Well Details

Well ID: 34-169-24896
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Milton Township
Operator Name: C & C PRODUCING LLC
Well Pad ID:
Farm/Lease Name: RIGGENBACH BROTHERS
License Status: Producing
License Date: 1992-03-03
Spud Date: 1992-03-12
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1992-03-20
Well Total Depth: 5781.00 ft
Configuration: Vertical
Latitude: 40.920000
Longitude: -81.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1992-03-03 Issued Date 3/3/92 Expired Date 3/3/93 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON/TPLU Proposed Depth 05781 Proposed Drill Depth 05781
Original Spud 1992-03-10
Completed 1992-03-20
Reached Total Depth 1992-03-20
CO 1992-04-29 461 OBERMILLER PAUL J GeoDate 3/3/92
Completion Report Received 1992-12-22
Construction Permit Expires 1993-03-03
Change of Owner 2013-12-06 Operator changed from 461, OBERMILLER PAUL J to 8423, C & C PRODUCING LLC
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3292 3302 1
3272 3347 0
1997-06-29 3272 3347 0
3292 3302 1
3272 3347 0
2006-09-11 5615 5623 17
2006-09-11 3340 3346 1

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 1000 Gal 0 FRAC W/2100BW & 30M# SAND
H2O 0 2100 Bbl 3000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1992 OBERMILLER PAUL J 4505.00 1006.00 163
1993 OBERMILLER PAUL J 6900.00 1103.00 365
1994 OBERMILLER PAUL J 4016.00 957.00 365
1995 OBERMILLER PAUL J 3723.00 980.00 365
1996 OBERMILLER PAUL J 3967.00 787.00 365
1997 OBERMILLER PAUL J 3776.00 734.00 365
1998 OBERMILLER PAUL J 3537.00 599.00 365
1999 OBERMILLER PAUL J 2748.00 710.00 365
2000 OBERMILLER PAUL J 3333.00 620.00 365
2001 OBERMILLER PAUL J 2785.00 606.00 365
2002 OBERMILLER PAUL J 2475.00 616.00 365
2003 OBERMILLER PAUL J 2510.00 607.00 365
2004 OBERMILLER PAUL J 2383.00 514.00 365
2005 OBERMILLER PAUL J 1869.00 520.00 365
2006 OBERMILLER PAUL J 2155.00 626.00 365
2007 OBERMILLER PAUL J 2141.00 417.00 365
2008 OBERMILLER PAUL J 1710.00 619.00 365
2009 OBERMILLER PAUL J 1839.00 511.00 365
2010 OBERMILLER PAUL J 1595.00 471.00 365
2011 OBERMILLER PAUL J 1593.00 528.00 365
2012 OBERMILLER PAUL J 1639.00 501.00 366
2013 OBERMILLER PAUL J 1274.00 438.00 365
2014 C & C PRODUCING LLC 1351.00 478.00 365
2015 C & C PRODUCING LLC 1160.00 635.00 365
2016 C & C PRODUCING LLC 1398.00 315.00 365
2017 C & C PRODUCING LLC 1269.00 547.00 365
2018 C & C PRODUCING LLC 1225.00 471.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1992 OBERMILLER PAUL J Brine 900 163
1993 OBERMILLER PAUL J Brine 75 365
1994 OBERMILLER PAUL J Brine 0 365
1995 OBERMILLER PAUL J Brine 10 365
1996 OBERMILLER PAUL J Brine 0 365
1997 OBERMILLER PAUL J Brine 11 365
1998 OBERMILLER PAUL J Brine 0 365
1999 OBERMILLER PAUL J Brine 75 365
2000 OBERMILLER PAUL J Brine 63 365
2001 OBERMILLER PAUL J Brine 0 365
2002 OBERMILLER PAUL J Brine 0 365
2003 OBERMILLER PAUL J Brine 0 365
2004 OBERMILLER PAUL J Brine 80 365
2005 OBERMILLER PAUL J Brine 80 365
2006 OBERMILLER PAUL J Brine 0 365
2007 OBERMILLER PAUL J Brine 0 365
2008 OBERMILLER PAUL J Brine 0 365
2009 OBERMILLER PAUL J Brine 70 365
2010 OBERMILLER PAUL J Brine 160 365
2011 OBERMILLER PAUL J Brine 0 365
2012 OBERMILLER PAUL J Brine 0 366
2013 OBERMILLER PAUL J Brine 9 365
2014 C & C PRODUCING LLC Brine 29 365
2015 C & C PRODUCING LLC Brine 62 365
2016 C & C PRODUCING LLC Brine 56 365
2017 C & C PRODUCING LLC Brine 69 365
2018 C & C PRODUCING LLC Brine 112 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1399376334 2017-4-20 0:00: PL No Violations
-1804929387 2017-4-20 0:00: PW No Violations
-738018540 2018-5-31 0:00: PW No Violations
0000004566 Preliminary Restoration No Violations PASSED Y WITNESSED 9/25/92 INSPECTOR HAROLD MORAVY DATE 09/2519/92 DATA FROM OLD VAX INFO
0183564319 2016-10-18 Production Wells No Violations Inspected production well on 10/18/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike; 1-compressor is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0304983902 2014-11-06 Production Wells No Violations This is a pumping unit well. There are no apparent problems at this time.
0403142516 2016-10-18 Preliminary Restoration No Violations Inspected production well on 10/18/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
0568878229 2013-08-29 Production Wells No Violations This is a pumping unit well, in operation at time of inspection. No apparent problems at this time.
0738018540 2018-05-31 Production Wells No Violations Inspected production well on 05/31/2018. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, 1-vertical separator, and 1-meter box with a drip, located within an earthen dike; 1-compressor with a drip is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0755570482 2016-07-20 Production Wells No Violations Inspected production well on 07/20/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. 1-compressor is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1399376334 2017-04-20 Preliminary Restoration No Violations Inspected production well on 04/20/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes.
1804929387 2017-04-20 Production Wells No Violations Inspected production well on 04/20/2017. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike; 1-compressor is located nearby. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
183564319 2016-10-18 0:00 PW No Violations
304983902 2014-11-6 0:00: PW No Violations 0.50
403142516 2016-10-18 0:00 PL No Violations
4566 PL No Violations
568878229 2013-8-29 0:00: PW No Violations 0.50
605136863 2020-5-4 0:00:0 PW No Violations
755570482 2016-7-20 0:00: PW No Violations