If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-81.94,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Wayne Township | |
Operator Name: PETRO EVALUATION SERVICES INC | |
Well Pad ID: | |
Farm/Lease Name: ERDOS | |
License Status: Producing | |
License Date: 2011-06-23 | |
Spud Date: 1994-12-05 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1994-12-12 | |
Well Total Depth: 5711.00 ft | |
Configuration: Vertical | |
Latitude: 40.900000 | |
Longitude: -81.940000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1994-09-26 | Issued Date 9/26/94 Expired Date 9/26/95 Acres 0145060 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 05711 Proposed Drill Depth 05711 |
Original Spud | 1994-12-04 | |
Completed | 1994-12-12 | |
Reached Total Depth | 1994-12-12 | |
CO | 1995-03-01 | 164 PETRO EVALUATION SERV INC GeoDate 9/26/94 |
Completion Report Received | 1995-11-14 | |
APP | 2010-09-09 | Proposed Formations:TREMPEALEAU, Issued Date:9/9/2010, Expired Date:9/8/2012 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class: |
APP | 2011-06-23 | Proposed Formations:CLINTON, Issued Date:6/23/2011, Expired Date:6/22/2013 12:00:00 PM, Drilling unit acres:145, Proposed Well Type:OG, Proposed Well Class:POOL |
Plugged Back | 2011-08-30 | |
Construction Permit Expires | 2013-06-22 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5562 | 0 | |
5562 | 0 | ||
5562 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 2000 Gal | 0 | TREATED W/2000 GAL HCL ACID |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1061414128 | 2016-9-14 0:00: | PW | No Violations | |
-1170018718 | 2015-12-8 0:00: | PW | No Violations | |
-1232231033 | 2015-8-12 0:00: | PW | No Violations | 0.50 |
-1289988120 | 2011-8-30 0:00: | PB | No Violations | 4.00 |
-2078566077 | 2018-2-28 0:00: | PW | No Violations | |
-413778803 | 2011-8-25 0:00: | PB | No Violations | 2.70 |
0000006595 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 5/11/95 INSPECTOR MARK MORELAND DATE 05/1119/95 DATA FROM OLD VAX INFO | |
0393370314 | 2017-01-18 | Production Wells | No Violations | Inspected production well on 01/18/2017. The tank battery consists of 3-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
0413778803 | 2011-08-25 | Plug / Plug Back | No Violations | Wait 2.5 hours on service rig. |
0489386371 | 2017-01-18 | Preliminary Restoration | No Violations | Inspected production well on 01/18/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
0532564222 | 2011-09-08 | Completion Testing | No Violations | Well has been plugged back to the Clinton. Packer set at 3100 for cement job and retainer set at 3595. Did not witness cement job and received cement bond log for Columbus. |
0770320937 | 2014-04-23 | Production Wells | No Violations | This is a producing pumping unit well in operation at time of inspection. No apparent problems at this time. |
1061414128 | 2016-09-14 | Production Wells | No Violations | Inspected production well on 09/14/2016. The tank battery consists of 3-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack, but the motor has been removed (electric hook-up present). Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1170018718 | 2015-12-08 | Production Wells | No Violations | Inspected production well on 12/08/2015. The tank battery consists of 3-100 bbl steel tanks, 1-50 bbl steel tank, and 1-vertical separator located within an earthen dike. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Well identification is posted at the wellhead as required. No problems were noted at the time of the inspection. |
1187992266 | 2011-08-31 | Plug / Plug Back | No Violations | Wait on log truck to set cement retainer. Perforated and cemented 4.5 casing. |
1232231033 | 2015-08-12 | Production Wells | No Violations | This pumping unit well has no apparent problems nor compliance issues at this time. |
1289988120 | 2011-08-30 | Plug / Plug Back | No Violations | Met Steve Franks on site. The plan is to run a free point, see where casing is free and then try to shoot holes or shoot casing and if possible make a Clinton plug back. Waiting on completion company. |
1317402339 | 2011-08-26 | Plug / Plug Back | No Violations | Arrive for plug job and or plug back. Set bottom plug thru 4.5 casing (Omega - Greg). |
1317727728 | 2011-09-06 | Plug / Plug Back | No Violations | Service rig has moved out, tubing remains on site. Valves shut in on top of 4.5 casing. Was told serice rig would be working today? |
1395529332 | 2011-08-29 | Plug / Plug Back | No Violations | Arrive for plug back and could not get 4.5 casing to rip. No telegraph. Had Omega test casing and then pump annular volume and could not circulate. Tried working casing and pumping with no luck. Advised operator to call shooters and perforate casing in two places below Clinton for plug. |
1609842512 | 2020-5-26 0:00: | PW | No Violations | |
2052120160 | 2019-7-18 0:00: | PW | No Violations | |
2078566077 | 2018-02-28 | Production Wells | No Violations | Inspected production well on 02/28/2018. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared), 1-vertical separator (shared), and 1-meter box (shared), located within an earthen dike; the diked area and noted equipment are shared with the Erdos #1-A well (PN: 169-24998). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. No problems were noted at the time of the inspection. |
393370314 | 2017-1-18 0:00: | PW | No Violations | |
489386371 | 2017-1-18 0:00: | PL | No Violations | |
532564222 | 2011-9-8 0:00:0 | CT | No Violations | 1.50 |
6595 | PL | No Violations | ||
770320937 | 2014-4-23 0:00: | PW | No Violations | 0.50 |
For data sources see[9]