If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-167-26205 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.39,"lon":-81.31,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Washington | |
| Municipality: Newport Township | |
| Operator Name: MARTIN LARREY C | |
| Well Pad ID: | |
| Farm/Lease Name: ABICHT EARL | |
| License Status: Producing | |
| License Date: 1980-12-03 | |
| Spud Date: 1981-05-11 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1981-05-13 | |
| Well Total Depth: 575.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.390000 | |
| Longitude: -81.310000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1980-12-03 | 409 A & R ENERGY INC GeoDate 12/3/80 |
| Oil and Gas | 1980-12-03 | Issued Date 12/3/80 Expired Date Acres 0040000 Tool Type CRAF Proposed Formation MAHONING Proposed Depth 00000 Proposed Drill Depth 00000 |
| Original Spud | 1981-05-11 | |
| Completed | 1981-05-13 | |
| Reached Total Depth | 1981-05-13 | |
| Completion Report Received | 1981-07-31 | |
| Change of Owner | 2015-07-02 | Operator changed from 409, A & R ENERGY INC to 2523, MARTIN LARREY C |
| Record Last Modified | 2015-07-02 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 485 | 575 | 0 |
| 485 | 575 | 0 | |
| 485 | 575 | 0 |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | A & R ENERGY INC | 852.00 | 136.00 | 0 |
| 1986 | A & R ENERGY INC | 0.00 | 0.00 | 365 |
| 1987 | A & R ENERGY INC | 0.00 | 0.00 | 365 |
| 1989 | A & R ENERGY INC | 0.00 | 0.00 | 365 |
| 1990 | A & R ENERGY INC | 0.00 | 0.00 | 365 |
| 1991 | A & R ENERGY INC | 0.00 | 0.00 | 365 |
| 1996 | A & R ENERGY INC | 0.00 | 79.00 | 0 |
| 1997 | A & R ENERGY INC | 35.00 | 0.00 | 0 |
| 1998 | A & R ENERGY INC | 0.00 | 5.00 | 365 |
| 1999 | A & R ENERGY INC | 105.00 | 0.00 | 365 |
| 2000 | A & R ENERGY INC | 0.00 | 4.00 | 365 |
| 2001 | A & R ENERGY INC | 0.00 | 5.00 | 300 |
| 2004 | A & R ENERGY INC | 20.00 | 0.00 | 90 |
| 2005 | A & R ENERGY INC | 10.00 | 0.00 | 60 |
| 2006 | A & R ENERGY INC | 29.00 | 0.00 | 250 |
| 2007 | A & R ENERGY INC | 10.00 | 0.00 | 100 |
| 2008 | A & R ENERGY INC | 30.00 | 0.00 | 100 |
| 2009 | A & R ENERGY INC | 7.00 | 0.00 | 30 |
| 2010 | A & R ENERGY INC | 0.00 | 34.00 | 90 |
| 2011 | A & R ENERGY INC | 0.00 | 0.00 | 0 |
| 2012 | A & R ENERGY INC | 0.00 | 0.00 | 0 |
| 2013 | A & R ENERGY INC | 0.00 | 0.00 | 0 |
| 2016 | MARTIN LARREY C | 0.00 | 86.00 | 365 |
| 2017 | MARTIN LARREY C | 0.00 | 86.00 | 365 |
| 2018 | MARTIN LARREY C | 0.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | A & R ENERGY INC | Brine | 0 | 0 |
| 1986 | A & R ENERGY INC | Brine | 0 | 365 |
| 1987 | A & R ENERGY INC | Brine | 0 | 365 |
| 1989 | A & R ENERGY INC | Brine | 0 | 365 |
| 1990 | A & R ENERGY INC | Brine | 0 | 365 |
| 1991 | A & R ENERGY INC | Brine | 0 | 365 |
| 1996 | A & R ENERGY INC | Brine | 0 | 0 |
| 1997 | A & R ENERGY INC | Brine | 0 | |
| 1998 | A & R ENERGY INC | Brine | 0 | 365 |
| 1999 | A & R ENERGY INC | Brine | 0 | 365 |
| 2000 | A & R ENERGY INC | Brine | 0 | 365 |
| 2001 | A & R ENERGY INC | Brine | 0 | 300 |
| 2004 | A & R ENERGY INC | Brine | 0 | 90 |
| 2005 | A & R ENERGY INC | Brine | 0 | 60 |
| 2006 | A & R ENERGY INC | Brine | 0 | 250 |
| 2007 | A & R ENERGY INC | Brine | 0 | 100 |
| 2008 | A & R ENERGY INC | Brine | 0 | 100 |
| 2009 | A & R ENERGY INC | Brine | 0 | 30 |
| 2010 | A & R ENERGY INC | Brine | 0 | 90 |
| 2011 | A & R ENERGY INC | Brine | 0 | 0 |
| 2012 | A & R ENERGY INC | Brine | 0 | 0 |
| 2013 | A & R ENERGY INC | Brine | 0 | 0 |
| 2016 | MARTIN LARREY C | Brine | 0 | 365 |
| 2017 | MARTIN LARREY C | Brine | 0 | 365 |
| 2018 | MARTIN LARREY C | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -184233205 | 2017-10-30 0:00 | PW | No Violations | |
| -2122496210 | 2011-8-3 0:00:0 | PW | No Violations | 0.50 |
| 0184233205 | 2017-10-30 | Production Wells | No Violations | The inspection this day revealed that this well is equipped with a pumping unit, 4 1/2 inch diameter production casing, and 2 inch diameter production tubing. The valve on the wellhead is open at the time of inspection. The tank battery for this well is equipped with a 100 barrel steel tank, a vertical separator, and a meter with chart in it. There are no issues to report at this time and the well is in production at the time of inspection. |
| 1735976725 | 2007-11-20 | Production Wells | No Violations | Inspection this day found shallow Cow Run well with jack, valves open but have permit numbers changed around - 2 wells very close together - I believe is GPS reading is for jack that is Cow Run. Tank also has wrong permit numbers - |
| 2122496210 | 2011-08-03 | Production Wells | No Violations | Inspection this day found well with jack - valves open, annual production shows very marginal oil well. A & R has reportedly been trying to sell - told them they must get wells worked on and production up if that is their plans. I have hesitated to write NOVs - now no longer holding back as they have had sufficient time. |
For data sources see[8]