34-155-24091

Well Details

Well ID: 34-155-24091
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Brookfield Township
Operator Name: AMERICAN ENERGY ASSOCIATES INC
Well Pad ID:
Farm/Lease Name: HRAY-MULLENAX DISPOSAL (SWIW #34)
License Status: Well Drilled
License Date: 2014-08-04
Spud Date: 2014-10-09
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2014-10-25
Well Total Depth: 8771.00 ft
Configuration: Vertical
Latitude: 41.220000
Longitude: -80.560000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-04 Proposed Formations:KNOX THRU MT SIMON, Issued Date:8/4/2014, Expired Date:8/3/2016 12:00:00 PM, Drilling unit acres:5, Proposed Well Type:SWD, Proposed Well Class:
Reached Total Depth 2014-10-25
Last Compliance Report 2015-05-20
Construction Permit Expires 2015-08-04
Completion Report Received 2016-04-21
Record Last Modified 2017-02-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-05-03 7838 8771 0
7838 8771 0
7838 8771 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1061351480 2015-3-19 0:00: SW No Violations
-1124380863 2015-3-5 0:00:0 SW No Violations
-1141119267 2015-6-2 0:00:0 SC No Violations
-125979674 2014-10-10 0:00 DD No Violations
-1380529985 2015-7-24 0:00: SW No Violations
-1438159529 2018-10-30 0:00 SW No Violations 0.50
-1469653185 2015-1-30 0:00: SW No Violations
-1567834029 2020-7-29 0:00: SW No Violations 1.50
-1638633318 2019-6-13 0:00: SW No Violations
-1724300433 2014-10-11 0:00 DD No Violations
-1755717321 2017-6-5 0:00:0 SW No Violations
-1769725637 2020-6-16 0:00: SW No Violations 1.00
-1836521225 2017-11-7 0:00: SW No Violations
-1919501717 2017-9-20 0:00: SW No Violations 0.50
-1963582212 2016-5-19 0:00: SW No Violations 1.50
-280310160 2020-4-20 0:00: SW No Violations 1.70
-353362374 2015-6-16 0:00: SW No Violations
-369778417 2015-2-5 0:00:0 SW No Violations
-435586800 2014-11-24 0:00 DD No Violations
-483933051 2015-4-22 0:00: SW No Violations
-503853836 2015-3-2 0:00:0 SW No Violations
-623717881 2016-3-31 0:00: SW No Violations
-688502000 2019-4-1 0:00:0 SW No Violations 0.90
-706858809 2018-2-8 0:00:0 SW No Violations 0.60
-712278911 2016-12-19 0:00 SW No Violations
-742227709 2015-1-21 0:00: SW No Violations
-754641512 2015-6-3 0:00:0 SW No Violations
-942561085 2015-9-1 0:00:0 SC No Violations
-948509381 2019-1-7 0:00:0 SW No Violations 0.50
0125979674 2014-10-10 Drill / Deepen / Reopen No Violations Drilling had stopped at a depth of 168 feet. Circulation was lost at approximately 155 feet deep. The drilling contractor was converting from fresh water to fresh water drilling mud.
0127977892 2015-02-10 Salt Water Injection Well No Violations A second mechanical integrity test was performed on the well. The tubing/casing annulus would not hold pressure. The test failed.
0353362374 2015-06-16 Salt Water Injection Well No Violations The injection pressure was below the maximum allowed. The 1/4 inch valve on the tubing was replaced. There was positive pressure on the tubing-casing annulus.

The well was in compliance.

