If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24031 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.19,"lon":-80.68,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Liberty Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: PRICE UNIT | |
License Status: Producing | |
License Date: 2010-09-02 | |
Spud Date: 2010-10-12 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2010-10-16 | |
Well Total Depth: 5086.00 ft | |
Configuration: Vertical | |
Latitude: 41.190000 | |
Longitude: -80.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-09-02 | Proposed Formations:CLINTON, Issued Date:9/2/2010, Expired Date:9/1/2012 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-10-16 | |
Completion Report Received | 2011-01-03 | |
Construction Permit Expires | 2011-09-02 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-05-04 | 4836 | 4880 | 45 |
4836 | 4880 | 45 | |
4836 | 4880 | 45 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-10-28 | H2O | 15 | 99000 Gal | 58500 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | CEDAR VALLEY ENERGY INC | 7292.00 | 635.00 | 365 |
2012 | CEDAR VALLEY ENERGY INC | 7341.00 | 362.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 5459.00 | 252.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 4882.00 | 200.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 5097.00 | 221.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 5510.00 | 139.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 5101.00 | 130.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 4806.00 | 84.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | CEDAR VALLEY ENERGY INC | Brine | 351 | 365 |
2012 | CEDAR VALLEY ENERGY INC | Brine | 97 | 366 |
2013 | CEDAR VALLEY ENERGY INC | Brine | 98 | 365 |
2014 | CEDAR VALLEY ENERGY INC | Brine | 93 | 365 |
2015 | CEDAR VALLEY ENERGY INC | Brine | 63 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 104 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 29 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 56 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-997401666 | 2014-3-27 0:00: | UP | No Violations | 0.50 |
0599155295 | 2011-09-14 | Preliminary Restoration | No Violations | There were no violations found at the time of my inspection. |
0997401666 | 2014-03-27 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank and a separator. The dike met containment requirements. A 7 day production chart was inside the separator. A bull plug was installed on the load line. There was no identification sign on site. The lease road was in great repair with a locked gate at the entrance. I contacted Cedar Valley and instructed them to posted the proper identification sign at the tank battery and well. Tim, field supervisor, stated the proper identification sign would be ordered and posted immediately. |
599155295 | 2011-9-14 0:00: | PL | No Violations |
For data sources see[9]