If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-24896 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.92,"lon":-81.83,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Milton Township | |
Operator Name: C & C PRODUCING LLC | |
Well Pad ID: | |
Farm/Lease Name: RIGGENBACH BROTHERS | |
License Status: Producing | |
License Date: 1992-03-03 | |
Spud Date: 1992-03-12 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1992-03-20 | |
Well Total Depth: 5781.00 ft | |
Configuration: Vertical | |
Latitude: 40.920000 | |
Longitude: -81.830000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1992-03-03 | Issued Date 3/3/92 Expired Date 3/3/93 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON/TPLU Proposed Depth 05781 Proposed Drill Depth 05781 |
Original Spud | 1992-03-10 | |
Completed | 1992-03-20 | |
Reached Total Depth | 1992-03-20 | |
CO | 1992-04-29 | 461 OBERMILLER PAUL J GeoDate 3/3/92 |
Completion Report Received | 1992-12-22 | |
Construction Permit Expires | 1993-03-03 | |
Change of Owner | 2013-12-06 | Operator changed from 461, OBERMILLER PAUL J to 8423, C & C PRODUCING LLC |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3292 | 3302 | 1 |
3272 | 3347 | 0 | |
1997-06-29 | 3272 | 3347 | 0 |
3292 | 3302 | 1 | |
3272 | 3347 | 0 | |
2006-09-11 | 5615 | 5623 | 17 |
2006-09-11 | 3340 | 3346 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 1000 Gal | 0 | FRAC W/2100BW & 30M# SAND | ||
H2O | 0 | 2100 Bbl | 3000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | OBERMILLER PAUL J | 4505.00 | 1006.00 | 163 |
1993 | OBERMILLER PAUL J | 6900.00 | 1103.00 | 365 |
1994 | OBERMILLER PAUL J | 4016.00 | 957.00 | 365 |
1995 | OBERMILLER PAUL J | 3723.00 | 980.00 | 365 |
1996 | OBERMILLER PAUL J | 3967.00 | 787.00 | 365 |
1997 | OBERMILLER PAUL J | 3776.00 | 734.00 | 365 |
1998 | OBERMILLER PAUL J | 3537.00 | 599.00 | 365 |
1999 | OBERMILLER PAUL J | 2748.00 | 710.00 | 365 |
2000 | OBERMILLER PAUL J | 3333.00 | 620.00 | 365 |
2001 | OBERMILLER PAUL J | 2785.00 | 606.00 | 365 |
2002 | OBERMILLER PAUL J | 2475.00 | 616.00 | 365 |
2003 | OBERMILLER PAUL J | 2510.00 | 607.00 | 365 |
2004 | OBERMILLER PAUL J | 2383.00 | 514.00 | 365 |
2005 | OBERMILLER PAUL J | 1869.00 | 520.00 | 365 |
2006 | OBERMILLER PAUL J | 2155.00 | 626.00 | 365 |
2007 | OBERMILLER PAUL J | 2141.00 | 417.00 | 365 |
2008 | OBERMILLER PAUL J | 1710.00 | 619.00 | 365 |
2009 | OBERMILLER PAUL J | 1839.00 | 511.00 | 365 |
2010 | OBERMILLER PAUL J | 1595.00 | 471.00 | 365 |
2011 | OBERMILLER PAUL J | 1593.00 | 528.00 | 365 |
2012 | OBERMILLER PAUL J | 1639.00 | 501.00 | 366 |
2013 | OBERMILLER PAUL J | 1274.00 | 438.00 | 365 |
2014 | C & C PRODUCING LLC | 1351.00 | 478.00 | 365 |
2015 | C & C PRODUCING LLC | 1160.00 | 635.00 | 365 |
2016 | C & C PRODUCING LLC | 1398.00 | 315.00 | 365 |
2017 | C & C PRODUCING LLC | 1269.00 | 547.00 | 365 |
2018 | C & C PRODUCING LLC | 1225.00 | 471.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | OBERMILLER PAUL J | Brine | 900 | 163 |
1993 | OBERMILLER PAUL J | Brine | 75 | 365 |
1994 | OBERMILLER PAUL J | Brine | 0 | 365 |
1995 | OBERMILLER PAUL J | Brine | 10 | 365 |
1996 | OBERMILLER PAUL J | Brine | 0 | 365 |
1997 | OBERMILLER PAUL J | Brine | 11 | 365 |
1998 | OBERMILLER PAUL J | Brine | 0 | 365 |
