If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-24956 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-81.93,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: TRANSIT ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: JAQUET | |
License Status: Producing | |
License Date: 1993-10-26 | |
Spud Date: 1993-11-09 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1993-11-14 | |
Well Total Depth: 5660.00 ft | |
Configuration: Vertical | |
Latitude: 40.900000 | |
Longitude: -81.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1993-10-26 | Issued Date 10/26/93 Expired Date 10/26/94 Acres 0118320 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 05660 Proposed Drill Depth 05660 |
Original Spud | 1993-11-07 | |
Completed | 1993-11-14 | |
Reached Total Depth | 1993-11-14 | |
CO | 1994-01-30 | 164 PETRO EVALUATION SERV INC GeoDate 10/26/93 |
Completion Report Received | 1994-02-07 | |
CO | 1994-09-15 | 513 DALTON & HANNA CO GeoDate 10/26/93 |
Construction Permit Expires | 1994-10-26 | |
Correction to Well | 2013-02-22 | UNIT SIZE CHANGED TO 44.50 ACRES. |
Change of Owner | 2017-03-31 | Operator changed from 513, DALTON & HANNA LTD to 2771, TRANSIT ENERGY INC |
Record Last Modified | 2019-06-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5590 | 0 | |
5590 | 0 | ||
5590 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 2000 Gal | 0 | TREATED W/2000 GAL HCL |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | PETRO EVALUATION SERVICES INC | 482.00 | 2547.00 | 120 |
1995 | DALTON & HANNA LTD | 5266.00 | 3754.00 | 365 |
1996 | DALTON & HANNA LTD | 4579.00 | 2153.00 | 365 |
1998 | DALTON & HANNA LTD | 2544.00 | 1254.00 | 365 |
1999 | DALTON & HANNA LTD | 1650.00 | 1002.00 | 365 |
2000 | DALTON & HANNA LTD | 856.00 | 261.00 | 365 |
2001 | DALTON & HANNA LTD | 430.00 | 0.00 | 365 |
2002 | DALTON & HANNA LTD | 1330.00 | 534.00 | 365 |
2003 | DALTON & HANNA LTD | 1038.00 | 361.00 | 365 |
2004 | DALTON & HANNA LTD | 438.00 | 685.00 | 365 |
2005 | DALTON & HANNA LTD | 1235.00 | 660.00 | 365 |
2006 | DALTON & HANNA LTD | 1090.00 | 663.00 | 365 |
2007 | DALTON & HANNA LTD | 996.00 | 634.00 | 365 |
2008 | DALTON & HANNA LTD | 735.00 | 603.00 | 365 |
2009 | DALTON & HANNA LTD | 635.00 | 629.00 | 365 |
2010 | DALTON & HANNA LTD | 475.00 | 349.00 | 365 |
2011 | DALTON & HANNA LTD | 546.00 | 429.00 | 365 |
2012 | DALTON & HANNA LTD | 572.00 | 454.00 | 366 |
2013 | DALTON & HANNA LTD | 572.00 | 464.00 | 365 |
2014 | DALTON & HANNA LTD | 546.00 | 525.00 | 365 |
2015 | DALTON & HANNA LTD | 532.00 | 262.00 | 365 |
2016 | DALTON & HANNA LTD | 570.00 | 491.00 | 365 |
2017 | DALTON & HANNA LTD | 209.00 | 164.00 | 365 |
2018 | TRANSIT ENERGY INC | 420.00 | 490.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | PETRO EVALUATION SERVICES INC | Brine | 0 | 120 |
1995 | DALTON & HANNA LTD | Brine | 0 | 365 |
1996 | DALTON & HANNA LTD | Brine | 0 | 365 |
1998 | DALTON & HANNA LTD | Brine | 0 | 365 |
1999 | DALTON & HANNA LTD | Brine | 0 | 365 |
2000 | DALTON & HANNA LTD | Brine | 0 | 365 |
2001 | DALTON & HANNA LTD | Brine | 0 | 365 |
2002 | DALTON & HANNA LTD | Brine | 0 | 365 |
2003 | DALTON & HANNA LTD | Brine | 0 | 365 |
2004 | DALTON & HANNA LTD | Brine | 0 | 365 |
2005 | DALTON & HANNA LTD | Brine | 0 | 365 |
2006 | DALTON & HANNA LTD | Brine | 0 | 365 |
2007 | DALTON & HANNA LTD | Brine | 0 | 365 |
2008 | DALTON & HANNA LTD | Brine | 0 | 365 |
2009 | DALTON & HANNA LTD | Brine | 0 | 365 |
2010 | DALTON & HANNA LTD | Brine | 0 | 365 |
2011 | DALTON & HANNA LTD | Brine | 0 | 365 |
2012 | DALTON & HANNA LTD | Brine | 0 | 366 |
2013 | DALTON & HANNA LTD | Brine | 80 | 365 |
2014 | DALTON & HANNA LTD | Brine | 0 | 365 |
2015 | DALTON & HANNA LTD | Brine | 0 | 365 |
2016 | DALTON & HANNA LTD | Brine | 0 | 365 |
2017 | DALTON & HANNA LTD | Brine | 0 | 365 |
2018 | TRANSIT ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1033727119 | 2017-1-18 0:00: | PL | No Violations | |
-1600617074 | 2015-8-12 0:00: | PW | No Violations | 0.50 |
-1858360090 | 2020-5-26 0:00: | PW | No Violations | |
-323504388 | 2016-8-8 0:00:0 | PW | No Violations | |
-422065918 | 2019-7-29 0:00: | PW | No Violations | |
0267056944 | 2017-01-18 | Production Wells | No Violations | Inspected production well on 01/18/2017. The tank battery consists of 1-210 bbl steel tank, 3-100 bbl steel tanks, 1-vertical separator, 1-horizontal separator, and 1-underground brine vault, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0323504388 | 2016-08-08 | Production Wells | No Violations | Inspected production well on 08/08/2016. The tank battery consists of 1-210 bbl steel tank, 3-100 bbl steel tanks, 1-vertical separator, 1-horizontal separator, and 1-underground brine vault, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0424097357 | 2018-02-28 | Production Wells | No Violations | Inspected production well on 02/28/2018. The tank battery consists of 1-210 bbl steel tank, 1-100 bbl steel tank, 1-horizontal separator, 1-meter box (shared), and 1-underground brine vault (shared), located within an earthen dike; the diked area and noted equipment are shared with the Jaquet #1-A well (PN: 169-23427). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0485970305 | 2014-06-09 | Production Wells | No Violations | This pumping unit well has no apparent problems at this time. |
0916654439 | 2015-12-09 | Production Wells | No Violations | Inspected production well on 12/09/2015. The tank battery consists of 1-210 bbl steel tank, 3-100 bbl steel tanks, 1-vertical separator, 1-horizontal separator, and 1-underground brine vault located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1033727119 | 2017-01-18 | Preliminary Restoration | No Violations | Inspected production well on 01/18/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1201386219 | 2013-06-13 | Production Wells | No Violations | This is a pump jack well. No apparent problems at this time. |
1600617074 | 2015-08-12 | Production Wells | No Violations | This pump jack well has no apparent problems. There are no evident compliance issues at this time. |
267056944 | 2017-1-18 0:00: | PW | No Violations | |
424097357 | 2018-2-28 0:00: | PW | No Violations | |
485970305 | 2014-6-9 0:00:0 | PW | No Violations | 0.50 |
916654439 | 2015-12-9 0:00: | PW | No Violations |
For data sources see[9]