X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-24044

Well Details

Well ID: 34-155-24044
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Bristol Township
Operator Name: CEDAR VALLEY ENERGY INC
Well Pad ID:
Farm/Lease Name: AARON MILLER UNIT
License Status: Producing
License Date: 2011-07-15
Spud Date: 2011-10-16
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2011-10-19
Well Total Depth: 4148.00 ft
Configuration: Vertical
Latitude: 41.380000
Longitude: -80.890000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-07-15 Proposed Formations:QUEENSTON, Issued Date:7/15/2011, Expired Date:7/14/2013 12:00:00 PM, Drilling unit acres:45, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-10-19
Completion Report Received 2011-12-13
Construction Permit Expires 2013-07-14
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-01-11 3928 3981 36
3928 3981 36
3928 3981 36

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-11-10 H2O 15 73410 Gal 41500 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 CEDAR VALLEY ENERGY INC 6825.00 4630.00 366
2013 CEDAR VALLEY ENERGY INC 5936.00 2620.00 365
2014 CEDAR VALLEY ENERGY INC 3117.00 1379.00 365
2015 CEDAR VALLEY ENERGY INC 2293.00 865.00 365
2016 CEDAR VALLEY ENERGY INC 2113.00 1269.00 365
2017 CEDAR VALLEY ENERGY INC 2077.00 992.00 365
2018 CEDAR VALLEY ENERGY INC 1723.00 724.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 CEDAR VALLEY ENERGY INC Brine 1617 366
2013 CEDAR VALLEY ENERGY INC Brine 885 365
2014 CEDAR VALLEY ENERGY INC Brine 591 365
2015 CEDAR VALLEY ENERGY INC Brine 616 365
2016 CEDAR VALLEY ENERGY INC Brine 763 365
2017 CEDAR VALLEY ENERGY INC Brine 311 365
2018 CEDAR VALLEY ENERGY INC Brine 305 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1400149808 2011-10-18 0:00 DD No Violations
-1965474716 2016-8-22 0:00: PW No Violations 1.00
-381056634 2020-3-5 0:00:0 PW No Violations 0.60
0378163095 2011-10-20 Drill / Deepen / Reopen No Violations The cementing of production casing was witnessed. The cement operation and site conditions were acceptable.
1340986800 2012-06-20 Preliminary Restoration No Violations My inspection found that the preliminary restoration was complete. There were no violations at the wellhead or at the tank battery.
1363884418 2013-03-21 Production Wells No Violations My inspection found the trench in the southwest corner repaired per my request. There was a 2 drain with a plug on the end through the dike.
1381219198 2011-10-17 Drill / Deepen / Reopen No Violations The cementing of 338 of 8.675 surface casing was completed successfully.
1400149808 2011-10-18 Drill / Deepen / Reopen No Violations The rig was drilling at 1975. No violations were found at the time.
1935316230 2012-05-16 Production Wells No Violations My inspection of this well site found no violations at the time. Preliminary Restoration was complete, except vegetation needs to be established.
1944241165 2013-03-20 Production Wells No Violations My inspection found the well in production. It was equipped with a pumping unit. The tank battery contained two, 100 barrel production tank, one, 50 barrel brine tank, and a separator. There were locks and plugs on the load lines. An identification sign was posted on the tank. The proper dike surrounded the tank battery with a small trench in the southwest corner. The lease road was in great condition covered with slag. I called Tim Cosma, 330-853-9565. I told him to repair the trench in the dike immediately. I will re-inspect by 3/21/2013.
1965474716 2016-08-22 Production Wells No Violations At the time of my inspection, I found Bishop Well Service on location pulling rods to repair a broken one. The well is equipped with an electric pumping unit. The tank battery has three storage tanks and a separator. A dike surrounds the tank battery. An identification sign is posted between the two 100 bbl. storage tanks. The load lines are secure with locks and plugs. The production equipment is in good repair. The access road is in good and stable condition with a locked gate at the entrance.

The equipment on the site consists of the following:



378163095 2011-10-20 0:00 DD No Violations

For data sources see[9]

References