34-155-24057

Well Details

Well ID: 34-155-24057
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Hartford Township
Operator Name: HALCON OPERATING COMPANY INC
Well Pad ID: US-OH-000624
Farm/Lease Name: BRUGLER
License Status: Not Drilled
License Date: 2012-11-02
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 41.340000
Longitude: -80.550000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-05-09 Proposed Formations:UTICA, Issued Date:5/9/2012, Expired Date:5/9/2014 12:00:00 PM, Drilling unit acres:114.69, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-05-11 Proposed Formations:TRENTON, Issued Date:5/11/2012, Expired Date:5/11/2014 12:00:00 PM, Drilling unit acres:114.69, Proposed Well Type:ST, Proposed Well Class:STRT
Change of Owner 2012-10-25 Operator changed from 8928, CARRIZO (UTICA) LLC to 8966, HALCON OPERATING COMPANY INC
APP 2012-11-02 Proposed Formations:TRENTON, Issued Date:11/2/2012, Expired Date:11/2/2014 12:00:00 PM, Drilling unit acres:114.69, Proposed Well Type:ST, Proposed Well Class:STRT
Completion Report Received 2014-08-04
Construction Permit Expires 2014-11-02
Record Last Modified 2018-11-01

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/06/2013 03/11/2013 6674 4,081,960.0 21500
2 03/11/2013 03/11/2013 6674.0 4017278.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Base Fluid NA NA 0 0 0
Hazardous and Non-Hazardous Ingredients Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.000944024 383
Water 7732-18-5 100 0.745836 302088
Ammonium chloride 12125-02-9 10 0.00262676 1064
Isopropanol 67-63-0 30 0.0411882 16683
Sodium sulfate 7757-82-6 0.1 0.00000402 2
Potassium carbonate 584-08-7 60 0.0114624 4643
Olefins Confidential 5 0.00037761 154
Guar gum 9000-30-0 100 0.156239 63281
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00378335 1533
Cured acrylic resin Confidential 30 0.00388813 1575
Hydrochloric acid 7647-01-0 60 0.303208 122808
Terpenes and Terpenoids Confidential 10 0.0137294 5561
Alcohols, C12-16, ethoxylated 61791-08-0 30 0.0411882 16683
Crystalline Silica, Quartz 14808-60-7 0.1 0.000156239 64
Polyacrylamide copolymer Confidential 30 0.00118379 480
Surfactant mixture Confidential 1 0.00312477 1266
Propargyl alcohol 107-19-7 10 0.000314675 128
Terpenes and Terpenoids, sweet orange-oil 68647-72-3 30 0.0411882 16683
Fatty acids, tall oil Confidential 30 0.000944024 383
Phenol / formaldehyde resin 9003-35-4 5 0.133682 54145
Sodium perborate tetrahydrate 10486-00-7 100 0.000508607 206
Hexamethylenetetramine 100-97-0 2 0.0534729 21658
Organic phosphonate Confidential 60 0.0145768 5904
Methanol 67-56-1 60 0.00188805 765
Monoethanolamine borate 26038-87-9 60 0.0951638 38544
Quaternary amine Confidential 5 0.00251494 1019
C.I. Pigment Red 5 6410-41-9 1 0.000125423 51
Sodium persulfate 7775-27-1 100 0.00402441 1630
Hydrotreated light petroleum distillate 64742-47-8 30 0.00118379 480
Silica gel 112926-00-8 1 0.00156239 633
Ethoxylated fatty acid Confidential 30 0.0823763 33366
Amine salts Confidential 0.1 0.00008246 34
Ammonium salt Confidential 60 0.0247371 10020
Acetic acid 64-19-7 60 0.0114149 4624
Ethylene glycol 107-21-1 30 0.0475819 19272
Alcohols ethoxylated Confidential 5 0.000197299 80
Citric acid 77-92-9 60 0.0131603 5331
Amide Confidential 5 0.000197299 80
Enzyme Confidential 5 0.000627117 255
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 1 0.00003946 16
Crystalline silica, quartz 14808-60-7 100 14.9074 6,037,920.0
Sorbitan, mono-9-octadecenoate, (Z) 1338-43-8 1 0.00003946 16
Bentonite, benzyl(hydrogenated

tallow alkyl) dimethylammonium stearate complex

121888-68-4 5 0.00781193 3165
Formaldehyde 50-00-0 1 0.000242946 99
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000944024 383
Propylene glycol 57-55-6 60 0.0227001 9195
Acetic anhydride 108-24-7 100 0.0190249 7706
Walnut hulls NA 100 0.0125423 5080
Sodium chloride 7647-14-5 5 0.00225872 915
BA-40L BUFFERING AGENT, BC-140,

