34-167-23512

Well Details

Well ID: 34-167-23512
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Barlow Township
Operator Name: HEINRICH ENTERPRISES INC DBA W
Well Pad ID:
Farm/Lease Name: O' MAILLE
License Status: Final Restoration
License Date: 2010-06-07
Spud Date: 1976-06-21
Spud Drilling Contractor:
Final Drill Date: 1976-08-18
Well Total Depth: 2134.00 ft
Configuration: Vertical
Latitude: 39.360000
Longitude: -81.620000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1976-06-11 2070 HALWELL COMPANY GeoDate 6/11/76
Original Spud 1976-06-21
Completed 1976-08-18
Reached Total Depth 1976-08-18
Change of Owner 2002-02-12 Operator changed from 2070, HALWELL COMPANY to 2007, HEINRICH ENTERPRISES INC
APP 2010-06-07 Proposed Formations:BEREA, Issued Date:6/7/2010, Expired Date:6/7/2011 6:00:00 AM, Drilling unit acres:107, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2011-05-27
Construction Permit Expires 2011-06-07
Record Last Modified 2014-07-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 2087 2091 15
2087 2091 15
2087 2091 15

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1200 Bbl 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 ENERGY CONTRACTORS INC 105.00 0.00 365
1988 STONEBRIDGE OPERATING CO LLC 380.00 0.00 299
1989 ENERGY CONTRACTORS INC 1337.00 0.00 365
1990 STONEBRIDGE OPERATING CO LLC 278.00 0.00 209
1991 STONEBRIDGE OPERATING CO LLC 318.00 16.00 365
1992 STONEBRIDGE OPERATING CO LLC 369.00 0.00 365
1993 STONEBRIDGE OPERATING CO LLC 333.00 27.00 359
1994 STONEBRIDGE OPERATING CO LLC 322.00 18.00 194
1995 STONEBRIDGE OPERATING CO LLC 124.00 0.00 7
1996 STONEBRIDGE OPERATING CO LLC 18.00 0.00 7
1997 STONEBRIDGE OPERATING CO LLC 0.00 0.00 7
1998 STONEBRIDGE OPERATING CO LLC 0.00 0.00 0
2000 STONEBRIDGE OPERATING CO LLC 0.00 0.00 238
2001 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 0
2002 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
2003 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
2004 HEINRICH ENTERPRISES INC DBA W 1.00 0.00 365
2005 HEINRICH ENTERPRISES INC DBA W 1.00 0.00 365
2006 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
2007 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
2008 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
2009 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
2010 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 ENERGY CONTRACTORS INC Brine 0 365
1988 STONEBRIDGE OPERATING CO LLC Brine 0 299
1989 ENERGY CONTRACTORS INC Brine 0 365
1990 STONEBRIDGE OPERATING CO LLC Brine 0 209
1991 STONEBRIDGE OPERATING CO LLC Brine 0 365
1992 STONEBRIDGE OPERATING CO LLC Brine 0 365
1993 STONEBRIDGE OPERATING CO LLC Brine 0 359
1994 STONEBRIDGE OPERATING CO LLC Brine 0 194
1995 STONEBRIDGE OPERATING CO LLC Brine 0 7
1996 STONEBRIDGE OPERATING CO LLC Brine 0 7
1997 STONEBRIDGE OPERATING CO LLC Brine 0 7
1998 STONEBRIDGE OPERATING CO LLC Brine 0 0
2000 STONEBRIDGE OPERATING CO LLC Brine 0 238
2001 HEINRICH ENTERPRISES INC DBA W Brine 0 0
2002 HEINRICH ENTERPRISES INC DBA W Brine 0 365
2003 HEINRICH ENTERPRISES INC DBA W Brine 0 365
2004 HEINRICH ENTERPRISES INC DBA W Brine 0 365
2005 HEINRICH ENTERPRISES INC DBA W Brine 365
2006 HEINRICH ENTERPRISES INC DBA W Brine 0 365
2007 HEINRICH ENTERPRISES INC DBA W Brine 0 365
2008 HEINRICH ENTERPRISES INC DBA W Brine 0 365
2009 HEINRICH ENTERPRISES INC DBA W Brine 0 365
2010 HEINRICH ENTERPRISES INC DBA W Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1177342258 2011-8-12 0:00: FR No Violations 0.70
-1250383681 2015-11-17 0:00 FR No Violations 2.00
-1295101655 2014-1-15 0:00: FR No Violations 1.50
-146810619 2015-11-18 0:00 FR No Violations 1.50
-2043669546 2011-6-2 0:00:0 PB No Violations 0.50
-417564556 2011-11-23 0:00 FR No Violations 1.00
-542675206 2015-11-25 0:00 FR No Violations 0.50
-77503632 2017-4-11 0:00: FR No Violations 2.00
0077503632 2017-04-11 Final Restoration No Violations I was on location with Inspectors LJ Parking of the Idle and Orphan program and Matt Fulk to follow-up on a complaint received by the Division. The Division received a call from Mr. Bob Barnett in reference to this well. This well was previously plugged and passed for final restoration, but Mr. Barnett was concerned about a pit below the hill side that he believed to be used at some time by the well. The inspection revealed that there was a pit at the bottom of the hillside where the well once was the coordinates are 39.36610, -81.62067 and the pit is about 2591 square feet in area. This pit appears to have been filled in but the soil has settled down showing the shape of the pit. Vegetation has regrown in and around the pit area and the deepest part is in one corner of the pit which appeared to be approximately be two to two and a half feet deep. The rest of the remaining pit area is approximately one to one and a half feet deep. The area is in an electric line right-away and has vegetation established. There are a few pieces of 2 inch diameter black plastic lines in the hillside that appear to have been left behind from when the well was plugged. Before we left location Mr. Barnett approached us and expressed he just wanted to see the area taken care of as he wants to be able to rent the trailer that he set there and make sure it was stable and there would be no issues. Mr. Barnetts trailer rests approximately 9 feet from the ledge down to the hillside where the pit is.
0146810619 2015-11-18 Final Restoration No Violations Met with Mr. Tom Myers of Heinrich Enterprises and landowner/complainant Mr. Bob Barnett to discuss the leaking 1.25 plastic flow line at this reclaimed location. A 20 section of wire was run into the line and the end was not found. The line is still leaking gas. I informed Mr. Myers that the line will have to be pulled, cut off at its origin, and properly capped by whatever means necessary. I will also call Sam Johnson of Heinrich Enterprises and inform him of this.
0156692271 2015-11-20 Administrative Inspection No Violations Mr. Sam Johnson of Heinrich Enterprises called to notify me that the leaking 1.25 plastic flow line had been dug up as far as they could dig, cut-off, and a plug was fusion welded to the end of it to stop the leak. I will perform a follow-up inspection this week to verify that this activity was done.
0417564556 2011-11-23 Final Restoration Violations Noted Inspection this day found reclamation unsatisfactory. I had notified Christy earlier this summer that reclamation was not complete. There have been very few changes since that call. The location in general is rough and needs leveled out. The majority of soil has just been pushed over the hill. There are many large piles of soil in the flat part of the location along with sections of concrete. There are piles of gravel still on location and when you look over the edge of the location, a 2 steel line can be seen intermingled with the soil and trees that were pushed over edge. There is oil stained soil at south end of the location where the tank ruptured has healed itself. Grass is growing nicely but will have to be re-seeded when restoration is completed. Final grading must be completed on this location. The gravel pile, concrete and 2 steel piping needs to be removed from the site. The edges of the location need tapered both below and on high side of location.
0542675206 2015-11-25 Final Restoration No Violations Upon inspection, it was observed that the leaking 1.25 plastic flow line has been dug up, cut off, and plugged to stop the leak. Complainat/landowner Mr. Bob Barnett stated he is satisfied with the action taken by Heinrich Enterprises Inc. Complaint resolved.
1177342258 2011-08-12 Final Restoration No Violations Checked to see if crew had been back to finish reclamation - asked them to call me and I would meet with them to show them what more needed down - 2 weeks ago. No change to location, still needs more work before I can sign off.
1250383681 2015-11-17 Final Restoration No Violations Met with landowner/complainant Mr. Bob Barnett regarding a leaking 1.25 plastic flow line in the middle of this reclaimed well location. Upon inspection, it was observed that a 1.25 black plastic flow line is cut off flush to the ground surface and is leaking natural gas. The origin of the flow line is unknown at this point. I notified Mr. Sam Johnson of Heinrich Enterprises and he stated he would send a well tender who was present for the plugging operations to see if the origin of the line can be identified and to discuss what action needs to be taken to remove and cap the line safely.
1295101655 2014-01-15 Final Restoration No Violations Follow up to compliance notice written 11/23/11. Site has been graded. Vegetation has been established. Spoke with property owner and he stated that restoration was as good as it was going to get. Final restoration passed.
1300406174 2009-11-10 Production Wells Violations Noted

