X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-24107

Well Details

Well ID: 34-155-24107
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Bristol Township
Operator Name: US ENERGY OH LLC
Well Pad ID:
Farm/Lease Name: WILDMAN UNIT
License Status: Producing
License Date: 2018-05-03
Spud Date: 2018-09-11
Spud Drilling Contractor: US ENERGY DRILLING LLC
Final Drill Date: 2019-03-13
Well Total Depth: 6670.00 ft
Configuration: Horizontal
Latitude: 41.420000
Longitude: -80.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-05-03 Proposed Formations:CLINTON, Issued Date:5/3/2018, Expired Date:5/2/2020 12:00:00 PM, Drilling unit acres:186.365, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-03-13
Correction to Well 2019-05-17 UPDATE TARGET/TAKE PER AS-DRILLED (PROPOSED PERF)
Record Last Modified 2019-05-30
Construction Permit Expires 2020-05-02

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
4120 6520 0
4120 6520 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1115963801 2018-9-19 0:00: CS No Violations 5.70
0068557350 2019-03-13 Casing String Witnessed No Violations I was on location to witness the cementing of the 4 1/2 inch production casing. U.S. Energy completed the drilling of the 6 1/4 inch borehole to a depth of 6670 feet. They ran 151 joints of 11.6 lb/ft, 4 1/2 inch casing and a 10 foot pup joint with a latch down plug to a depth of 6639 feet. Petroset Cementing Services, (PCS) was on location. PCS rigged up and established circulation to condition the borehole with 200 lbs of Wyoming Bentonite gel. PCS mixed and pumped 50 barrels of Class A cement slurry with 2% calcium chloride. Cement was scaled and verified at 15.5 ppg. The mix water pH was 6. The latch down plug was dropped and displaced at 6633 feet with 103 barrels of water. The plug landed at 1000 psi and pressure was increased to 1500 psi and held for five minutes. No change in pressure occurred and the float held once pressure was released. The well was then shut-in and PCS rigged down.
0613995165 2019-03-04 Drill / Deepen / Reopen No Violations I conducted a status check inspection on this site. Drilling activities have commenced on the 6 1/4 inch hole. At the time of this inspection, the bit depth was at 4822 feet. The site was stable. No erosion issues observed and the freeboard within the drilling pits was approximately 7 to 8 feet above the current fluid level. No violations observed.
1115963801 2018-09-19 Casing String Witnessed No Violations I was on location to witness the cementing of the 7 intermediate casing. U.S. Energy Rig #9 drilled an 8.75 to a depth of 3371 and ran 3346 of 7 intermediate casing equipped with 16 centralizers. Petroset Cementing cemented the casing with 84 barrels of Class A cement slurry. Good circulation was maintained throughout the entire job. See casing ticket for more details on this job. No violations.
1533660775 2018-08-07 Not Drilled No Violations Status check inspection of this horizontal, Clinton Sandstone well pad. The pad has been constructed and the cellar has been installed and sealed. Top soil is stockpiled on the north and east sides of the pad and is stabilized with vegetation. The pits have not been excavated and will be located on the north side of the pad. I found no violations at this time.
1536766560 2018-09-12 Drill / Deepen / Reopen No Violations Status check of U.S. Energy drilling operations. The drilling rig is an Ingersoll-Rand RD20 and will be doing the top hole (vertical section) work on this well. They spudded the well this morning and set 25 of 20 drive pipe inside the cellar. They are currently picking up the 17.5 tri-cone to drill the conductor hole. There are two (2) joints of 56lb/ft., 13.375 casing and nine (9) joints of 36lb/ft., 9.625 casing on the trailer. The drilling pit has been dug and lined on the north side of the location. There were no violations at this time.
1537278781 2018-09-18 Drill / Deepen / Reopen No Violations I was on location to check the drilling status of U.S. Energy. They are currently dusting (drilling on air) a 8.75 hole at a depth of 2310 and misting the cuttings to the pit. I inspected the intermediate casing on the racks and it is new, 20lb/ft, 7, API 5CT pipe. There are 24 joints of Range-3 casing and one (1) pup joint fitted with a guide shoe. The bow spring centralizers and wiper plug are under the doghouse. There was a small pin hole leak in the misting line and I requested that it be repaired during the next connection. There were no violations at this time.
1550761350 2019-02-21 Drill / Deepen / Reopen No Violations I was on location to conduct a status check. At the time of this inspection, US Energy was on location to begin setting up the rig and other equipment to complete the drilling of this well. Drilling pits are installed and lined. One of the pits had freshwater in it which will be used during the drilling process. The site was stable. Drilling operations to begin for the production string on this well will begin on 2/25/19. No violations observed.
1551891084 2019-02-27 Drill / Deepen / Reopen No Violations I conducted an inspection on this site. No drilling activity had commenced on location, at the time of this inspection. US Energy crew were working on repairs to the pit liners due to heavy winds the day before. No erosion issues were present and no violations were observed.
1552660185 2019-03-11 Drill / Deepen / Reopen No Violations I conducted a status check inspection on this site. Ongoing drilling activities at well location. At the time of this inspection, the bit depth was at 6364 feet. The site was stable. No erosion issues observed and the freeboard within the drilling pits was approximately 7 to 8 feet above the current fluid level. No violations observed.
2049781713 2018-09-13 Casing String Witnessed No Violations I was on location to witness the cementing of the 9.625 surface casing. U.S. Energy ran 7 joints of 26lb/ft. casing with a 21 pup joint and shoe to 312 (KB +5) with five (5) centralizers. Petroset Cementing cemented the casing with 31.5 barrels (150 sacks) of Class A cement slurry. 7 barrels of good cement circulated to surface during the job. The cement was scaled at 15.7lbs/gallon, the mix water was 77 degrees with a pH of 7, and the chlorides were measured at less than 130ppm. See casing ticket for more details on this job. No violations.
613995165 2019-3-4 0:00:0 DD No Violations
68557350 2019-3-13 0:00: CS No Violations
740276085 2019-10-2 0:00: PW No Violations

For data sources see[4]

References