BE-9W, Cla-Web(TM), FE-1A ACIDIZING COMPOSITION, FE-2A, FR-66, GasPerm 1000(TM), HAI-OS ACID INHIBITOR, OPTIFLO-HTE, OptiKleen-WF(TM), SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676),

Halliburton Additive, Biocide, Breaker, Buffer, Concentrate, Corrosion Inhibitor, Crosslinker, Friction Reducer, Gelling Agent, Proppant, Scale Inhibitor, NA NA 0 0 0
SAND-CRC PREMIUM-30/50, BULK, SAND-PREMIUM

WHITE-30/50, BULK, Scalechek(R) LP-65 Scale Inhibitor, SP BREAKER, WG-36 GELLING AGENT

Halliburton Surfactant NA NA 0 0 0
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 83.9513 34,002,600.0
2 WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 10000.0 15.63285
Scalechek LP-65 Scale Inhibitor Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 1000.0 0.24309
30/50 CRC Sand Halliburton Proppant Crystalline silica, quartz 14808-60-7 10000.0 28.99739
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Methanol 67-56-1 6000.0 0.17793
FE ACID - 10 HCL Halliburton Solvent Hydrochloric acid 7647-01-0 1000.0 183.9431
GasPerm 1000 Halliburton Surfactant Isopropanol 67-63-0 3000.0 4.12118
SP BREAKER Halliburton Breaker Sodium persulfate 7775-27-1 10000.0 0.40267
20/40 Sand Halliburton Proppant Crystalline silica, quartz 14808-60-7 10000.0 28.90351
OptiKleen-WF Halliburton Concentrate Sodium perborate tetrahydrate 10486-00-7 10000.0 0.05089
BE-9W Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 1000.0 0.37855
Walnut hulls Mixture 10000.0 1.25496
Propargyl alcohol 107-19-7 1000.0 0.02966
Monoethanolamine borate 26038-87-9 6000.0 9.52185
Phenol / formaldehyde resin 9003-35-4 500.0 11.92603
Hexamethylenetetramine 100-97-0 200.0 4.77041
Terpenes and Terpenoids, sweet orange-oil 68647-72-3 3000.0 4.12118
Fresh Water Operator 10000.0 8266.852
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 3000.0 0.11845
Premium White Sand Halliburton Proppant Crystalline silica, quartz 14808-60-7 10000.0 1184.65357
BA-40LM Halliburton Buffer Potassium carbonate 584-08-7 6000.0 1.14668
SSA-2 Halliburton Proppant Crystalline silica, quartz 14808-60-7 10000.0 10.14834
BC-140 Halliburton Crosslinker Ethylene glycol 107-21-1 3000.0 4.76093
20/40 CRC Sand Halliburton Proppant Crystalline silica, quartz 14808-60-7 10000.0 238.52065
OPTIFLO-HTE Halliburton Breaker Crystalline silica, quartz 14808-60-7 3000.0 0.37649
CLA-WEB Halliburton Additive Ammonium salt Confidential Business Information 5000.0 2.06261

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-03-09 H2O 0 246865 Gal 414600 Halliburton STAGE 7
2013-03-10 H2O 0 226262 Gal 384900 Halliburton STAGE 11
2013-03-08 H2O 0 399478 Gal 750800 Halliburton STAGE 2
2013-03-06 H2O 0 348453 Gal 7600 Halliburton STAGE 1
2013-03-11 H2O 0 232551 Gal 406500 Halliburton STAGE 14
2013-03-08 H2O 0 255087 Gal 385700 Halliburton STAGE 3
2013-03-10 H2O 0 230305 Gal 366300 Halliburton STAGE 12
2013-03-08 H2O 0 227963 Gal 353200 Halliburton STAGE 4
2013-03-09 H2O 0 227346 Gal 373400 Halliburton STAGE 6
2013-03-09 H2O 0 229055 Gal 366200 Halliburton STAGE 5
2013-03-11 H2O 0 232641 Gal 434700 Halliburton STAGE 16
2013-03-10 H2O 0 227617 Gal 361600 Halliburton STAGE 10
2013-03-09 H2O 0 241357 Gal 422400 Halliburton STAGE 8
2013-03-10 H2O 0 235181 Gal 369600 Halliburton STAGE 9
2013-03-11 H2O 0 219059 Gal 415500 Halliburton STAGE 15
2013-03-11 H2O 0 232536 Gal 405900 Halliburton STAGE 13