1999 | OBERMILLER PAUL J | Brine | 75 | 365 |
2000 | OBERMILLER PAUL J | Brine | 63 | 365 |
2001 | OBERMILLER PAUL J | Brine | 0 | 365 |
2002 | OBERMILLER PAUL J | Brine | 0 | 365 |
2003 | OBERMILLER PAUL J | Brine | 0 | 365 |
2004 | OBERMILLER PAUL J | Brine | 80 | 365 |
2005 | OBERMILLER PAUL J | Brine | 80 | 365 |
2006 | OBERMILLER PAUL J | Brine | 0 | 365 |
2007 | OBERMILLER PAUL J | Brine | 0 | 365 |
2008 | OBERMILLER PAUL J | Brine | 0 | 365 |
2009 | OBERMILLER PAUL J | Brine | 70 | 365 |
2010 | OBERMILLER PAUL J | Brine | 160 | 365 |
2011 | OBERMILLER PAUL J | Brine | 0 | 365 |
2012 | OBERMILLER PAUL J | Brine | 0 | 366 |
2013 | OBERMILLER PAUL J | Brine | 9 | 365 |
2014 | C & C PRODUCING LLC | Brine | 29 | 365 |
2015 | C & C PRODUCING LLC | Brine | 62 | 365 |
2016 | C & C PRODUCING LLC | Brine | 56 | 365 |
2017 | C & C PRODUCING LLC | Brine | 69 | 365 |
2018 | C & C PRODUCING LLC | Brine | 112 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1399376334 | 2017-4-20 0:00: | PL | No Violations | |
-1804929387 | 2017-4-20 0:00: | PW | No Violations | |
-738018540 | 2018-5-31 0:00: | PW | No Violations | |
0000004566 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 9/25/92 INSPECTOR HAROLD MORAVY DATE 09/2519/92 DATA FROM OLD VAX INFO | |
0183564319 | 2016-10-18 | Production Wells | No Violations | Inspected production well on 10/18/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike; 1-compressor is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0304983902 | 2014-11-06 | Production Wells | No Violations | This is a pumping unit well. There are no apparent problems at this time. |
0403142516 | 2016-10-18 | Preliminary Restoration | No Violations | Inspected production well on 10/18/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0568878229 | 2013-08-29 | Production Wells | No Violations | This is a pumping unit well, in operation at time of inspection. No apparent problems at this time. |
0738018540 | 2018-05-31 | Production Wells | No Violations | Inspected production well on 05/31/2018. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, 1-vertical separator, and 1-meter box with a drip, located within an earthen dike; 1-compressor with a drip is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0755570482 | 2016-07-20 | Production Wells | No Violations | Inspected production well on 07/20/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. 1-compressor is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1399376334 | 2017-04-20 | Preliminary Restoration | No Violations | Inspected production well on 04/20/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1804929387 | 2017-04-20 | Production Wells | No Violations | Inspected production well on 04/20/2017. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike; 1-compressor is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
183564319 | 2016-10-18 0:00 | PW | No Violations | |
304983902 | 2014-11-6 0:00: | PW | No Violations | 0.50 |
403142516 | 2016-10-18 0:00 | PL | No Violations | |
4566 | PL | No Violations | ||
568878229 | 2013-8-29 0:00: | PW | No Violations | 0.50 |
605136863 | 2020-5-4 0:00:0 | PW | No Violations | |
755570482 | 2016-7-20 0:00: | PW | No Violations |
For data sources see[9]