0364042816 2015-08-18 Salt Water Injection Well No Violations The unloading pad was poured with concrete.
0369778417 2015-02-05 Salt Water Injection Well No Violations A mechanical integrity test was performed on the well. The tubing/casing annulus would not hold pressure. The test failed.
0435586800 2014-11-24 Drill / Deepen / Reopen No Violations The well site was graded. The reserve pit was solidified with three loads of kiln dust. The working pit remains open and will be used to complete the well. All conditions were acceptable.
0436366531 2015-06-04 Surface Facility Construction No Violations The inside of the containment dike was covered in a layer of pea gravel.
0483933051 2015-04-22 Salt Water Injection Well No Violations The pit solidification was complete. A contractor was moving stone on the wellsite. All conditions were acceptable.
0503853836 2015-03-02 Salt Water Injection Well No Violations The service rig was tripping out tubing, after pushing an obstruction to the bottom. The well site conditions were acceptable.
0579514303 2015-02-19 Salt Water Injection Well No Violations Appalachian Well Survey was on site to provide wireline services. A composite bridge plug was set, below the stage-tool, at 5872 feet and a cement retainer was set, above the stage-tool, at 5840 feet.
0623717881 2016-03-31 Salt Water Injection Well No Violations As of the time of inspection, the well has not been permitted to operate. The surface facility plan has not been submitted to the Division. Even though most of the surface facility has been constructed, the construction has not been approved by the Division. There were no changes onsite, since the last inspection.
0667359010 2015-06-09 Surface Facility Construction No Violations The tank battery containment dike construction was completed. No progress has been made since the last inspection.
0706858809 2018-02-08 Salt Water Injection Well No Violations I was on location to inspect the injection well. I found no change from the previous inspection. There is no evidence of recent activity.
0712278911 2016-12-19 Salt Water Injection Well No Violations As of the time of inspection, the well has not been permitted to operate. The surface facility plan has not been submitted to the Division. Even though most of the surface facility has been constructed, the construction has not been approved by the Division. There were no changes onsite, since the last inspection.
0742227709 2015-01-21 Salt Water Injection Well No Violations Contractor conducted a spinner survey on the well. Log interpretation showed the following: 95% of the water was injected between 8451 feet and 8600 feet, which coincided with the temperature change. The other 5% was injected near the top of the logged interval, between 7951 feet and 7975 feet.
0754641512 2015-06-03 Salt Water Injection Well No Violations The spray liner installation, inside the containment dike, was completed. The condition of the liner was sufficient.
0775391295 2015-04-21 Salt Water Injection Well No Violations A construction contractor was sorting debris and solidifying the drilling pits. The site conditions were acceptable.
0858958854 2015-02-03 Salt Water Injection Well No Violations The installation of the packer was witnessed. A total of 7768 feet of 2-7/8 inch tubing was ran and the packer was set. There was an indication that something in the assembly had loosened. The remainder of job was cancelled.
0914225810 2016-06-30 Salt Water Injection Well No Violations
0942561085 2015-09-01 Surface Facility Construction No Violations There were no changes, since the last inspection.
0948509381 2019-01-07 Salt Water Injection Well No Violations I found the injection well shut-in with a closed gate valve. There is no evidence of recent activity. There is a facility associated with the injection well. Installation of the facility has not been completed. There is no identification sign posted.
0951763147 2017-12-29 Salt Water Injection Well No Violations I was on location to inspect the injection well. I found no change from the previous inspection. There is no evidence of recent activity.
1061351480 2015-03-19 Salt Water Injection Well No Violations The tubing was removed from the well. The service contractor was waiting for a tool required to drill out the remedial plug.
1124380863 2015-03-05 Salt Water Injection Well No Violations Pressure tests on the well indicated that the 5-1/2 inch casing string was leaking. A second attempt was made to repair the leak. The flow rate was determined to be too high, during a preliminary injection test. The squeeze job was cancelled.
1141119267 2015-06-02 Surface Facility Construction No Violations A metal containment dike was assembled. A contractor was spraying the liner on the inside surface of the dike.
1193417173 2020-2-19 0:00: SW No Violations
127977892 2015-2-10 0:00: SW No Violations
1285641326 2015-03-06 Salt Water Injection Well No Violations A cement retainer was set at 5778 feet. The service rig was running tubing, into the well, for a squeeze job.
1380529985 2015-07-24 Salt Water Injection Well No Violations There were no changes onsite, since the last inspection.
1382454404 2014-10-12 Drill / Deepen / Reopen No Violations A 310 foot string of 11-3/4 inch diameter conductor was set inside a 14-3/4 inch diameter borehole drilled 333 feet deep and cemented with 250 sacks of Class A cement with 3% calcium chloride. Sufficient cement returns were observed at the surface.
1413844889 2014-10-09 Drill / Deepen / Reopen No Violations The well was spudded. Construction contractor was digging drilling pits, which will be lined twice with geotextile fabric and then with a 20 mil liner. All conditions were acceptable.
1418745539 2014-10-09 Drill / Deepen / Reopen No Violations The rig was drilling with fresh water at 83 feet. Construction of the drilling pits was complete. Both pits were properly lined. All conditions were acceptable.
1422557098 2015-01-29 Salt Water Injection Well No Violations The well was treated with a 1000 gallons of 28% HCl acid solution. The treatment operation and well site conditions were acceptable.
1424707118 2015-02-20 Salt Water Injection Well No Violations Pressure tests on the well indicated that the stage-tool, on the 5-1/2 inch casing string, was leaking. An attempt was made to repair the leak. First, a composite bridge plug was set below the leak. Second, a cement retainer was set above the leak. A string of tubing was inserted into the retainer. The tubing pressurized, during a preliminary injection test, indicating no leak. The squeeze job was cancelled.
1424792633 2015-02-02 Salt Water Injection Well No Violations The packer installation was postponed, because the well was flowing. The well was no longer hooked up to a tank, but shut-in. There was nobody on site. There were no additional issues of concern.
1424804227 2015-02-18 Salt Water Injection Well No Violations Pressure tests on the well indicated that the stage-tool, on the 5-1/2 inch casing string, was leaking. The service rig was pulling the tubing and packer assembly. The process was about half way complete at the time.
1429487305 2015-03-26 Salt Water Injection Well No Violations A mechanical integrity test (MIT) was performed on the newly drilled well. A pressure of 1800 psi. was placed on the tubing/casing annulus. The MIT passed with a loss of 60 psi. (3.3%) during the fifteen minute test period.
1435249708 2015-06-15 Salt Water Injection Well No Violations The containment dike area was prepared, with the base rings, for tank installation.
1435603871 2015-02-26 Salt Water Injection Well No Violations Service rig was drilling out the composite bridge plug. Well site conditions were acceptable.
1438159529 2018-10-30 Salt Water Injection Well No Violations I found no evidence of recent activity. The injection well is shut-in with a closed gate valve. The steel diked tank battery has a few inches of rain water and some vegetation. There is no identification sign.
1465909882 2016-06-13 Salt Water Injection Well No Violations I was on location for a Mechanical Integrity Test (MIT). A pressure of 1,910 psi was placed on the casing annulus 3:52 PM. The MIT passed with a loss of 70 psi (3.7%) during the 15 minute test period.
1469653185 2015-01-30 Salt Water Injection Well No Violations The purpose of this inspection was to witness the packer installation. However, the well was flowing back water. The service contractor hooked the well up to flow back into a frac tank. The packer installation was postponed.
1532355169 2018-07-23 Salt Water Injection Well No Violations I found no evidence of recent activity. The injection well is shut-in with a closed gate valve on the tubing. There is a needle valve and gauge on the annulus.
1562850619 2019-7-11 0:00: SW No Violations 1.40
1620810402 2015-03-23 Salt Water Injection Well No Violations Pressure tested the 5-1/2 inch casing above the composite bridge plug. The casing held 1830 psi. of pressure for fifteen minutes.
1655241176 2015-04-01 Salt Water Injection Well No Violations The level inside the pit was a foot from the top. The site conditions were acceptable.
1692219397 2015-02-13 Salt Water Injection Well No Violations Conditions of the work over pit and well site were acceptable.
1724300433 2014-10-11 Drill / Deepen / Reopen No Violations A mine sting was set through a suspected mine void at approximately 152 feet deep.

