If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25045 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.94,"lon":-82.02,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Congress Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: CHURCH OF THE BRETHREN #1 | |
License Status: Producing | |
License Date: 1995-05-15 | |
Spud Date: 1995-09-13 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1995-09-20 | |
Well Total Depth: 5238.00 ft | |
Configuration: Vertical | |
Latitude: 40.940000 | |
Longitude: -82.020000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1995-05-15 | 182 BELDEN & BLAKE CO GeoDate 5/15/95 |
Oil and Gas | 1995-05-15 | Issued Date 5/15/95 Expired Date 5/14/96 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON/CPRG Proposed Depth 05238 Proposed Drill Depth 05238 |
Original Spud | 1995-09-13 | |
Completed | 1995-09-20 | |
Reached Total Depth | 1995-09-20 | |
Completion Report Received | 1995-10-26 | |
Construction Permit Expires | 1996-05-14 | |
Change of Owner | 2007-04-27 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5132 | 0 | |
5132 | 0 | ||
2006-09-11 | 5159 | 5189 | 60 |
5159 | 5189 | 60 | |
5132 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 700 Gal | 0 | TREATED W/700 GAL 15% FE ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | BELDEN & BLAKE CORPORATION | 466744.00 | 2417.00 | 366 |
1997 | BELDEN & BLAKE CORPORATION | 361835.00 | 931.00 | 338 |
1998 | BELDEN & BLAKE CORPORATION | 17865.00 | 0.00 | 300 |
1999 | BELDEN & BLAKE CORPORATION | 77923.00 | 89.00 | 348 |
2000 | BELDEN & BLAKE CORPORATION | 18409.00 | 0.00 | 363 |
2001 | BELDEN & BLAKE CORPORATION | 2684.00 | 94.00 | 351 |
2002 | BELDEN & BLAKE CORPORATION | 1634.00 | 0.00 | 334 |
2003 | BELDEN & BLAKE CORPORATION | 1129.00 | 35.00 | 293 |
2004 | BELDEN & BLAKE CORPORATION | 1451.00 | 0.00 | 321 |
2005 | BELDEN & BLAKE CORPORATION | 1172.00 | 10.00 | 334 |
2006 | BELDEN & BLAKE CORPORATION | 975.00 | 0.00 | 334 |
2007 | ENERVEST OPERATING LLC | 733.00 | 1.00 | 365 |
2008 | ENERVEST OPERATING LLC | 752.00 | 0.00 | 365 |
2009 | ENERVEST OPERATING LLC | 9156.00 | 409.00 | 365 |
2010 | ENERVEST OPERATING LLC | 3857.00 | 0.00 | 365 |
2011 | ENERVEST OPERATING LLC | 2578.00 | 0.00 | 0 |
2012 | ENERVEST OPERATING LLC | 2370.00 | 29.00 | 366 |
2013 | ENERVEST OPERATING LLC | 602.00 | 0.00 | 365 |
2014 | ENERVEST OPERATING LLC | 301.00 | 0.00 | 365 |
2015 | ENERVEST OPERATING LLC | 1493.00 | 0.00 | 242 |
2016 | ENERVEST OPERATING LLC | 1308.00 | 0.00 | 366 |
2017 | ENERVEST OPERATING LLC | 1892.00 | 32.00 | 365 |
2018 | ENERVEST OPERATING LLC | 1644.00 | 0.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1752299968 | 2018-11-13 0:00 | PW | No Violations | |
0409708102 | 2018-03-15 | Production Wells | No Violations | Inspected production well on 03/15/2018. The tank battery consists of 1-210 bbl steel tank, 1-50 bbl steel tank, 1-vertical separator, 1-drip, 1-meter box, and 1-compressor with a drip (shared), located within an earthen dike; 1-heater unit is located within a separate earthen dike nearby. Both diked areas are located within unlocked metal fences, and the diked areas and noted equipment are shared with the Church #2 well (PN: 169-25119). The well is equipped with a pump jack with a natural gas-powered motor, located within an unlocked metal fence. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0540271853 | 2016-04-04 | Production Wells | No Violations | Inspected production well on 04/04/2016. The tank battery consists of 3-210 bbl steel tanks, 2-50 bbl steel tanks, 2-vertical separators, and 1-compressor located within an earthen dike; the diked area is located within an unlocked metal fence. 2-heater units are located within a separate earthen dike and unlocked metal fence nearby. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor located within a locked metal fence. Well identification is posted at the wellhead as required. 1-25 bbl fiberglass tank is located near the well. It is not hooked-up, nor is it diked, and must be removed. Additionally, the area within the earthen dike at the tank battery needs to be cleaned-up. Bill, Enervests pumper, was notified of these issues and will address them promptly. No other problems were noted at the time of the inspection. |
1328908599 | 2017-03-08 | Preliminary Restoration | No Violations | Inspected production well on 03/08/2017. All drilling equipment and debris have been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1489581518 | 2017-03-08 | Production Wells | No Violations | Inspected production well on 03/08/2017. The tank battery consists of 1-210 bbl steel tank, 1-50 bbl steel tank, 1-vertical separator, and 1-compressor (shared), located within an earthen dike. The diked area is located within an unlocked metal fence, and is shared with the tank battery for the Church #2 well (PN: 169-25119). 1-heater unit is located within a separate earthen dike nearby; the diked area is located within a locked metal fence. The well is equipped with a pump jack with a natural gas-powered motor, located within a locked metal fence. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1752299968 | 2018-11-13 | Production Wells | No Violations | Inspected production well on 11/13/2018. The tank battery consists of 1-210 bbl steel tank, 1-50 bbl steel tank, 1-vertical separator, 1-drip, 1-meter box, and 1-compressor with a drip and meter box (shared), located within an earthen dike; the diked area is located within an unlocked metal fence. 1-heater unit is located within a separate earthen dike and locked metal fence nearby. Both diked areas and noted equipment are shared with the tank battery for the Church #2 well (PN: 169-25119). The well is equipped with a pump jack with a natural gas-powered motor, located within an unlocked metal fence. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
409708102 | 2018-3-15 0:00: | PW | No Violations | |
540271853 | 2016-4-4 0:00:0 | PW | No Violations | |
773577258 | 2020-5-6 0:00:0 | PW | No Violations |
For data sources see[9]