |
2000 | CEDAR VALLEY ENERGY INC | 4243.00 | 173.00 | 365 |
2001 | CEDAR VALLEY ENERGY INC | 3769.00 | 127.00 | 365 |
2002 | CEDAR VALLEY ENERGY INC | 4824.00 | 125.00 | 365 |
2003 | CEDAR VALLEY ENERGY INC | 4402.00 | 100.00 | 354 |
2004 | CEDAR VALLEY ENERGY INC | 4693.00 | 0.00 | 365 |
2005 | CEDAR VALLEY ENERGY INC | 3379.00 | 65.00 | 365 |
2006 | CEDAR VALLEY ENERGY INC | 3006.00 | 45.00 | 365 |
2007 | CEDAR VALLEY ENERGY INC | 2938.00 | 0.00 | 365 |
2008 | CEDAR VALLEY ENERGY INC | 2355.00 | 69.00 | 365 |
2009 | CEDAR VALLEY ENERGY INC | 1894.00 | 0.00 | 365 |
2010 | CEDAR VALLEY ENERGY INC | 2586.00 | 57.00 | 365 |
2011 | CEDAR VALLEY ENERGY INC | 2561.00 | 0.00 | 365 |
2012 | CEDAR VALLEY ENERGY INC | 2175.00 | 53.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 1611.00 | 0.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 1418.00 | 55.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 1724.00 | 42.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 1557.00 | 0.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 1611.00 | 0.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 1782.00 | 51.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL3249 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
1023202086 | 2017-05-26 | UrbanProduction Wells | No Violations
-up line is secure with a plug. Identification signs are posted on the tank battery and well. A deduct meter and 7 day chart dated 5/26/17 is installed at the separator. The access road is in good repair. The equipment on site:
| |
2126600459 | 2015-11-23 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery consists of a 100 barrel production tank, a 50 barrel brine tank, and a mechanical separator. There is a dike around the tank battery. An identification sign is posted at the well and tank battery. The lease road is in stable condition with a locked wire gate at the entrance. |
PL3249 | PL | No Violations |
For data sources see[9]