- valves shut, tank has no dike. The agreement was that they would get well going without NOV being written. Plug or produce. Post IDs with permit no. 6/2/11- RESOLVED - well is plugged.

1310475162 2011-07-11 Final Restoration No Violations Inspection found large area has been smoothed, grass growing nicely. Piece of black plastic sticking up out of ground. Not satisfied with deep ruts and piles of dirt around the edges of the location. Have a call in for Sup. Stonerock to come look at and give his opinion if satifactory. Cannot pass at this time.
1489112506 2011-06-01 Final Restoration No Violations Cre on location this day scraping up gravel to take to another location. Had moved 100 bbl and broke off nipple causing oil spill on ground - have put down pads to soak up - said it was just a tank bottom and doesnt look like over 1 bbl on ground. Dozer working on reclamation, hole has been cut off, plated and covered up.
156692271 2015-11-20 0:00 AM No Violations 0.20
1614521474 2011-07-26 Final Restoration No Violations Inspection this day with Dave Ball - wanted a 2nd opinion and he agreed reclamation was not satisfactory. Discussed what else could be done and will give Carl a call.
2043669546 2011-06-02 Plug / Plug Back No Violations
2127765236 2009-02-12 Production Wells No Violations Inspection this day found casing well - tied into line but valves shut, no chart or meter. Tank has good IDs - no permit no, no dike.. Needs NOV but have too many unresolved now. Will add to list I am keeping of his idle wells.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0417564556 US-OH-124450 2014-04-23 Failure to complete final restoration within six months
1300406174 US-OH-108457 2009-11-10 Failure to legibly identify well
1300406174 US-OH-108458 2009-11-10 Well shall be plugged