If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-155-23487 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-80.82,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: PIN OAK ENERGY PARTNERS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: SPAIN | |
| License Status: Producing | |
| License Date: 1992-09-22 | |
| Spud Date: 1992-11-28 | |
| Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
| Final Drill Date: 1992-12-09 | |
| Well Total Depth: 5079.00 ft | |
| Configuration: Directional | |
| Latitude: 41.250000 | |
| Longitude: -80.820000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1992-09-22 | 2816 P & S ENERGY INC GeoDate 9/22/92 |
| Oil and Gas | 1992-09-22 | Issued Date 9/22/92 Expired Date 9/22/93 Acres 0041530 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05079 Proposed Drill Depth 05079 |
| Original Spud | 1992-11-28 | CHG. FTG, XY 2-6-93 |
| Completed | 1992-12-09 | CHG. FTG, XY 2-6-93 |
| Reached Total Depth | 1992-12-09 | CHG. FTG, XY 2-6-93 |
| Completion Report Received | 1993-05-05 | CHG. FTG, XY 2-6-93 |
| Construction Permit Expires | 1993-09-22 | CHG. FTG, XY 2-6-93 |
| Change of Owner | 2019-02-26 | Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
| Record Last Modified | 2019-02-26 | CHG. FTG, XY 2-6-93 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 4824 | 4960 | 0 |
| 4824 | 4960 | 0 | |
| 2006-09-11 | 4850 | 4914 | 77 |
| 4850 | 4914 | 77 | |
| 4824 | 4960 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 122000 Gal | 80000 | FRAC W/122M GAL H20 & 80M# SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1992 | P & S ENERGY INC | 0.00 | 0.00 | 365 |
| 1993 | P & S ENERGY INC | 41738.00 | 285.00 | 227 |
| 1994 | P & S ENERGY INC | 55439.00 | 192.00 | 365 |
| 1995 | P & S ENERGY INC | 39224.00 | 0.00 | 365 |
| 1996 | P & S ENERGY INC | 33497.00 | 13.00 | 365 |
| 1997 | P & S ENERGY INC | 27500.00 | 58.00 | 365 |
| 1998 | P & S ENERGY INC | 25902.00 | 0.00 | 365 |
| 1999 | P & S ENERGY INC | 23114.00 | 0.00 | 365 |
| 2000 | P & S ENERGY INC | 18911.00 | 61.00 | 365 |
| 2001 | P & S ENERGY INC | 16630.00 | 0.00 | 365 |
| 2002 | P & S ENERGY INC | 15357.00 | 0.00 | 365 |
| 2003 | P & S ENERGY INC | 15795.00 | 0.00 | 365 |
| 2004 | P & S ENERGY INC | 12453.00 | 49.00 | 365 |
| 2005 | P & S ENERGY INC | 10912.00 | 0.00 | 365 |
| 2006 | P & S ENERGY INC | 9387.00 | 0.00 | 365 |
| 2007 | P & S ENERGY INC | 10257.00 | 0.00 | 365 |
| 2008 | P & S ENERGY INC | 9861.00 | 0.00 | 365 |
| 2009 | P & S ENERGY INC | 9518.00 | 0.00 | 365 |
| 2010 | P & S ENERGY INC | 10596.00 | 0.00 | 365 |
| 2011 | P & S ENERGY INC | 9275.00 | 0.00 | 365 |
| 2012 | P & S ENERGY INC | 10515.00 | 0.00 | 366 |
| 2013 | P & S ENERGY INC | 9896.00 | 0.00 | 365 |
| 2014 | P & S ENERGY INC | 8846.00 | 0.00 | 365 |
| 2015 | P & S ENERGY INC | 8250.00 | 0.00 | 365 |
| 2016 | P & S ENERGY INC | 6891.00 | 49.00 | 365 |
| 2017 | P & S ENERGY INC | 6890.00 | 0.00 | 365 |
| 2018 | P & S ENERGY INC | 7315.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1992 | P & S ENERGY INC | Brine | 900 | 365 |
| 1993 | P & S ENERGY INC | Brine | 13000 | 227 |
| 1994 | P & S ENERGY INC | Brine | 70 | 365 |
| 1995 | P & S ENERGY INC | Brine | 63 | 365 |
| 1996 | P & S ENERGY INC | Brine | 0 | 365 |
| 1997 | P & S ENERGY INC | Brine | 105 | 365 |
| 1998 | P & S ENERGY INC | Brine | 0 | 365 |
| 1999 | P & S ENERGY INC | Brine | 0 | 365 |
| 2000 | P & S ENERGY INC | Brine | 0 | 365 |
| 2001 | P & S ENERGY INC | Brine | 0 | 365 |
| 2002 | P & S ENERGY INC | Brine | 0 | 365 |
| 2003 | P & S ENERGY INC | Brine | 0 | 365 |
| 2004 | P & S ENERGY INC | Brine | 40 | 365 |
| 2005 | P & S ENERGY INC | Brine | 0 | 365 |
| 2006 | P & S ENERGY INC | Brine | 0 | 365 |
| 2007 | P & S ENERGY INC | Brine | 0 | 365 |
| 2008 | P & S ENERGY INC | Brine | 0 | 365 |
| 2009 | P & S ENERGY INC | Brine | 0 | 365 |
| 2010 | P & S ENERGY INC | Brine | 0 | 365 |
| 2011 | P & S ENERGY INC | Brine | 52 | 365 |
| 2012 | P & S ENERGY INC | Brine | 0 | 366 |
| 2013 | P & S ENERGY INC | Brine | 69 | 365 |
| 2014 | P & S ENERGY INC | Brine | 21 | 365 |
| 2015 | P & S ENERGY INC | Brine | 0 | 365 |
| 2016 | P & S ENERGY INC | Brine | 0 | 365 |
| 2017 | P & S ENERGY INC | Brine | 0 | 365 |
| 2018 | P & S ENERGY INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1421372677 | 2014-9-23 0:00: | UP | No Violations | 0.50 |
| 0909200872 | 2004-02-25 | Preliminary Restoration | No Violations | Restoration approved . |
| 1421372677 | 2014-09-23 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production equipped with a plunger lift unit. The tank battery consisted of two, 210 barrel and a 100 production tanks, a 50 barrel brine tank, and three separators. A dike surrounded the production equipment. Identification signs were posted at the well and tank battery. Bull plugs were installed on the load lines. A locked, chain link fence surrounded the production equipment. The lease road was in stable condition. The well was placed into production prior to House Bill 278. |
| 1485781708 | 2017-01-23 | UrbanProduction Wells | No Violations
-3580, and 2-3324. The access road is shared with permit 2-3550. The equipment on site consists of:
| |
| 1687086070 | 2020-9-10 0:00: | UP | No Violations | |
| 909200872 | 2004-2-25 0:00: | PL | No Violations |
For data sources see[9]