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 HALCON OPERATING COMPANY INC Brine 15603 153
2014 HALCON OPERATING COMPANY INC Brine 2890 323
2015 HALCON OPERATING COMPANY INC Brine 523 149
2017 PIN OAK ENERGY PARTNERS LLC Brine 154 60
2018 PIN OAK ENERGY PARTNERS LLC Brine 94 223
2019 PIN OAK ENERGY PARTNERS LLC Brine 73 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1121477726 2013-7-9 0:00:0 PW No Violations 1.00
-1145531619 2016-8-12 0:00: PW No Violations 0.70
-1348357384 2019-3-21 0:00: PW No Violations 0.60
-1439744388 2012-11-28 0:00 DD No Violations 0.50
-1464265581 2018-1-4 0:00:0 PW No Violations
-1488797016 2013-1-3 0:00:0 DD No Violations 1.00
-1545213716 2020-2-13 0:00: PW No Violations 0.50
-1656740790 2013-3-20 0:00: DD No Violations 0.50
-1721092510 2014-6-18 0:00: PL No Violations 0.50
-1872331361 2015-4-27 0:00: PW No Violations 1.00
-419563645 2012-11-30 0:00 DD No Violations 0.30
-753371257 2013-6-3 0:00:0 DD No Violations 1.00
0419563645 2012-11-30 Drill / Deepen / Reopen No Violations My inspection found no rig activity on location. The construction crew was compacting the well pad. The drainage controls were in place around the pad. A gate was placed at the lease road entrance.
0751101011 2012-11-14 Drill / Deepen / Reopen No Violations My inspection found the well pad under construction.
0753371257 2013-06-03 Drill / Deepen / Reopen No Violations My inspection found Halcon prepping a portion of the well pad to build the tank battery. They plan to install four, 400 barrel production tanks and two compressors. The sales line was being installed on the northeast site of the site that will be run to Rt. 7. Drainage and erosion controls were in place and working properly. Grass was well established on the topsoil stockpiles and surrounding area. The proper identification was posted at the entrance. The site was surrounded by post and wire fencing with a locked gate at the entrance.
0791935617 2016-02-24 Production Wells No Violations


The equipment on the pad consists of the following: 4 Storage tanks 1 Bullet tank 1 Flare 1 Vertical heat treater 1 Fuel gas conditioning/JT skid 1 Dehydrator 1 Production well on the pad Site fenced and man doors locked

0947764826 2013-01-28 Drill / Deepen / Reopen No Violations My inspection found the Patterson Rig 256 drilling Hole #5 at a depth of 9,312. Drainage controls were in place. Permit was posted in the company mans trailer and signage was posted at the entrance.
1121477726 2013-07-09 Production Wells No Violations My inspection found the tank battery complete. The tank battery contained four, 410 bbl tanks; two for produced water and two for crude oil. The dike was made of steel that contained a liner and pea gravel. Overall completion of the well was still in progress, technicians were on location working installing flow lines and production equipment. The proper identification was posted at the entrance. Drainage control were working proper. Vegetation was well established on the topsoil stockpiles surrounding the well pad.
1145531619 2016-08-12 Production Wells No Violations


Halcon needs to: Secure the man doors.

The equipment on the pad consists of the following: 4 Storage tanks 1 Bullet tank 1 Flare 1 Vertical heat treater 1 Fuel gas conditioning/JT skid 1 Dehydrator 1 Production well on the pad Site fenced and man doors locked

