X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-23296

Well Details

Well ID: 34-169-23296
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Franklin Township
Operator Name: MILLER ROY/R A MILLER ENERGY L
Well Pad ID:
Farm/Lease Name: LEINER EA ETAL
License Status: Producing
License Date: 1982-04-08
Spud Date: 1982-04-23
Spud Drilling Contractor: NAU DRLG
Final Drill Date: 1982-06-05
Well Total Depth: 3769.00 ft
Configuration: Vertical
Latitude: 40.700000
Longitude: -81.890000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1982-04-08 Issued Date 4/9/82 Expired Date 10/6/82 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03769 Proposed Drill Depth 03769
Original Spud 1982-04-22
Completed 1982-06-05
Reached Total Depth 1982-06-05
Construction Permit Expires 1982-10-06
Completion Report Received 1983-04-29
CO 1983-05-02 1916 PARROT ROLLIN D GeoDate 4/8/82
Change of Owner 2015-10-14 Operator changed from 1916, PARROT ROLLIN D to 2491, MILLER ROY/RA MILLER ENER LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3684 3700 0
3684 3700 0
3684 3700 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 70000 Gal 60000 FRAC: 70MG H2O, 60M SAND, 150M N2

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 POWER GAS MARKETING & TRANS 3148.00 136.00 0
1985 POWER GAS MARKETING & TRANS 2814.00 150.00 365
1986 POWER GAS MARKETING & TRANS 2496.00 64.00 365
1987 POWER GAS MARKETING & TRANS 2376.00 70.00 365
1988 POWER GAS MARKETING & TRANS 2182.00 68.00 365
1989 POWER GAS MARKETING & TRANS 1812.00 116.00 365
1990 POWER GAS MARKETING & TRANS 1091.00 70.00 365
1993 PARROT ROLLIN D 966.00 60.00 365
1997 PARROT ROLLIN D 897.00 61.00 365
2006 PARROT ROLLIN D 270.00 0.00 180
2007 PARROT ROLLIN D 574.00 67.00 180
2008 PARROT ROLLIN D 872.00 47.00 181
2009 PARROT ROLLIN D 0.00 0.00 20
2010 PARROT ROLLIN D 1384.00 84.00 180
2011 PARROT ROLLIN D 906.00 28.00 161
2012 PARROT ROLLIN D 101.00 0.00 40
2013 PARROT ROLLIN D 78.00 0.00 10
2014 PARROT ROLLIN D 87.00 80.00 90
2015 PARROT ROLLIN D 0.00 0.00 0
2016 MILLER ROY/R A MILLER ENERGY L 0.00 0.00 365
2017 MILLER ROY/R A MILLER ENERGY L 0.00 15.00 365
2018 MILLER ROY/R A MILLER ENERGY L 645.00 45.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 POWER GAS MARKETING & TRANS Brine 61 0
1985 POWER GAS MARKETING & TRANS Brine 48 365
1986 POWER GAS MARKETING & TRANS Brine 62 365
1987 POWER GAS MARKETING & TRANS Brine 48 365
1988 POWER GAS MARKETING & TRANS Brine 48 365
1989 POWER GAS MARKETING & TRANS Brine 63 365
1990 POWER GAS MARKETING & TRANS Brine 41 365
1993 PARROT ROLLIN D Brine 65 365
1997 PARROT ROLLIN D Brine 72 365
2006 PARROT ROLLIN D Brine 60 180
2007 PARROT ROLLIN D Brine 94 180
2008 PARROT ROLLIN D Brine 0 181
2009 PARROT ROLLIN D Brine 0 20
2010 PARROT ROLLIN D Brine 409 180
2011 PARROT ROLLIN D Brine 30 161
2012 PARROT ROLLIN D Brine 0 40
2013 PARROT ROLLIN D Brine 0 10
2014 PARROT ROLLIN D Brine 0 90
2015 PARROT ROLLIN D Brine 0 0
2016 MILLER ROY/R A MILLER ENERGY L Brine 0 365
2017 MILLER ROY/R A MILLER ENERGY L Brine 0 365
2018 MILLER ROY/R A MILLER ENERGY L Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
00000PL997 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1243009540 2017-08-07 Production Wells No Violations Inspected production well on 08/07/2017. The tank battery consists of 1-100 bbl steel tank and 1-underground brine vault, located within an earthen dike; 1-vertical separator, 1-drip, and 1-meter box are located nearby. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection.
1620963411 2016-11-17 Production Wells No Violations Inspected production well on 11/17/2016. The tank battery consists of 1-100 bbl steel tank and 1-underground brine vault, located within an earthen dike; 1-vertical separator is located nearby. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection.
PL997 PL No Violations

For data sources see[9]

References