34-155-23889

Well Details

Well ID: 34-155-23889
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Hubbard Township
Operator Name: PAC DRILLING LLC
Well Pad ID:
Farm/Lease Name: FERRARA
License Status: Producing
License Date: 2007-12-17
Spud Date: 2008-01-07
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2008-01-12
Well Total Depth: 5373.00 ft
Configuration: Vertical
Latitude: 41.170000
Longitude: -80.610000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-12-17 Proposed Formations:CLINTON, Issued Date:12/17/2007, Expired Date:12/16/2008 6:00:00 AM, Drilling unit acres:281.52, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-01-12
Completion Report Received 2008-03-04
Construction Permit Expires 2008-12-16
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-07-02 5110 5144 54
5110 5144 54
5110 5144 54

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 0 50000 FRAC WATER VOLUME NOT REPORTED

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 PAC DRILLING LLC 25840.00 1222.00 333
2009 PAC DRILLING LLC 20481.00 747.00 333
2010 PAC DRILLING LLC 17452.00 452.00 328
2012 PAC DRILLING LLC 6293.00 376.00 362
2013 PAC DRILLING LLC 3786.00 332.00 360
2014 PAC DRILLING LLC 3359.00 228.00 360
2015 PAC DRILLING LLC 3579.00 240.00 360
2016 PAC DRILLING LLC 2201.00 207.00 359
2017 PAC DRILLING LLC 1887.00 193.00 359
2018 PAC DRILLING LLC 2264.00 132.00 359

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 PAC DRILLING LLC Brine 67 333
2009 PAC DRILLING LLC Brine 60 333
2010 PAC DRILLING LLC Brine 52 328
2012 PAC DRILLING LLC Brine 0 362
2013 PAC DRILLING LLC Brine 20 360
2014 PAC DRILLING LLC Brine 0 360
2015 PAC DRILLING LLC Brine 40 360
2016 PAC DRILLING LLC Brine 21 359
2017 PAC DRILLING LLC Brine 13 359
2018 PAC DRILLING LLC Brine 10 359

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1114043073 2017-3-13 0:00: UP No Violations 0.50
-2074402581 2018-5-16 0:00: UP No Violations
-38568781 2019-2-27 0:00: UP No Violations
-442315517 2016-2-12 0:00: UP No Violations 0.50
-799834865 2020-3-27 0:00: UP No Violations
-882994755 2009-10-27 0:00 PL No Violations
0038568781 2019-02-27 UrbanProduction Wells No Violations I conducted a compliance notice follow-up for compliance notice 2074402581, regarding multiple compliance issues related to urban rule requirements. At the time of this inspection, The pick-up lines have plugs, and handles removed at the tank battery location. Identification posted at the tank battery has now been amended with the required information per 1501:9-9-05(E)(1)(a-e). There was a chain link fence around the tank battery but was not eight feet in height and needed a lock on the man door. The 210 BBL storage tank extends more than 3 foot above the top of the fencing. The access road was stable, but no access gate had been installed. The access road gate was not waived during the pre-site inspection.

PAC needs to: 1) Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9-05(E)(4)(f). 2) Install the required gate with a lock at the access road entrance per 1501:9-9-05(E)(2)(c). 3) Post the proper identification sign on the access road gate per 1501:9-9-05(E)(1)(f).

0442315517 2016-02-12 UrbanProduction Wells No Violations


The equipment on the site consists of the following:


1 Mechanical separator 2 Activated charcoal filters 2 Low-pressure relief valves 2 Lightning arrestors 1 Production well

0882994755 2009-10-27 Preliminary Restoration No Violations Check well per complaint from Gary Litch [ TWP Trustee ] , Truck traffic late at night disturbing local residents . I contacted Jason Caldwell and advised him of complaint per truck traffic at wells late at night , I also advised him in urbanised areas maintenance or service on wells are to occur only between 7 AM and 7 PM 7 days a week unless it is an emergency . He advised me he would check into it and stop traffic to well in resticted hours . No violations at this time .
1114043073 2017-03-13 UrbanProduction Wells No Violations

-up lines have plugs, but no locks. Both of the 210 bbl. storage tanks have the required urban safety equipment. There is an identification sign posted at the tank battery. The identification sign is missing the required information per 1501:9-9-05(E)(1)(a--site inspection. The tank battery is shared with permits #2-3887 and #2-3890.

The equipment on the pad consists of the following:



2074402581 2018-05-16 UrbanProduction Wells Violations Noted At the time of this inspection, the well was equipped with a plunger lift assembly. The annulus and flow line valves were open. The well was fenced with a locked door and had legible signage. The tank battery has three storage tanks and a separator. The pick-up lines have plugs, but no locks. Both of the 210 BBL storage tanks have the required urban safety equipment. There was an identification sign posted at the tank battery, but was missing the required information per 1501:9-9-05(E)(1)(a-e). There was a chain link fence around the tank battery but was not eight feet in height and needed a lock on the man door. The 210 BBL storage tank extends more than 3 foot above the top of the fencing. The access road was stable, but no access gate had been installed. The access road gate was not waived during the pre-site inspection. The tank battery was shared with permits #2-3890 and #2-3889.

PAC needs to: 1) Correct the identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9-05(E)(4)(f). 3) Install the required gate with a lock at the access road entrance per 1501:9-9-05(E)(2)(c). 4) Post the proper identification sign on the access road gate per 1501:9-9-05(E)(1)(f).

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
2074402581 US-OH-121164 2018-06-05 9-05E1 ID (a-i)
2074402581 US-OH-121165 2018-06-05 9-05E2 FENCING (a-d)
2074402581 US-OH-121166 2018-06-05 9-05E3 LOCKS
2074402581 US-OH-121167 2018-06-05 9-9-02 General Safety

For data sources see[9]

References