34-155-24086

Well Details

Well ID: 34-155-24086
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Hubbard Township
Operator Name: PAC DRILLING LLC
Well Pad ID:
Farm/Lease Name: PATTERSON
License Status: Producing
License Date: 2013-12-10
Spud Date: 2014-01-23
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2014-01-29
Well Total Depth: 5390.00 ft
Configuration: Vertical
Latitude: 41.170000
Longitude: -80.600000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-12-10 Proposed Formations:CLINTON-MEDINA, Issued Date:12/10/2013, Expired Date:12/10/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2013-12-20 ADDED FLUID WAIVER TO PERMIT CONDITIONS.
Reached Total Depth 2014-01-29
Completion Report Received 2014-04-16
Construction Permit Expires 2014-12-10
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-04-22 5072 5145 30
5072 5145 30
5072 5145 30

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-02-06 ACID 0 500 Gal 50000 Universal Well Services Inc. On 2/6/2014, I witnessed Universal Well Service stimulate the Clinton Sandstone formation for PAC Drilling. The backside annulus was completely open during the stimulation operations with no failures. There were no casing failures. A total of 27 balls were dropped. A total of 128,178 gallons of water was used. All of the stimulation equipment operated smoothly for Universal Well Service.
2014-02-03 H2O 20 3200 Bbl 50300 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 PAC DRILLING LLC 12578.00 933.00 360
2015 PAC DRILLING LLC 12918.00 512.00 360
2016 PAC DRILLING LLC 8121.00 399.00 359
2017 PAC DRILLING LLC 6526.00 192.00 359
2018 PAC DRILLING LLC 6797.00 243.00 359

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 PAC DRILLING LLC Brine 112 360
2015 PAC DRILLING LLC Brine 48 360
2016 PAC DRILLING LLC Brine 0 359
2017 PAC DRILLING LLC Brine 0 359
2018 PAC DRILLING LLC Brine 66 359

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1018230798 2014-1-23 0:00: DD No Violations 2.00
-1822456645 2017-10-11 0:00 UP No Violations 0.30
-1981073239 2017-3-21 0:00: UP No Violations
0411554187 2014-01-25 Drill / Deepen / Reopen No Violations I witnessed Universal Well Service cement the surface casing for PAC Drilling. Poulson Drilling drilled a 11 Hole #2 to 715 RBK (rig floor) and set 8.625 casing to 686 RBK with 2 centralizers. The casing was 23 lbs/ft. The bottom of the Berea Sandstone was logged at 575. Universal established circulation with 2 barrels of fresh water followed by 12 barrels of sweep and 5 barrels of a fresh water spacer. Next, the operator pumped 150 sacks of Unifill Lite as the lead cement then 125 sacks of Type 1 cement as the tail cement. The cement was displaced to 656 with 42 barrels of fresh water. I witnessed 22 barrels of good cement returned to surface. The cement held static at the surface after 15 minutes.
1018230798 2014-01-23 Drill / Deepen / Reopen No Violations I witnessed Universal Well Service cement the conductor casing for PAC Drilling. Poulson Drilling drilled a 14.75 Hole #1 to 85 RBK (rig floor) and set 11.75 casing to 61 RBK. The rig floor was 5 above ground level. Universal established circulation with 3 barrels of fresh water. The operator pumped 20 barrels of gel followed by 5 barrels of a fresh water spacer. Next, Universal pumped 125 sacks of Type 1 cement. The cement was displaced to 46 with 6 barrels of fresh water. I witnessed 7 barrels of good cement returned to surface. The cement held static as surface after 20 minutes.
1084848582 2014-12-08 UrbanPreliminary Restoration No Violations I was on location for a urban preliminary restoration. During my inspection, I found the well site graded. Vegetation was well established. The well was equipped with a plunger lift assembly. The tank battery consisted of a 210 barrel production tank, a 50 barrel brine tank and a separator. A locked, chain link fence surrounded the production equipment. The proper identification signs were posted. The proper urban safety equipment was installed. There was a dike surrounding the production equipment. The lease road was in stable condition with a gate at the entrance. Erosion and drainage controls were in place. All drilling equipment was removed. All debris was removed. The pits were filled and closed. Urban preliminary restoration passed.
1138270427 2019-02-04 UrbanProduction Wells No Violations I conducted a compliance notice follow-up inspection for compliance notice 1822456645 involving multiple compliance issues regarding urban requirements. The well needs to be fenced and at the time of this inspection, no fencing has been installed around the well. The fencing was not waived during the pre-site inspection. Identification posted at the tank battery, has been updated with the required information per 1501:9-9-05(E)(1)(a-e). There was a locked chain link fence with no barb wire around the tank battery. Install the barb wire at the top of the tank battery fence. The 210 BBL storage tank was more than 3 foot above the top of the fencing. The gate at the lease entrance needs to be closed and locked. Identification still needs installed or posted on the gate. The gate was open at the time of this inspection.