1348357384 2019-03-21 Production Wells No Violations I conducted an inspection on this well site. At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the casing and flow line were open. The tank battery consisted of four 400 BBL production tanks and was diked. Other production equipment on site consisted of one butane tank and a separator. The location was stable and secondary earthern berm was intact. The signage was located on the locked gate that surrounded the site. The lease access was stable. No violations observed.
1355410296 2012-12-13 Drill / Deepen / Reopen No Violations I stopped to check on the well site. My inspection found no rig activity.
1357662409 2013-01-05 Drill / Deepen / Reopen No Violations I witnessed the cementing of the surface casing by Halliburton for Halcon Operating Company, Inc. Hole #2 was 26 in diameter and drilled to a depth of 405. The surface casing was 20 and set to a depth of 394. The surface casing assembly included a Halliburton 20 float shoe and a Halliburton Super Seal II Float collar (stab in) with one, 20 joint in between. Halcon used a Halliburton sealing sleeve adapter on the end of the drill pipe to stab into the float collar to run the cement. Halliburton filled the lines with 5 barrels of fresh water, broke circulation with 10 barrels of fresh water, pumped 50 barrels of fresh water plus 6% gel followed by 138 barrels of Class A cement. Six barrels of fresh water was used to displace the cement. I witnessed good cement return to surface. The cement held steady at the surface for 20 minutes. A wiper ball was used to displace cement inside the drill pipe leaving 40 of cement in the surface casing.
1358180870 2013-01-14 Drill / Deepen / Reopen No Violations My inspection found the Patterson Rig 256 drilling Hole #4 and at a depth of 3,336. The permit was posted in the company mans trailer. Signage was posted at the lease road entrance. Drainage controls were in place throughout the well site. The BOP was in place.
1359663100 2013-01-31 Drill / Deepen / Reopen No Violations I arrived at the site at 1445. The drillers have reached long string total depth (TD) of 10,929 (ground level). Production string is comprised of 5.5-inch casing in 8.75-inch diameter borehole. A total of 162 centralizers were deployed. Circulation of hole is in progress. Circulation from 1330 to 1500 hours. 2 times bottoms-up hole volumes achieved. Crews are commencing rig-up of cement drive head unit (Blackhawk top-drive cement head) . Company man (Brian Dutton) reports no issues or problems. At approximately 1700, cement drive head rigged up and circulation established. At 1800: safety meeting conducted by cementers (Haliburton) ahead of cementing operations. At 2145, cement circulating to the surface.
1403112802 2014-06-18 Preliminary Restoration No Violations I was on location for a preliminary restoration inspection. I found during my inspection surrounded by a fence with a locked gate. An identification sign was posted at the entrance to the well site. The berms on the south and west sides of the pad were vegetated. The land surrounding the well pad was for agriculture use. All drilling equipment had been removed. All debris was removed. Drainage and erosion controls were in place and working properly. The well was equipped for direct flow that was in production. The production tanks were surrounded by a lined steel dike. All of the production tanks spacing was in compliance. The well pad was in stable condition. The lease road was in excellent condition with crushed limestone. Restoration passed.
1439744388 2012-11-28 Drill / Deepen / Reopen No Violations My inspection found the construction crew installing the cellar.
1464265581 2018-01-04 Production Wells No Violations I conducted an inspection on this site with DOGRM inspector, John Fleming. The well was equipped with a plunger lift assembly and the annulus and flow line valves were open. Production records for this well were current. The tank battery consisted of four 400 BBL production tanks and was diked. Other production equipment on site consisted of one butane tank and a separator. The location was stable and secondary earthern berm was intact. The signage was located on the locked gate that surrounded the site. The lease access was stable. No violations observed.
1488797016 2013-01-03 Drill / Deepen / Reopen No Violations I stopped to check on the progress of drilling Hole #2. I found the rig started drilling on 1/3/2013, reached 70, and ran into problems with the cold weather. The company man expected to be back to drilling within a few hours.
1656740790 2013-03-20 Drill / Deepen / Reopen No Violations My inspection found drainage controls still in place. An identification sign was posted at the entrance. No violations.
168057768 2019-6-28 0:00: PW No Violations
1721092510 2014-06-18 Preliminary Restoration No Violations I was on location for a preliminary restoration inspection. I found during my inspection surrounded by a fence with a locked gate. An identification sign was posted at the entrance to the well site. The berms on the south and west sides of the pad were vegetated. The land surrounding the well pad was for agriculture use. All drilling equipment had been removed. All debris was removed. Drainage and erosion controls were in place and working properly. The well was equipped for direct flow that was in production. The production tanks were surrounded by a lined steel dike. All of the production tanks spacing was in compliance. The well pad was in stable condition. The lease road was in excellent condition with crushed limestone. Restoration passed.
1872331361 2015-04-27 Production Wells No Violations I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time.
751101011 2012-11-14 0:00 DD No Violations 0.50
791935617 2016-2-24 0:00: PW No Violations 0.50
947764826 2013-1-28 0:00: DD No Violations 0.50

For data sources see[7]