A 201 foot string of 16 inch diameter casing was set inside a 20 inch borehole drilled 206 feet deep and cemented with a total of 325 sacks of Class A cement with 3% calcium chloride. First, 100 sacks of cement were displaced, with 38 barrels of water, to the bottom section of casing, below the void. Second, 225 sacks of cement were pumped down the outside of the casing from the cement basket, at 117 feet, back to ground surface.

1755717321 2017-06-05 Salt Water Injection Well No Violations The injection well and surface facility were inspected. No change since last inspection and no sign of recent activity. The surface facility construction remains incomplete and the well was never hooked-up.
1836521225 2017-11-07 Salt Water Injection Well No Violations I found no change since the last inspection. The well is shut-in with a closed gate valve. There is no evidence of recent activity. The steel diked tank battery has eight (8) storage tanks. There is no identification sign posted.
1845974080 2015-03-03 Salt Water Injection Well No Violations Appalachian Well Survey was on site to provide wireline services. The well was logged and a composite bridge plug was set 5985 feet.
1919501717 2017-09-20 Salt Water Injection Well No Violations I was on location to inspect the injection well. The well is shut-in with a closed gate valve. There is no evidence of recent activity. The steel diked tank battery has eight (8) storage tanks.
1963582212 2016-05-19 Salt Water Injection Well No Violations
2072433167 2015-03-10 Salt Water Injection Well No Violations Pressure tests on the well indicated that the 5-1/2 inch casing string was leaking. A third attempt was made to repair the leak. First, a composite bridge plug was set at 5985 feet. Second, a cement retainer was set at 5778 feet. A string of tubing was inserted into the retainer. Cement, followed by an epoxy resin, was squeezed into the interval. No problems were encountered.
2138814871 2019-12-2 0:00: SW No Violations
284927806 2020-1-6 0:00:0 SW No Violations 0.50
364042816 2015-8-18 0:00: SW No Violations
436366531 2015-6-4 0:00:0 SC No Violations
579514303 2015-2-19 0:00: SW No Violations
667359010 2015-6-9 0:00:0 SC No Violations
775391295 2015-4-21 0:00: SW No Violations
858958854 2015-2-3 0:00:0 SW No Violations
914225810 2016-6-30 0:00: SW No Violations 1.00
951763147 2017-12-29 0:00 SW No Violations 0.80

For data sources see[4]