PAC needs to: 1) Post the proper identification sign and lock on the access road gate per 1501:9-9-05(E)(1)(f) and a lock. 2) Install the barb wire at the top of the chain link fence at the tank battery. 3) Install the fencing around the wellhead.

1157791334 2018-05-15 UrbanProduction Wells No Violations I conducted a compliance notice follow-up inspection for compliance notice 1822456645. There was an identification posted at the well. There was no fencing around the well; however, the well is located in a clearing surrounded by woodlands. The nearest private residence was approximately 500 feet away. The fencing was not waived during the pre-site inspection. The diked tank battery has two storage tanks and a separator. The pick-up lines are secure with plugs and the handles have been removed from the valves. The 210 BBL storage tank has the required urban safety equipment. A domestic gas supply with an open ball valve comes off of the sales line at the separator. There was an identification sign posted at the tank battery, but was missing the required information per 1501:9-9-05(E)(1)(a-e). There was a locked chain link fence with no barb wire around the well. The 210 BBL storage tank was more than 3 foot above the top of the fencing. The access road was stable, with a gate at the entrance and shared with permit #2-3966. No lock or identification sign was installed or posted on the gate.

PAC needs to: 1) Post an identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 4) Post the proper identification sign and lock on the access road gate per 1501:9-9-05(E)(1)(f). 3) Install the barb wire at the top of the chain link fence at the tank battery.

1391176671 2014-01-30 Drill / Deepen / Reopen No Violations I inspection found Universal Well Service had completed cementing the production casing for PAC Drilling. Poulson Drilling drilled a 7.875 Hole #3 to 5,390 and set 4.5 casing to 5,329 with 20 centralizers. Universal pumped 225 sacks of Unitropic cement. The cement was displaced to 5,319 with 85 barrels of water. The plug landed and held static for 5 minutes. Refer to the cement ticket for further information.
1681464228 2020-5-14 0:00: UP No Violations
1822456645 2017-10-11 UrbanProduction Wells Violations Noted

--up lines are secure with plugs and the handles have been removed from the valves. The 210 bbl. storage tank has the required urban safety equipment. A domestic gas supply with an open ball valve comes off of the sales line at the separator. There is an identification sign posted at the tank battery. The identification sign is missing the required information per 1501:9-9-05(E)(1)(a--3966. There is no lock or identification sign on the gate.

PAC needs to: 1) Post an identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 4) Post the proper identification sign and lock on the access road gate per 1501:9-9-05(E)(1)(f). 3) Install the barb wire at the top of the chain link fence at the tank battery.

1981073239 2017-03-21 UrbanProduction Wells No Violations

---9-05(E)(1)(a--3966. There is no lock or identification sign on the gate.

The equipment on the pad consists of the following:



411554187 2014-1-25 0:00: DD No Violations 4.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1822456645 US-OH-118204 2017-12-26 ID (a-i)
1822456645 US-OH-118205 2017-12-26 FENCING (a-d)

For data sources see[9]

References