If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23747 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18,"lon":-80.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Liberty Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: VAN LYNN UNIT | |
License Status: Producing | |
License Date: 2002-07-24 | |
Spud Date: 2002-08-15 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2002-08-19 | |
Well Total Depth: 5118.00 ft | |
Configuration: Vertical | |
Latitude: 41.180000 | |
Longitude: -80.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-07-24 | Proposed Formations:CLINTON, Issued Date:7/24/2002, Expired Date:7/24/2003 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2002-08-15 | RBDMS Rec |
Completed | 2002-08-19 | RBDMS Rec |
Reached Total Depth | 2002-08-19 | RBDMS Rec |
Completion Report Received | 2002-09-26 | RBDMS Rec |
Construction Permit Expires | 2003-07-24 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2002-11-07 | 4896 | 4920 | 42 |
4896 | 4920 | 42 | |
4896 | 4920 | 42 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 87890 Gal | 42000 | 500 GALLONS FE ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | CEDAR VALLEY ENERGY INC | 0.00 | 157.00 | 82 |
2003 | CEDAR VALLEY ENERGY INC | 7081.00 | 729.00 | 365 |
2004 | CEDAR VALLEY ENERGY INC | 5134.00 | 251.00 | 365 |
2005 | CEDAR VALLEY ENERGY INC | 2287.00 | 114.00 | 365 |
2006 | CEDAR VALLEY ENERGY INC | 1834.00 | 103.00 | 365 |
2007 | CEDAR VALLEY ENERGY INC | 1941.00 | 96.00 | 365 |
2008 | CEDAR VALLEY ENERGY INC | 1677.00 | 51.00 | 365 |
2009 | CEDAR VALLEY ENERGY INC | 1553.00 | 65.00 | 365 |
2010 | CEDAR VALLEY ENERGY INC | 1262.00 | 0.00 | 365 |
2011 | CEDAR VALLEY ENERGY INC | 1600.00 | 44.00 | 365 |
2012 | CEDAR VALLEY ENERGY INC | 1369.00 | 27.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 1026.00 | 0.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 689.00 | 35.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 1303.00 | 52.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 1592.00 | 0.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 1510.00 | 33.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 1459.00 | 32.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | CEDAR VALLEY ENERGY INC | Brine | 55 | 82 |
2003 | CEDAR VALLEY ENERGY INC | Brine | 160 | 365 |
2004 | CEDAR VALLEY ENERGY INC | Brine | 49 | 365 |
2005 | CEDAR VALLEY ENERGY INC | Brine | 60 | 365 |
2006 | CEDAR VALLEY ENERGY INC | Brine | 0 | 365 |
2007 | CEDAR VALLEY ENERGY INC | Brine | 40 | 365 |
2008 | CEDAR VALLEY ENERGY INC | Brine | 55 | 365 |
2009 | CEDAR VALLEY ENERGY INC | Brine | 40 | 365 |
2010 | CEDAR VALLEY ENERGY INC | Brine | 0 | 365 |
2011 | CEDAR VALLEY ENERGY INC | Brine | 0 | 365 |
2012 | CEDAR VALLEY ENERGY INC | Brine | 65 | 366 |
2013 | CEDAR VALLEY ENERGY INC | Brine | 0 | 365 |
2014 | CEDAR VALLEY ENERGY INC | Brine | 20 | 365 |
2015 | CEDAR VALLEY ENERGY INC | Brine | 0 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 68 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 0 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 46 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1539246822 | 2015-11-23 0:00 | UP | No Violations | 0.50 |
1539246822 | 2015-11-23 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. A domestic gas line comes off of the wells 4.5 casing. The tank battery consists of a 100 barrel production tank, a 50 barrel brine tank, and a mechanical separator. Identification signs are posted at the tank battery and well. A dike surrounds the tank battery. The lease road is in stable condition. |
For data sources see[9]